← Back
BuildNYC
Over six families without stores
737 EAST 187TH STREET
BRONX · Belmont · BIN 2012898
💬 Discuss this project
1912Year Built
5Stories
C1Building Class
R7-1Zoning
23,050 sfGross Floor Area
31Units
Rent Stabilized8 Active Violations 4 unresolved · 4 paperwork only 1 likely answered ▸
Over six families without stores · Owner of record: 1415 Wythe Housing Developement Fund Corp Poration · 5,000 sf lot · 4.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofUnit Matrix and Tenant Survey Package34p · 6 filings · 20 docs
Floor 5Building Renovations13p · 5 filings · 20 docs
Floor 4Building Renovations54p · 4 filings · 20 docs
Floor 3Building Renovations54p · 4 filings · 20 docs
Floor 2Building Renovations57p · 4 filings · 20 docs
Floor 1Building Renovations57p · 4 filings · 20 docs
CellarBuilding Renovations68p · 5 filings · 20 docs
Site & exterior21p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1415 Wythe Housing Development Fund5607/08/2026
Neighborhood Renewal HDFC1307/08/2026
Tzur 187 St503/21/2026
N Atzur 187 Street203/21/2026
1415 Wythe HDFC203/21/2026
Four Suns Fuel Oil103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates3103/21/2026
A1 Expediting Service1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Notias ConstructionGeneral Contractor2107/08/2026
Akm Construction NYScaffold607/08/2026
American Standard P&H CororpPlumbing407/08/2026
Notias ConstructionScaffold407/08/2026
Queue Electrical ContractorsElectrical303/21/2026
J-J PlumbingPlumbing207/08/2026
Shally Electrical CoElectrical203/21/2026
Alson Electrical ContractingElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Queue Electrical ContractorsElectrical103/22/2026
G. Poulakis Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co53442507/09/2025
Building Lifecycle
All (177)Filed (38)Permit Issued (28)Signed Off (10)Violation (60)Inspection (3)Objection (8)Special Inspection (30)
08/18/2026
Violation issued (HPD, open)
A
05/18/2026
Signed off — Alteration
Plumbing work as shown on plans filed herewith.
X00526086-I1
04/14/2026
Violation issued (HPD, open)
B
04/14/2026
Violation issued (HPD, open)
B
04/14/2026
Violation issued (HPD, closed)
A
04/14/2026
Violation issued (HPD, closed)
B
04/14/2026
Violation issued (HPD, open)
A
02/19/2026
Violation issued (HPD, closed)
B
01/14/2026
Filed — Alteration
Plumbing work as shown on plans filed herewith.
X00526086-P9
12/10/2025
Signed off — Alteration
INSTALL DEBRIS CHUTE FRONTING EAST 187th STREET AS PER PLANS FILED.
X00906276-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Signed off — Alteration
Removal of steam heating system and components.
X00526067-I1
10/10/2025
Signed off — Alteration
Removal of existing steam heating boiler and components and replacement with new hydronic heating boilers and associated heating system components.
X00674222-I1
10/03/2025
Signed off — Alteration
renovation to include demo of existing and construction of roof work as shown on plans. No change in use, egress or occupancy under this application.
X00644381-I1
10/03/2025
Signed off — Alteration
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this application.
X00526315-I1
08/06/2025
Signed off — Alteration
Structural roof work as shown on plans filed herewith.
X00644403-I1
08/06/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
X00526674-I1
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
07/18/2025
Special inspection requirement — Mechanical Systems
MINA HANNA
07/18/2025
Special inspection requirement — Insulation placement and R values
MINA HANNA
07/18/2025
Special inspection requirement — Lighting controls
MINA HANNA
07/18/2025
Special inspection requirement — Exterior lighting power
MINA HANNA
07/18/2025
Special inspection requirement — Interior lighting power
MINA HANNA
07/18/2025
Special inspection requirement — Final
Mark Ginsberg
07/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
07/18/2025
Special inspection requirement — Final
MINA HANNA
07/18/2025
Special inspection requirement — Lighting in dwelling units
MINA HANNA
07/18/2025
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
07/09/2025
Filed — Alteration
Removal of steam heating system and components.
