← Back
Two family brick
737 CRAWFORD AVENUE
BROOKLYN · Gravesend (East)-Homecrest · BIN 3194936
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R4Zoning
1,710 sfGross Floor Area
2Units
Two family brick · 1,933 sf lot · 0.88 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Cellar5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. MASUCCI ARCHITECTS, LLC610/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
KJK ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371410/21/2025
NIC DESIGN INC9758203/18/2025
Building Lifecycle
All (32)Filed (6)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (16)
12/09/2025
Signed off — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-S1
12/09/2025
Signed off — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-I1
10/21/2025
Filed — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-P5
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/15/2025
Special inspection requirement — Mechanical Systems
Eric Sun
10/15/2025
Special inspection requirement — Final
Eric Sun
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
10/15/2025
Special inspection requirement — Ventilation and air distribution system
Eric Sun
10/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
10/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
10/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
10/15/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
10/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
10/15/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
10/15/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
10/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
10/15/2025
Special inspection requirement — Interior lighting power
Eric Sun
10/15/2025
Special inspection requirement — Fenestration areas
Eric Sun
10/08/2025
Filed — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-P4
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2025
Filed — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-P3
09/25/2025
Filed — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-P2
07/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/09/2025
Permit issued — Plumbing
B01192472-S1-PL
03/24/2025
Permit issued — Plumbing
B01192472-S1-PL
03/20/2025
Permit issued — General Construction
B01192472-I1-GC-CX
03/18/2025
Filed — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-S1
03/13/2025
Filed — Alteration
INSTALL BOILERS, H.W.H., AND BATHROOM AND KITCHEN PLUMBING FIXTURES. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01192472-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/09/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/24/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY03/20/2025
1 project · most recent 10/03/2025
General Wiring
FiledStatusContractorScope
10/03/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/15/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/15/2025Mechanical SystemsEric Sunspecial
10/15/2025FinalEric Sunprogress
10/15/2025Energy Code Compliance InspectionsEric Sunprogress
10/15/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/15/2025Ventilation and air distribution systemEric Sunenergy_progress
10/15/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
10/15/2025Duct leakage testing, insulation and designEric Sunenergy_progress
10/15/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
10/15/2025Air barrier - visual inspectionEric Sunenergy_progress
10/15/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
10/15/2025Insulation placement and R valuesEric Sunenergy_progress
10/15/2025Fenestration air leakageEric Sunenergy_progress
10/15/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
10/15/2025Interior lighting powerEric Sunenergy_progress
10/15/2025Fenestration areasEric Sunenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01192472-P5Request digital key ↗
08/22/2026B01192472-P4Request digital key ↗
08/22/2026B01192472-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B01192472-P3Open ↗
08/13/2026B01192472-P4Open ↗
08/13/2026B01192472-S1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026B01192472-P4Open ↗
08/22/2026B01192472-P3Open ↗
08/22/2026B01192472-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01192472-I1Open ↗
08/25/2026B01192472-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01192472-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026B01192472-P4Open ↗
08/22/2026B01192472-P3Open ↗
08/22/2026B01192472-P5Open ↗
Showing 3 of 5 on file for this type