← Back
Elevator apt, fireproof with stores
738 5 AVENUE
BROOKLYN · BIN 3428999
💬 Discuss this project
2023Year Built
6Stories
D6Building Class
R6AZoning
10,468 sfGross Floor Area
8Units
7 Open Violations 4 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 735 5TH AVE CONSTRUCTION LLC · 2,517 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction62p · 2 filings · 20 docs
Floor 6Under Construction58p · 3 filings · 20 docs
Floor 5Under Construction55p · 2 filings · 20 docs
Floor 4Under Construction56p · 2 filings · 20 docs
Floor 3Under Construction57p · 4 filings · 20 docs
Floor 2Under Construction56p · 2 filings · 20 docs
Floor 1Under Construction57p · 2 filings · 20 docs
CellarUnder Construction57p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1007/08/2026
REGAL CONSTRUCTION GROUP INC.1407/08/2026
PGB GROUP803/22/2026
OWNER OF 738 5 AVE303/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
TRIERA CONTRACTING303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1508/24/2026
PAUL PERDEK, PROF. ENG. PLLC405/16/2024
JIAN ENGINEERING PLLC102/13/2020
GREEN DESIGN102/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY1003/21/2026
RYAN DESIGN ARCHITECTURE103/21/2026
AE DESIGN SOLUTION803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PGB GROUP CORPGeneral Contractor2507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing507/08/2026
K M D MECHANICAL 1443Plumbing303/22/2026
K M D MECHANICAL 1443General Contractor303/22/2026
MSB PLUMBING CONTRACTORSPlumbing207/08/2026
K.M.D MECHANICAL 1443 LLCFire Protection107/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191408/24/2026
IP CONCRETE TESTING AND I6252302/08/2023
Building Lifecycle
All (114)Filed (21)Permit Issued (28)Signed Off (8)Violation (18)Inspection (9)Special Inspection (30)
08/24/2026
Filed — Alteration
FILING FOR EXCAVATION, SHORING, FOOTING, FOUNDATION, UNDERPINNING & STRUCTURAL WORK ON CELLAR, 1ST TO 6TH FLOOR, ROOF, OSP. IN CONJUNCTION WITH NB APPLICATION #322068187.
B00460962-P5
08/24/2026
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
08/24/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
08/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
08/24/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
08/24/2026
Special inspection requirement — Masonry
Younes Abouyaala
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/24/2026
Special inspection requirement — Underpinning
Younes Abouyaala
08/24/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/24/2026
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
08/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/13/2026
Signed off — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-S1
08/03/2026
Signed off — Alteration
SUBMIT MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322068187.
B00342048-I1
08/03/2026
Signed off — Alteration
B00377356-I1
08/02/2026
Signed off — Alteration
B00315886-I1
05/29/2026
Filed — Alteration
SUBMIT MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322068187.
B00342048-P1
05/28/2026
Special inspection requirement — Duct leakage testing
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
05/28/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/28/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
05/28/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
05/28/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/20/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/20/2026
Special inspection requirement — Heating Systems
Younes Abouyaala
05/12/2026
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-P4
05/12/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/12/2026
Special inspection requirement — Heating Systems
Younes Abouyaala
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
04/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/27/2026
Permit issued — Plumbing
B00342120-I1-PL
03/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2026
Permit issued — Boiler Equipment
B00342120-S1-BE
01/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/20/2026
Permit issued — Sprinklers
B00377356-I1-EW-SP
12/17/2025
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-P3
12/09/2025
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-S1
09/02/2025
Permit issued — Mechanical Systems
B00342048-I1-MS
06/25/2025
Permit issued — Foundation
B00460962-I1-GC-CX
03/05/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2025
Permit issued — Plumbing
B00342120-I1-PL
02/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00874426-I1
02/03/2025
Signed off — Alteration
B00874421-I1
02/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01047297-I1
12/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2024
Violation issued (ECB, closed)
Construction
10/25/2024
Permit issued — Construction Fence
B00315886-I1-FN
10/22/2024
Violation issued (ECB, open)
