← Back
BuildNYC
Miscellaneous religious facility
733 LINCOLN PLACE
BROOKLYN · BIN 3032263
💬 Discuss this project
1931Year Built
2Stories
M9Building Class
R6BZoning
10,776 sfGross Floor Area
1Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Miscellaneous religious facility · Owner of record: Evangelical Lutheran Church of the Epiph Any of Bro · 32,360 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBanya205p · 5 filings · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 6Needle beam installation13p · 1 filing · 7 docs
Floor 5Banya202p · 5 filings · 20 docs
Floor 4Banya205p · 5 filings · 20 docs
Floor 3Banya200p · 5 filings · 20 docs
Floor 2Banya201p · 5 filings · 20 docs
Floor 1Banya209p · 6 filings · 20 docs
CellarBanya190p · 4 filings · 20 docs
Site & exteriorJcs Realty177p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lexington Design NY6309/20/2026
JCS Realty409/13/2026
40 Bruckner Realty403/22/2026
Church of the Epiphany203/21/2026
Epiphany Lutheran School103/21/2026
Evangelical Lutheran Church103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group1403/21/2026
Advanced Builders Services603/21/2026
Expediting 4 U203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold1307/08/2026
On Star ManagementGeneral Contractor1004/09/2026
S&R Electrical & MechanicalElectrical403/22/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
On Star ManagementScaffold207/08/2026
JSB WorksScaffold104/09/2026
Best Mechanical ServicesPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161206/29/2026
Regional Testing394205/13/2022
Building Lifecycle
All (206)Filed (30)Permit Issued (14)Signed Off (11)Violation (37)Inspection (1)Objection (80)Special Inspection (30)Tax Incentive (3)
09/18/2026
Signed off — Alteration
B00714553-I1
08/01/2026
421-a(16) construction completed
06/29/2026
Filed — New Building
PROPOSED FIVE (5) STORY MIXED USE BUILDING.
B00655818-A1
06/25/2026
Signed off — New Building
PROPOSED FIVE (5) STORY MIXED USE BUILDING.
B00655818-S2
06/25/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Luminous Exit Path Markings
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
06/16/2026
Signed off — Alteration
CURB CUT FILED IN CONJUNCTION WITH NB B00655818-I1.
B00725450-I1
06/12/2026
Signed off — Alteration
Sprinkler & Standpipe System filed in conjunction with NB application B00655818-I1.
B00714569-I1
06/10/2026
Signed off — Alteration
Installation of Construction fence filed in conjunction with New Building Job #B00655818.
B00712149-I1
06/10/2026
Signed off — Alteration
B01062465-I1
06/04/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01186870-S1
06/04/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01186870-I1
06/04/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01186870-S2
05/05/2026
Violation issued (HPD, closed)
A
05/04/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/27/2026
Signed off — New Building
PROPOSED FIVE (5) STORY MIXED USE BUILDING.
B00655818-S3
04/23/2026
Signed off — New Building
PROPOSED FIVE (5) STORY MIXED USE BUILDING.
B00655818-S1
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/09/2026
Objection raised — Admin
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Admin
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Fire_Protection
04/02/2026
Permit issued — Curb Cut
B00725450-I1-CC
03/30/2026
Filed — Alteration
Sprinkler & Standpipe System filed in conjunction with NB application B00655818-I1.
B00714569-P1
02/20/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Other
02/09/2026
Violation issued (ECB, closed)
Construction
02/09/2026
Violation issued (ECB, closed)
Unknown
02/04/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01186870-P4
02/02/2026
Permit issued — Sidewalk Shed
B01186870-I1-SH
02/02/2026
Permit issued — Supported Scaffold
B01186870-I1-SF
02/02/2026
Permit issued — Protection and Mechanical Methods
B01186870-S1-PMM
01/19/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01186870-P3
01/12/2026
Violation issued (ECB, closed)
Unknown
01/12/2026
Objection resolved — Addressed
01/07/2026
Violation issued (ECB, closed)
Unknown
Latest 60 of 206 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offOn Star Management04/02/2026
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding02/02/2026
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding02/02/2026
DOB NOWProtection and Mechanical MethodsSigned-offConsolidated Scaffolding02/02/2026
DOB NOWConstruction FenceSigned-offOn Star Management12/12/2025
DOB NOWMechanical SystemsSigned-offOn Star Management11/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offConsolidated Scaffolding06/12/2025
DOB NOWSprinklersSigned-offRightway Plumbing and Heating05/29/2025
DOB NOWStandpipeSigned-offRightway Plumbing and Heating05/28/2025
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding02/27/2025
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding02/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offConsolidated Scaffolding02/27/2025
DOB NOWConstruction FenceSigned-offOn Star Management01/31/2025
DOB NOWConstruction FenceSigned-offJSB Works05/19/2022
BIS—ISSUEDHexagon Industries08/08/2025
BISEQISSUEDHexagon Industries07/31/2025
BISFSISSUEDStatewide Oil and Heating01/29/1998
1 project · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026Signed-offRightway Plumbing and Heating1,998 heads, 14 outlets
2 projects · most recent 03/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/30/2026———
01/05/2026Permit IssuedBest Mechanical ServicesGas, Storm, Water/Sanitary
5 projects · most recent 12/04/2025
General Wiring
FiledStatusContractorScope
12/04/2025CompleteS&R Electrical & Mechanical101 meters, 101 new_meters
11/26/2025CompletePower Direct Electric—
11/05/2025CompleteS&R Electrical & MechanicalGeneral Wiring
08/19/2025CompleteS&R Electrical & Mechanical1 meters, 1 new_meters
03/08/2025CompleteSolas Electrical—
2 projects · most recent 02/04/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
02/04/2026Signed-offConsolidated ScaffoldingScaffold, Sidewalk Shed