X00526067-P5
07/09/2025
Filed — Alteration
Plumbing work as shown on plans filed herewith.
X00526086-P7
07/08/2025
Filed — Alteration
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this application.
X00526315-P6
07/08/2025
Filed — Alteration
renovation to include demo of existing and construction of roof work as shown on plans. No change in use, egress or occupancy under this application.
X00644381-P2
05/19/2025
Special inspection requirement — Mechanical Systems
MINA HANNA
05/19/2025
Special inspection requirement — Final
MINA HANNA
05/19/2025
Special inspection requirement — Insulation placement and R values
MINA HANNA
05/19/2025
Special inspection requirement — Interior lighting power
MINA HANNA
05/19/2025
Special inspection requirement — Exterior lighting power
MINA HANNA
05/19/2025
Special inspection requirement — Final
Mark Ginsberg
05/19/2025
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
05/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
05/19/2025
Special inspection requirement — Lighting in dwelling units
MINA HANNA
05/19/2025
Special inspection requirement — Lighting controls
MINA HANNA
04/17/2025
Permit issued — Structural
X00526674-I1-ST
04/16/2025
Permit issued — General Construction
X00526315-I1-GC
04/16/2025
Permit issued — Structural
X00644403-I1-ST
04/16/2025
Permit issued — General Construction
X00644381-I1-GC
04/16/2025
Permit issued — Protection and Mechanical Methods
X00906276-I1-PMM
04/02/2025
Permit issued — Mechanical Systems
X00526067-I1-MS
01/09/2025
Permit issued — Plumbing
X00526086-I1-PL
12/11/2024
Filed — Alteration
Plumbing work as shown on plans filed herewith.
X00526086-P5
11/20/2024
Signed off — Alteration
TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTY DURING BUILDING ALT, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00935815-I1
11/20/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00955126-I1
10/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
10/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
10/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
10/08/2024
Special inspection requirement — Heating Systems
MINA HANNA
10/04/2024
Filed — Alteration
Removal of existing steam heating boiler and components and replacement with new hydronic heating boilers and associated heating system components.
X00674222-P2
10/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
10/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNotias Construction04/17/2025
DOB NOWGeneral ConstructionSigned-offNotias Construction04/16/2025
DOB NOWStructuralSigned-offNotias Construction04/16/2025
DOB NOWGeneral ConstructionSigned-offNotias Construction04/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offNotias Construction04/16/2025
DOB NOWMechanical SystemsSigned-offNotias Construction04/02/2025
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp01/09/2025
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp05/01/2024
DOB NOWMechanical SystemsSigned-offNotias Construction01/08/2024
DOB NOWStructuralSigned-offNotias Construction01/08/2024
DOB NOWStructuralSigned-offNotias Construction01/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offNotias Construction01/08/2024
DOB NOWGeneral ConstructionSigned-offNotias Construction01/08/2024
DOB NOWGeneral ConstructionSigned-offNotias Construction01/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offAkm Construction NY12/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offNotias Construction11/16/2023
DOB NOWStructuralSigned-offNotias Construction11/15/2023
DOB NOWSupported ScaffoldSigned-offAkm Construction NY11/02/2023
DOB NOWGeneral ConstructionSigned-offNotias Construction10/16/2023
DOB NOWMechanical SystemsSigned-offNotias Construction10/16/2023
DOB NOWStructuralSigned-offNotias Construction10/16/2023
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp09/25/2023
DOB NOWGeneral ConstructionSigned-offNotias Construction09/14/2023
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY08/22/2023
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing05/22/2023
DOB NOWStructuralSigned-offNotias Construction09/29/2022
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY08/24/2022
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing06/21/2022
BISOTISSUEDBlue Square Construction02/11/2019
BISEQISSUEDBlue Square Construction04/07/2017
BISFBISSUEDCourt Oil Heating08/22/1994
1 project · most recent 01/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/14/2026Signed-offAmerican Standard P&HGas, Water/Sanitary