Construction
09/18/2024
Permit issued — General Construction
B00460962-I1-GC-CX
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedK.M.D MECHANICAL 1443 LLC03/27/2026
DOB NOWBoiler EquipmentSigned-offK.M.D MECHANICAL 1443 LLC03/17/2026
DOB NOWSprinklersSigned-offK.M.D MECHANICAL 1443 LLC01/20/2026
DOB NOWMechanical SystemsSigned-offPGB GROUP CORP09/02/2025
DOB NOWFoundationPermit IssuedPGB GROUP CORP06/25/2025
DOB NOWPlumbingPermit IssuedK.M.D MECHANICAL 1443 LLC02/21/2025
DOB NOWConstruction FenceSigned-offPGB GROUP CORP10/25/2024
DOB NOWGeneral ConstructionPermit IssuedPGB GROUP CORP09/18/2024
DOB NOWConstruction FenceSigned-offPGB GROUP CORP08/23/2024
DOB NOWConstruction FenceSigned-offPGB GROUP CORP08/12/2024
DOB NOWEarth WorkPermit IssuedPGB GROUP CORP06/12/2024
DOB NOWConstruction FenceSigned-offPGB GROUP CORP06/12/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/17/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/10/2024
DOB NOWPlumbingPermit IssuedMSB PLUMBING CONTRACTORS03/07/2024
DOB NOWConstruction FenceSigned-offPGB GROUP CORP01/04/2024
DOB NOWStructuralPermit IssuedPGB GROUP CORP01/04/2024
DOB NOWConstruction FenceSigned-offPGB GROUP CORP10/03/2023
DOB NOWGeneral ConstructionPermit IssuedPGB GROUP CORP10/03/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/16/2023
DOB NOWPlumbingPermit IssuedMSB PLUMBING CONTRACTORS03/02/2023
DOB NOWConstruction FenceSigned-offPGB GROUP CORP12/28/2022
DOB NOWEarth WorkPermit IssuedPGB GROUP CORP12/28/2022
DOB NOWFoundationPermit IssuedPGB GROUP CORP07/13/2022
DOB NOWConstruction FenceSigned-offPGB GROUP CORP02/01/2022
DOB NOWConstruction FenceSigned-offPGB GROUP CORP09/30/2021
BIS—ISSUEDPGB GROUP CORP06/25/2025
BIS—ISSUEDPGB GROUP CORP10/28/2024
BIS—ISSUEDPGB GROUP CORP06/26/2024
BIS—ISSUEDPGB GROUP CORP12/21/2023
BIS—ISSUEDPGB GROUP CORP06/19/2023
BIS—ISSUEDPGB GROUP CORP10/14/2022
BIS—ISSUEDPGB GROUP CORP07/01/2022
BIS—ISSUEDPGB GROUP CORP02/01/2022
BIS—ISSUEDPGB GROUP CORP10/04/2021
1 project · most recent 05/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2026Signed-offPGB GROUP CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 3MXS24WMVJU9 24,000 BTU · Condensing Unit ×20
3MXS24RMVJUA 24,000 BTU · Condensing Unit ×10
2MXM18AVJU9 18,900 BTU · Condensing Unit ×5
RXC24AXVJU 23,000 BTU · Condensing Unit ×5
Gree 4LIV30HP230V1AO 30,000 BTU · Condensing Unit ×5
MUL24HP230V1R32AO 24,000 BTU · Condensing Unit ×5
Ventilation
Greenheck SFB-9 400 CFM · Exhaust Fan ×35
1 project · most recent 05/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedK.M.D MECHANICAL 1443 LLCGas, Storm, Water/Sanitary
4 projects · most recent 11/07/2025
General Wiring
FiledStatusContractorScope
11/07/2025CompleteJOHN MICHAEL ELEC'L CONTGGeneral Wiring
10/17/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
05/19/2023CompleteSOLAS ELECTRICAL CORP—
02/04/2020CompleteRICHARD NEU—
1 project · most recent 08/24/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/24/2026Permit IssuedPGB GROUP CORPSteel, Concrete, Masonry
1 project · most recent 08/24/2026
Earthwork
FiledStatusContractorScope
08/24/2026Permit IssuedPGB GROUP CORPEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Fail-Final Boiler Equipment InspectionFailView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/07/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
08/24/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/24/2026Structural Steel - High Strength BoltingYounes Abouyaalaspecial
08/24/2026Footing and FoundationYounes Abouyaalaprogress
08/24/2026FinalNAVEEN KUMARprogress
08/24/2026UnderpinningYounes Abouyaalaspecial
08/24/2026Subgrade InspectionsYounes Abouyaalaspecial
08/24/2026Structural Steel - WeldingYounes Abouyaalaspecial
08/24/2026Structural Steel - DetailsYounes Abouyaalaspecial
08/24/2026MasonryYounes Abouyaalaspecial
08/24/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/24/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
05/28/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/28/2026Duct leakage testing Younes Abouyaalaenergy_progress
05/28/2026HVAC and service water heating equipment Younes Abouyaalaenergy_progress
05/28/2026Maintenance informationYounes Abouyaalaenergy_progress
05/28/2026Shutoff dampersYounes Abouyaalaenergy_progress
05/28/2026HVAC insulation and sealing Younes Abouyaalaenergy_progress
05/28/2026HVAC and service water heating system controls Younes Abouyaalaenergy_progress
05/28/2026Mechanical SystemsYounes Abouyaalaspecial
05/28/2026FinalNAVEEN KUMARprogress
05/20/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/20/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/20/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/20/2026Maintenance informationYounes Abouyaalaenergy_progress
05/20/2026Heating SystemsYounes Abouyaalaspecial
Latest 25 of 100.
