← Back
Two family frame
735 HYLAN BOULEVARD
STATEN ISLAND · Grasmere-Arrochar-South Beach-Dongan Hills · BIN 5044943
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3-1Zoning
2,480 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 7,319 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/30/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
12/23/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01301389-I1
11/07/2025
Permit issued — Solar
S01301389-I1-SL
10/30/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01301389-I1
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/10/2025
Special inspection requirement — Final
Walid Abdulla
10/10/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/22/2003
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/07/2025
1 project · most recent 10/30/2025
FiledStatusContractorScope
10/30/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/30/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/10/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/10/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/10/2025FinalWalid Abdullaprogress
10/10/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S01301389-I1Open ↗
08/31/2026S01301389-I1Open ↗
08/31/2026S01301389-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S01301389-I1Open ↗
08/31/2026S01301389-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01301389-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01301389-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01301389-I1Open ↗