← Back
BuildNYC
Two family frame
735 MAGUIRE AVENUE
STATEN ISLAND · BIN 5175416
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
2,450 sfGross Floor Area
2Units
Two family frame · Owner of record: Bombay Radigan · 4,171 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Proposed Two - Family Residence3p · 2 filings · 20 docs
Floor 1Proposed Two - Family Residence36p · 2 filings · 20 docs
BasementProposed Two - Family Residence3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mason Maguire703/22/2026
Casa Mason Estates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect409/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Blue Star Holdings803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blue Star GroupGeneral Contractor307/08/2026
Capital Contracting P&HPlumbing107/08/2026
R&M Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738209/10/2025
Building Lifecycle
11/16/2025
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S00702795-I1-GC-CX
10/09/2025
Signed off — New Building
PROPOSED 10' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE
S00702795-S1
09/22/2025
Signed off — New Building
PROPOSED 10' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE
S00702795-S2
09/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
52 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBlue Star Group09/09/2025
DOB NOWPlumbingSigned-offR&M Piping & Heating06/02/2025
DOB NOWPlumbingSigned-offCapital Contracting P&H02/14/2025
DOB NOWFoundationPermit IssuedBlue Star Group02/10/2025
1 project · most recent 09/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/10/2025Signed-offCapital Contracting P&HGas, Storm, Water/Sanitary
1 project · most recent 03/05/2025
General Wiring
FiledStatusContractorScope
03/05/2025CompleteTrue ElectricGeneral Wiring
1 project · most recent 09/10/2025
Concrete Wood
FiledStatusContractorScope
09/10/2025Signed-offBlue Star GroupConcrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/16/2025Concrete - Cast-In-Placeanthony santorospecial
09/16/2025Wood – Prefabricated I-Joistsanthony santorospecial
09/16/2025Mechanical Systemsanthony santorospecial
09/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/16/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/16/2025Subgrade Inspectionsanthony santorospecial
09/16/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
09/16/2025Fire-Resistance Rated Constructionanthony santoroprogress
09/16/2025Footing and Foundationanthony santoroprogress
09/16/2025Energy Code Compliance Inspectionsanthony santoroprogress
09/16/2025Structural Wood Frameanthony santoroprogress
09/16/2025Finalanthony santoroprogress
09/16/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/16/2025Air barrier continuity plan testinganthony santoroenergy_progress
09/16/2025Permanent certificateanthony santoroenergy_progress
09/16/2025Air barrier — testing anthony santoroenergy_progress
09/16/2025Duct leakage testing, insulation and designanthony santoroenergy_progress
09/16/2025Ventilation and air distribution systemanthony santoroenergy_progress
09/16/2025Fenestration areasanthony santoroenergy_progress
09/16/2025Interior lighting poweranthony santoroenergy_progress
09/16/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/16/2025Lighting in dwelling unitsanthony santoroenergy_progress
09/16/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/16/2025Maintenance informationanthony santoroenergy_progress
09/16/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
Latest 25 of 30.
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account