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch - Structural6
08/27/2026B00460962-P1Request digital key ↗
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Earthwork6
08/27/2026B00460962-P3Request digital key ↗
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch6
08/27/2026B00874426-I1Request digital key ↗
08/27/2026B00874426-P1Request digital key ↗
08/27/2026B00874421-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction6
08/27/2026B00460962-P1Request digital key ↗
08/27/2026B00460962-P3Request digital key ↗
08/27/2026B00460962-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Foundation6
08/27/2026B00460962-P3Request digital key ↗
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026B00342120-I1Request digital key ↗
08/17/2026B00342120-P3Request digital key ↗
08/17/2026B00342120-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/16/2026B00342048-P1Request digital key ↗
08/16/2026B00342048-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00315886-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00377356-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00308982-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
09/02/2025322068187Open ↗
10/17/2024322068187Open ↗
01/19/2023322068187Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION5
07/13/2022322068187Open ↗
07/01/2022322068187Open ↗
10/05/2021322068187Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/19/2025322068187Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/29/2021340808068Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM3
01/13/2021322068187Open ↗
12/24/2020322068187Open ↗
10/07/2020322068187Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/24/2020322068187Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/24/2020322068187Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/24/2020322068187Open ↗
▸Seals & Professional Certifications101
▸DOB NOWSpecial Inspector Seal & Signature52
09/25/2026B00342048-P1Open ↗
09/23/2026B00460962-P5Open ↗
09/23/2026B00460962-P5Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/25/2026B00342048-P1Open ↗
09/25/2026B00342048-P1Open ↗
09/25/2026B00342048-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/27/2026B00460962-P5Open ↗
08/27/2026B00460962-I1Open ↗
08/27/2026B00874426-P1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/20/2021322068187Open ↗
02/21/2020322068187Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/29/2021340808068Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2021340808068Open ↗
▸Trade Schedules & Equipment1
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
06/24/2020322068187Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
03/29/2021340808068Open ↗
12/24/2020322068187Open ↗
02/21/2020322068187Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/29/2021340808068Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/22/2021322068187Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/22/2021322068187Open ↗
12/24/2020322068187Open ↗
10/07/2020322068187Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/20/2021322068187Open ↗
02/21/2020322068187Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/16/2026B00342048-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/22/2021322068187Open ↗
01/13/2021322068187Open ↗
01/13/2021322068187Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
05/20/2021322068187Open ↗
04/22/2021322068187Open ↗
▸BISSOIL REPORT1
01/13/2021322068187Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/20/2021322068187Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/13/2021322068187Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/20/2021322068187Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/22/2021322068187Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/04/2020322068187Open ↗
04/03/2020322068187Open ↗
04/03/2020322068187Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
10/07/2020322068187Open ↗
07/27/2020322068187Open ↗
06/09/2020322068187Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
10/05/2021322068187Open ↗
10/05/2021322068187Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/01/2022322068187Open ↗
06/07/2021322068187Open ↗
05/20/2021322068187Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/05/2021322068187Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/05/2021322068187Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
01/15/2026322068187Open ↗
11/19/2025322068187Open ↗
10/18/2024322068187Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
10/05/2021322068187Open ↗
06/07/2021322068187Open ↗
05/20/2021322068187Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2021340808068Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/29/2021340808068Open ↗
▸BISEFILING COVER SHEET1
02/21/2020322068187Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/27/2026B00460962-P5Open ↗
08/13/2026B00460962-P2Open ↗
08/13/2026B00460962-P3Open ↗
Showing 3 of 6 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
12/24/2020322068187Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00460962-I1Open ↗