← Back
BuildNYC
Two family converted from one family
732 DESMOND COURT
BROOKLYN · BIN 3195570
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R4Zoning
1,480 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.37 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
Filed — no permit issued15p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Focal Point Architects & Associates102/03/2026
Rahman Consulting309/29/2025
MSM Engineering Services404/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mister Expediter703/21/2026
Building Lifecycle
02/26/2026
Objection resolved — Addressed
02/13/2026
Objection raised — Energy
02/13/2026
Objection raised — Admin
02/13/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Zoning
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 09/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/29/2025——Heating and Air Conditioning Systems
1 project · most recent 09/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/29/2025——Gas, Water/Sanitary
1 project · most recent 09/29/2025
Steel Concrete Wood
FiledStatusContractorScope
09/29/2025——Steel, Concrete, Wood
1 project · most recent 09/29/2025
Fence
FiledStatusContractorScope
09/29/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Structural Wood Frame—progress
09/15/2025Structural Steel - Welding—special
09/15/2025Structural Steel - High Strength Bolting—special
09/15/2025Structural Steel - Details—special
09/15/2025Structural Cold-Formed Steel—special
04/24/2025HVAC-R and service water piping design and insulation—energy_progress
04/24/2025Ventilation and air distribution system—energy_progress
04/24/2025HVAC-R and service water heating equipment—energy_progress
04/24/2025HVAC-R and service water heating system controls—energy_progress
04/22/2025HVAC-R and service water heating equipment—energy_progress
04/22/2025Fire-Resistant Penetrations and Joints—special
04/22/2025HVAC-R and service water piping design and insulation—energy_progress
04/22/2025Permanent certificate—energy_progress
04/22/2025HVAC-R and service water heating system controls—energy_progress
04/22/2025Energy Code Compliance Inspections—progress
04/22/2025Maintenance information—energy_progress
03/26/2025Structural Stability – Alterations of existing buildings—special
03/26/2025Structural Stability – Alterations of existing buildings—special
03/25/2025Maintenance information—energy_progress
03/25/2025Interior lighting power—energy_progress
03/25/2025Electric vehicle service equipment requirements—energy_progress
03/25/2025Metering—energy_progress
03/12/2025Final—progress
03/12/2025Mechanical Systems—special
Latest 25 of 40.
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account