Elevator apt, semi-fireproof with stores
733-749 Crotona Park North Condominium
733 CROTONA PARK NORTH · Tremont · BIN 2131090
💬 Discuss this project
2024Year Built
8Stories
D7Building Class
—Zoning
84,469 sfGross Floor Area
85Units
Rent Stabilized1 Open Violation ▸
Elevator apt, semi-fireproof with stores · Owner of record: CROTONA PARK NORTH PLUS LLC · 16,442 sf lot · 5.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 3 filings · 20 docs
Floor 7Under Construction5p · 1 filing · 20 docs
Floor 6Under Construction3p · 1 filing · 20 docs
Floor 5Under Construction1p · 1 filing · 20 docs
Floor 4Under Construction2p · 1 filing · 20 docs
Floor 3Under Construction5p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1Under Construction15p · 1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
Site & exterior6 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AFFORDABLELIVINGNY4309/09/2026
OWNERS REP1407/08/2026
SIERRA CONSTRUCTION NY307/08/2026
2995 CONEY ISLAND407/08/2026
CROTONA PARK NORTH PLUS LLC503/22/2026
PARK MANAGEMENT USA103/22/2026
MANAGEMENT USA CORP PARK203/22/2026
CROTONA PARK DEPARTMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2020$955K—Private party → CROTONA PARK NORTH PLUS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1303/21/2026
MENZAK ARCHITECT P C203/21/2026
AE DESIGN SOLUTION1603/21/2026
SIERRA SAFETY CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK MANAGEMENT USA CORPGeneral Contractor2609/09/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1107/08/2026
GV IMPERIAL CONSTGROUP INGeneral Contractor903/21/2026
POWER DIRECT ELECTRIC INC 005103General Contractor603/22/2026
TOVIA WERZBERGERElectrical603/21/2026
PRIME PIPING & HEATING INFire Protection407/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
EDWARD BUILDERS INCGeneral Contractor107/08/2026
DESIGN N SAFETY INCGeneral Contractor107/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
MENZAK ARCHITECT P CGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161705/28/2026
LEO Y LEE ASSOCIATES2481108/23/2024
BIG APPLE GROUP NY A RMA9168305/29/2024
Building Lifecycle
All (223)Filed (39)Permit Issued (30)Signed Off (16)Violation (3)Inspection (26)Objection (79)Special Inspection (30)
09/08/2026
Permit issued — General Construction
X00692593-I1-GC
08/31/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/14/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/26/2026
Permit issued — General Construction
X00692593-I1-GC
06/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2026
Permit issued — Mechanical Systems
X00692593-Z8-MS
06/02/2026
Permit issued — Plumbing
X00692593-Z6-PL
06/02/2026
Permit issued — Sprinklers
X00692593-Z7-EW-SP
05/28/2026
Filed — New Building
File PAA in order to make correction in SOW for the Plumbing Components.
X00692593-Z7
05/28/2026
Filed — New Building
File PAA in order to make correction in SOW for the Plumbing Components.
X00692593-Z8
05/27/2026
Special inspection requirement — Ventilation and air distribution system
SHAHRIAR QUAYYUM
05/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
05/26/2026
Filed — New Building
File PAA in order to make correction in SOW for the Plumbing Components.
X00692593-Z6
05/26/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
SHAHRIAR QUAYYUM
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
05/25/2026
Filed — New Building
File PAA in order to make correction in SOW for the Plumbing Components.
X00692593-B1
05/25/2026
Special inspection requirement — Preliminary
FAHAD FATEH
05/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
05/25/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/25/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
05/25/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/25/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/25/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/25/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/25/2026
Special inspection requirement — Metering
FAHAD FATEH
05/25/2026
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
05/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
05/25/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/25/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
05/25/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/13/2026
Permit issued — General Construction
X00692593-I1-GC
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/17/2026
Objection resolved — Resolved
04/07/2026
Objection raised — Other
03/16/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/06/2026
Filed — New Building
File PAA in order to make correction in SOW for the Plumbing Components.