5 projects · most recent 02/05/2025
General Wiring Boiler Controls
FiledStatusContractorScope
02/05/2025Permit IssuedQueue Electrical ContractorsGeneral Wiring
12/05/2024CompleteQueue Electrical ContractorsGeneral Wiring
10/08/2024Permit IssuedG. Poulakis Electrical ContractingBoiler Controls
12/12/2023CompleteQueue Electrical Contractors—
08/01/2022CompleteHigh Quality Electric of—
1 project · most recent 05/30/2024
Sidewalk Shed
FiledStatusContractorScope
05/30/2024Permit IssuedAkm Construction NYSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
07/18/2025Lighting in dwelling unitsMINA HANNAenergy_progress
07/18/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
07/18/2025FinalMark Ginsbergprogress
07/18/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
07/18/2025FinalMINA HANNAprogress
07/18/2025Mechanical SystemsMINA HANNAspecial
07/18/2025Lighting controlsMINA HANNAenergy_progress
07/18/2025Insulation placement and R valuesMINA HANNAenergy_progress
07/18/2025Interior lighting powerMINA HANNAenergy_progress
07/18/2025Air barrier - visual inspectionMINA HANNAenergy_progress
07/18/2025Exterior lighting powerMINA HANNAenergy_progress
05/19/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
05/19/2025FinalMark Ginsbergprogress
05/19/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
05/19/2025Interior lighting powerMINA HANNAenergy_progress
05/19/2025Exterior lighting powerMINA HANNAenergy_progress
05/19/2025Mechanical SystemsMINA HANNAspecial
05/19/2025FinalMINA HANNAprogress
05/19/2025Lighting controlsMINA HANNAenergy_progress
05/19/2025Lighting in dwelling unitsMINA HANNAenergy_progress
05/19/2025Air barrier - visual inspectionMINA HANNAenergy_progress
05/19/2025Insulation placement and R valuesMINA HANNAenergy_progress
10/08/2024Heating SystemsMINA HANNAspecial
10/08/2024HVAC-R and service water heating system controlsMINA HANNAenergy_progress
10/08/2024HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
Latest 25 of 82.
▾Documents — 277 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
08/24/2026X00526674-P1Request digital key ↗
08/24/2026X00526674-I1Request digital key ↗
08/24/2026X00526674-P2Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
02/05/2019220687898Open ↗
03/28/2017220589904Open ↗
▸BISWORK PERMIT APPLICATION2
02/12/2019220687898Open ↗
04/12/2017220589904Open ↗
▸Seals & Professional Certifications123
▸DOB NOWProgress Inspector Seal & Signature50
09/29/2026X00526067-P2Open ↗
09/23/2026X00674222-I1Open ↗
09/23/2026X00674222-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/24/2026X00526674-P2Open ↗
08/24/2026X00526674-P1Open ↗
08/24/2026X00526674-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/29/2026X00526067-P2Open ↗
09/23/2026X00674222-I1Open ↗
09/01/2026X00674222-P1Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/06/2019220687898Open ↗
02/05/2019220687898Open ↗
02/05/2019220687898Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/05/2019220687898Open ↗
03/28/2017220589904Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/05/2019220687898Open ↗
03/28/2017220589904Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
02/06/2019220687898Open ↗
03/28/2017220589904Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
08/24/2026X00526674-P2Open ↗
08/24/2026X00526674-P1Open ↗
08/24/2026X00526674-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026X00644403-I1Open ↗
08/19/2026X00644381-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/05/2019220687898Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis3
08/15/2026X00526315-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
08/15/2026X00526315-I1Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/06/2019220687898Open ↗
02/05/2019220687898Open ↗
▸Approvals, Objections & Sign-offs37
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter35
08/22/2026X00526315-P6Open ↗
08/22/2026X00526315-P4Open ↗
08/22/2026X00526315-P3Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/19/2026X00644381-I1Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/05/2019220687898Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
02/05/2019220687898Open ↗
03/28/2017220589904Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00784286-P1Open ↗
▸Other Documents32
▸DOB NOWDHCR Document32
08/22/2026X00526315-P4Open ↗
08/22/2026X00526315-P6Open ↗
08/22/2026X00526315-P6Open ↗
Showing 3 of 32 on file for this type