← Back
Five to six families
735 41 STREET
BROOKLYN · BIN 3018095
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6BZoning
5,280 sfGross Floor Area
6Units
Rent Stabilized114 Open Violations 113 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: 735 LUCKY HOUSE LLC · 2,504 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 3 filings · 20 docs
Floor 1
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDEN KEY MANAGEMENT1907/08/2026
735 LUCKY HOUSE LLC903/22/2026
GOLDEN KEY REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT304/10/2024
J&R DESIGN AND INSPECTION CORP.307/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 3381203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637204/10/2024
NKM ENGINEERING PLLC6244403/01/2024
Building Lifecycle
All (74)Filed (6)Permit Issued (4)Signed Off (4)Violation (60)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, open)
A
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, closed)
C
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, open)
C
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, open)
C
11/12/2025
Violation issued (HPD, open)
A
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, open)
A
11/12/2025
Violation issued (HPD, open)
A
11/12/2025
Violation issued (HPD, open)
B
11/12/2025
Violation issued (HPD, open)
B
10/24/2025
Signed off — Alteration
B00904764-I1
10/24/2025
Signed off — Alteration
INTERIOR RENOVATION ON CELLAR AND 2ND FLOOR OF AN EXIST'G RESIDENTIAL BUILDING. CAP/REMOVE OIL TANK AND BOILER, INSTALL NEW COMBI. BOILER WITH TANKLESS COIL, FLOOR DRAIN, BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00844421-I1
09/23/2025
Signed off — Alteration
INTERIOR RENOVATION ON CELLAR AND 2ND FLOOR OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00844463-S2
09/22/2025
Signed off — Alteration
INTERIOR RENOVATION ON CELLAR AND 2ND FLOOR OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00844463-I1
05/06/2025
Violation issued (ECB, open)
Construction
03/21/2025
Permit issued — Boiler Equipment
B00844463-S2-BE
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
C
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
B
06/16/2024
Violation issued (HPD, open)
B
06/14/2024
Violation issued (ECB, closed)
Construction
06/14/2024
Violation issued (ECB, closed)
Construction
06/04/2024
Violation issued (HPD, open)
B
06/04/2024
Violation issued (HPD, open)
B
06/04/2024
Violation issued (HPD, open)
A
06/04/2024
Violation issued (HPD, open)
B
06/04/2024
Violation issued (HPD, closed)
A
06/04/2024
Violation issued (HPD, open)
B
06/04/2024
Violation issued (HPD, open)
B
06/04/2024
Violation issued (HPD, open)
B
04/10/2024
Filed — Alteration
INTERIOR RENOVATION ON CELLAR AND 2ND FLOOR OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00844463-P1
04/08/2024
Violation issued (HPD, closed)
A
03/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/07/2024
Violation issued (HPD, open)
C
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
B
03/07/2024
Violation issued (HPD, open)
A
03/07/2024
Violation issued (HPD, closed)
A
03/07/2024
Violation issued (HPD, closed)
C
03/07/2024
Violation issued (HPD, open)
B
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.03/21/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION07/18/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.04/17/2023
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.04/17/2023
BISOTISSUEDA-1 WATERMAIN & SEWER CORP02/01/2006
BISPLISSUEDA-1 WATERMAIN & SEWER CORP.02/01/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/04/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/15/2024Fail-Final Boiler Equipment InspectionFailView ↗
02/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/11/2024HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
04/11/2024HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
04/11/2024Maintenance informationNARESH MAHANGUenergy_progress
04/11/2024HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
04/11/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
04/11/2024Heating SystemsNARESH MAHANGUspecial
03/01/2024Heating SystemsNARESH MAHANGUspecial
03/01/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
03/01/2024Maintenance informationNARESH MAHANGUenergy_progress
03/01/2024HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
03/01/2024HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
03/01/2024HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
02/15/2024Tenant Protection Plan Compliance—special
02/15/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
02/15/2024Maintenance informationRobert Truskoskyenergy_progress
02/15/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
02/15/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
02/15/2024Heating SystemsRobert Truskoskyspecial
07/27/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/27/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
07/27/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/27/2023HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
07/27/2023HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
07/27/2023HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00844463-P1Request digital key ↗
08/27/2026B00844463-I1Request digital key ↗
08/27/2026B00844421-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00844463-I1Open ↗
08/27/2026B00844421-I1Open ↗
08/27/2026B00844421-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B00844463-S2Open ↗
09/23/2026B00844463-I1Open ↗
09/23/2026B00844463-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B00844463-I1Open ↗
09/23/2026B00844463-S2Open ↗
09/02/2026B00844463-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00844463-I1Open ↗
08/27/2026B00844421-P1Open ↗
08/27/2026B00844421-I1Open ↗
Showing 3 of 6 on file for this type