X00692593-A9
01/21/2026
Objection raised — Admin
01/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Filed — New Building
File PAA in order to make correction in SOW for the Plumbing Components.
X00692593-A7
10/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2025
Signed off — Alteration
Temporary 8' High Construction Solid Fence
X00505975-I1
07/08/2025
Permit issued — Construction Fence
X00505975-I1-FN
05/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 223 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP09/08/2026
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP06/26/2026
DOB NOWMechanical SystemsPermit IssuedPARK MANAGEMENT USA CORP06/04/2026
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN06/02/2026
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN06/02/2026
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP05/13/2026
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP07/08/2025
DOB NOWMechanical SystemsSigned-offPARK MANAGEMENT USA CORP04/22/2025
DOB NOWCurb CutSigned-offPARK MANAGEMENT USA CORP03/26/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC09/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offPARK MANAGEMENT USA CORP09/04/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/23/2024
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP08/19/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/08/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC07/17/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/17/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/17/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC07/17/2024
DOB NOWEarth WorkPermit IssuedPARK MANAGEMENT USA CORP07/10/2024
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP06/21/2024
DOB NOWStructuralSigned-offPARK MANAGEMENT USA CORP06/21/2024
DOB NOWSupport of ExcavationSigned-offPARK MANAGEMENT USA CORP06/18/2024
DOB NOWFoundationPermit IssuedPARK MANAGEMENT USA CORP05/28/2024
DOB NOWStructuralSigned-offGV IMPERIAL CONSTGROUP IN06/27/2022
DOB NOWSupport of ExcavationSigned-offGV IMPERIAL CONSTGROUP IN06/10/2022
DOB NOWEarth WorkPermit IssuedGV IMPERIAL CONSTGROUP IN06/06/2022
DOB NOWConstruction FenceSigned-offDELRIC CONSTRUCTION CO01/03/2022
DOB NOWConstruction FenceSigned-offDESIGN N SAFETY INC08/19/2021
1 project · most recent 05/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026Permit IssuedPARK MANAGEMENT USA CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXF12AXVJU 54,000 BTU · Heat Pump Outdoor ×159
Mitsubishi Electric MITSUBISHI PUMY-P36NKMU3 54,000 BTU · Vrf Outdoor ×159
Ventilation
Daikin RX24WMVJU9 755 CFM · Erv ×1
Enervex BEF-355X 1,320 CFM · Exhaust Fan ×2
Renewaire HE-1.5XRT 755 CFM · Erv ×1
1 project · most recent 05/28/2026
Sprinkler System
FiledStatusContractorScope
05/28/2026Permit IssuedPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/28/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/28/2026Permit IssuedA M B MECHANICAL INCStorm, Water/Sanitary
6 projects · most recent 09/02/2025
General Wiring
FiledStatusContractorScope
09/02/2025CompletePOWER DIRECT ELECTRIC INC—
07/21/2025CompletePOWER DIRECT ELECTRIC INC88 meters, 88 new_meters
03/24/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
10/07/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/07/2024CompleteSOLAS ELECTRICAL CORP—
04/09/2024CompletePOWER DIRECT ELECTRIC INC3 meters, 3 new_meters
1 project · most recent 05/28/2026
Concrete
FiledStatusContractorScope
05/28/2026Permit IssuedPARK MANAGEMENT USA CORPConcrete
1 project · most recent 05/28/2026
Fence
FiledStatusContractorScope
05/28/2026Permit IssuedPARK MANAGEMENT USA CORPFence
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
08/31/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/14/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/16/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/02/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/30/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/31/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
12/13/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/29/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/29/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/27/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
05/27/2026Ventilation and air distribution systemSHAHRIAR QUAYYUMenergy_progress
05/26/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
05/26/2026Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
05/26/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
05/26/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
05/26/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
05/26/2026FinalSHAHRIAR QUAYYUMprogress
05/26/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
05/26/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