09/30/2025Signed-offOn Star ManagementFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/04/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
06/25/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/25/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/25/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/25/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
06/25/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/25/2026Luminous Exit Path MarkingsSHAHRIAR QUAYYUMspecial
06/25/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
06/25/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
06/25/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
06/25/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/25/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
06/25/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
06/25/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
06/25/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
06/25/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
06/25/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/25/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
06/25/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
06/25/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
01/02/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
01/02/2026FinalFAHAD FATEHprogress
12/31/2025Maintenance informationFAHAD FATEHenergy_progress
12/31/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/31/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/31/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 103.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BanyaFitness / RecreationCellar, Floors 1–5, Roof
Project B00702940 Alteration · Permit Entire · 12/19/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 192 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
08/29/2026B00655818-S4Request digital key ↗
08/29/2026B00655818-S3Request digital key ↗
08/29/2026B00655818-A1Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
07/24/2024322106092Open ↗
02/07/2024340908566Open ↗
09/20/2022322106092Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
01/29/2026322106092Open ↗
08/11/2025322106092Open ↗
08/04/2025322106092Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/07/2024340908566Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram4
08/29/2026B00655818-A1Open ↗
08/13/2026B00655818-P8Open ↗
08/13/2026B00655818-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/29/2026B00655818-A1Open ↗
08/13/2026B00655818-P7Open ↗
08/13/2026B00655818-I1Open ↗
Showing 3 of 4 on file for this type
▸BISZONING APPEAL2
04/03/2019321076170Open ↗
04/03/2019321076170Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00655818-I1Open ↗
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/29/2026B00655818-S4Open ↗
08/29/2026B00655818-S3Open ↗
08/29/2026B00655818-S1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/29/2026B00655818-S4Open ↗
09/29/2026B00655818-S4Open ↗
09/29/2026B00655818-S4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026B00655818-S4Open ↗
09/29/2026B00655818-S4Open ↗
09/18/2026B00655818-S3Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/07/2024340908566Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/07/2024340908566Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00655818-P8Open ↗
08/13/2026B00655818-P7Open ↗
08/13/2026B00655818-I1Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
08/11/2025322106092Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/29/2026B00655818-A1Open ↗
08/29/2026B00655818-P7Open ↗
08/15/2026B00655818-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/14/2024340908566Open ↗
▸BISSTREET TREE CHECKLIST1
02/07/2024340908566Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
08/11/2025322106092Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/11/2025322106092Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00655818-I1Open ↗
▸Environmental & Asbestos3
▸BISRODENT CONTROL2
02/26/2026322106092Open ↗
08/11/2025322106092Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/11/2025322106092Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/26/2026B00714553-I1Open ↗
08/19/2026B00702940-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00655818-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026B00655818-P5Open ↗
08/13/2026B00655818-S1Open ↗
08/13/2026B00655818-P3Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/15/2026B00655818-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00655818-S1Open ↗
▸DOB NOWTR5 Test Report1
08/15/2026B00655818-S2Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/26/2026322106092Open ↗
02/26/2026322106092Open ↗
01/29/2026322106092Open ↗
Showing 3 of 8 on file for this type
▸Cost, Insurance & Ownership2
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/11/2025322106092Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/11/2025322106092Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
09/20/2022322106092Open ↗
04/11/2022322106092Open ↗
11/07/2018321076170Open ↗
▸BISBOROUGH INTAKE FORM2
08/04/2025322106092Open ↗
07/24/2024322106092Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/07/2024340908566Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/07/2024340908566Open ↗
▸BISADDITIONAL INFORMATION1
03/25/2024340908566Open ↗
▸Other Documents20
▸DOB NOWProperty Ownership Certification5
08/29/2026B00655818-A1Open ↗
08/29/2026B00655818-P7Open ↗
08/15/2026B00655818-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/29/2026B00655818-A1Open ↗
08/13/2026B00655818-P8Open ↗
08/13/2026B00655818-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/29/2026B00655818-A1Open ↗
08/13/2026B00655818-P8Open ↗
08/13/2026B00655818-I1Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00655818-S4Open ↗
08/13/2026B00655818-S1Open ↗
08/13/2026B00655818-S2Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/07/2018321076170Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/25/2024340908566Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/25/2024340908566Open ↗
▸DOB NOWFinal Survey1
08/15/2026B00655818-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00655818-I1Open ↗