← Back
Two family converted from one family
736 GEORGIA AVENUE
BROOKLYN · BIN 3097225
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R6Zoning
1,560 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 2,000 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP110/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINCHESE CONSTRUCTION INGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573110/14/2025
Building Lifecycle
All (35)Filed (1)Permit Issued (1)Signed Off (1)Violation (7)Objection (14)Special Inspection (11)
08/14/2026
Signed off — Alteration
RESTORE EX. 2-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION & MINOR STRUCTURAL WORK FOR PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B01279813-I1
11/25/2025
Permit issued — Structural
B01279813-I1-GC-CX
11/20/2025
Objection resolved — Addressed
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
11/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
11/19/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/22/2025
Objection raised — Scope
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Cost
10/22/2025
Objection raised — Scope
10/22/2025
Objection raised — Scope
10/22/2025
Objection raised — Scope
10/22/2025
Objection raised — Scope
10/14/2025
Filed — Alteration
RESTORE EX. 2-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION & MINOR STRUCTURAL WORK FOR PARTITIONS & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B01279813-I1
10/13/2025
Special inspection requirement — Interior lighting power
Nat Costanza
10/13/2025
Special inspection requirement — Structural Steel - Details
Nat Costanza
10/13/2025
Special inspection requirement — Air barrier - visual inspection
Nat Costanza
10/13/2025
Special inspection requirement — Insulation placement and R values
Nat Costanza
10/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
10/13/2025
Special inspection requirement — Fenestration areas
Nat Costanza
10/13/2025
Special inspection requirement — Fenestration air leakage
Nat Costanza
08/29/2025
Special inspection requirement — Final
Nat Costanza
08/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Costanza
04/15/2021
Violation issued (HPD, closed)
I
04/11/2021
Violation issued (HPD, closed)
C
04/11/2021
Violation issued (HPD, closed)
C
04/11/2021
Violation issued (HPD, closed)
B
04/11/2021
Violation issued (HPD, closed)
B
04/11/2021
Violation issued (HPD, closed)
C
04/11/2021
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTRINCHESE CONSTRUCTION IN11/25/2025
1 project · most recent 10/14/2025
Steel
FiledStatusContractorScope
10/14/2025Signed-offTRINCHESE CONSTRUCTION INSteel
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/20/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
11/20/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
10/13/2025Interior lighting powerNat Costanzaenergy_progress
10/13/2025Structural Steel - DetailsNat Costanzaspecial
10/13/2025Air barrier - visual inspectionNat Costanzaenergy_progress
10/13/2025Insulation placement and R valuesNat Costanzaenergy_progress
10/13/2025Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
10/13/2025Fenestration areasNat Costanzaenergy_progress
10/13/2025Fenestration air leakageNat Costanzaenergy_progress
08/29/2025FinalNat Costanzaprogress
08/29/2025Structural Stability – Alterations of existing buildingsNat Costanzaspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01279813-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01279813-I1Open ↗
09/01/2026B01279813-I1Open ↗
09/01/2026B01279813-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01279813-I1Open ↗
09/01/2026B01279813-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026B01279813-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026B01279813-I1Open ↗