05/26/2026Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
05/26/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
05/26/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
05/25/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/25/2026Permanent certificateFAHAD FATEHenergy_progress
05/25/2026Interior lighting powerFAHAD FATEHenergy_progress
05/25/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/25/2026Fenestration air leakageFAHAD FATEHenergy_progress
05/25/2026MeteringFAHAD FATEHenergy_progress
05/25/2026Air barrier continuity plan testingFAHAD FATEHenergy_progress
05/25/2026Maintenance informationFAHAD FATEHenergy_progress
05/25/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/25/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
05/25/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/25/2026Lighting controlsFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch39
08/25/2026X00505975-I1Request digital key ↗
08/21/2026X01084848-I1Request digital key ↗
08/21/2026X01090242-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
04/04/2025240329667Open ↗
03/31/2025220743104Open ↗
06/23/2022240329667Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
04/15/2025220743104Open ↗
04/15/2025220743104Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/31/2025240329667Open ↗
▸Zoning, Tax Lot & Property Records20
▸DOB NOWZD1: DOB Zoning Diagram7
08/16/2026X00692593-B1Open ↗
08/13/2026X00692593-A9Open ↗
08/13/2026X00692593-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/16/2026X00692593-B1Open ↗
08/13/2026X00692593-A9Open ↗
08/13/2026X00692593-A3Open ↗
Showing 3 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/15/2025220743104Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/15/2025220743104Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/15/2025220743104Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/15/2025220743104Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/15/2025220743104Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00692593-I1Open ↗
▸Seals & Professional Certifications86
▸DOB NOWDPL-1: Design Professional Seal & Signature39
08/25/2026X00505975-I1Open ↗
08/21/2026X01084848-I1Open ↗
08/21/2026X01090242-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/02/2026X00692593-Z6Open ↗
09/02/2026X00692593-Z6Open ↗
08/31/2026X00692593-S3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/02/2026X00692593-Z6Open ↗
09/02/2026X00692593-Z6Open ↗
08/31/2026X00692593-S3Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/23/2022240329667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/23/2022240329667Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026X00692593-A3Open ↗
08/13/2026X00692593-P1Open ↗
08/13/2026X00692593-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X00692593-I1—
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist7
08/16/2026X00692593-B1Open ↗
08/13/2026X00692593-A9Open ↗
08/13/2026X00692593-A7Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
12/23/2024240329667Open ↗
▸BISSTREET TREE CHECKLIST1
12/23/2024240329667Open ↗
▸BISSTREET TREES SITE PLAN1
07/28/2025240329667Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00692593-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00692593-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00692593-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00692593-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/16/2026X00692593-B1Open ↗
08/13/2026X00692593-P2Open ↗
08/13/2026X00692593-A3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00692593-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00692593-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/15/2025220743104Open ↗
04/15/2025220743104Open ↗
04/15/2025220743104Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership2
▸BISDEPT OF FINANCE VERIFICATION2
03/31/2025220743104Open ↗
03/31/2025220743104Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/23/2024240329667Open ↗
▸BISEFILING COVER SHEET1
03/31/2025220743104Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/23/2022240329667Open ↗
▸Other Documents27
▸DOB NOWSite Survey: Initial7
08/16/2026X00692593-B1Open ↗
08/13/2026X00692593-A3Open ↗
08/13/2026X00692593-A7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/16/2026X00692593-B1Open ↗
08/13/2026X00692593-I1Open ↗
08/13/2026X00692593-A7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/16/2026X00692593-B1Open ↗
08/16/2026X00692593-A9Open ↗
08/16/2026X00692593-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00692593-S1Open ↗
08/13/2026X00692593-S2Open ↗
▸BISSupporting Document: Fee Exempt1
01/31/2025240329667Open ↗
▸BISPLOT DIAGRAM1
04/15/2025220743104Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/05/2024240329667Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00692593-I1Open ↗