← Back
BuildNYC
Elevator apt, fireproof with stores
738 5TH AVENUE
BROOKLYN · BIN 3428999
💬 Discuss this project
2023Year Built
6Stories
D6Building Class
R6AZoning
10,468 sfGross Floor Area
8Units
5 Active Violations 2 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 735 5th Ave Construction · 2,517 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofH&Z Bulding Corporation86p · 6 filings · 20 docs
Floor 7Temporary pipe scaffold installation7p · 1 filing · 2 docs
Floor 6H&Z Bulding Corporation82p · 5 filings · 20 docs
Floor 5H&Z Bulding Corporation79p · 5 filings · 20 docs
Floor 4H&Z Bulding Corporation80p · 5 filings · 20 docs
Floor 3H&Z Bulding Corporation81p · 5 filings · 20 docs
Floor 2H&Z Bulding Corporation81p · 5 filings · 20 docs
Floor 1H&Z Bulding Corporation76p · 5 filings · 20 docs
CellarH&Z Bulding Corporation72p · 4 filings · 20 docs
Site & exteriorH&Z Bulding Corporation81p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 738 5 Ave303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL Engineering1508/24/2026
Paul Perdek, Prof. Engineering405/16/2024
Jian Engineering102/13/2020
Green Design102/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z Building NY1003/21/2026
Ryan Design Architecture103/21/2026
AE Design Solution803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PGB GroupGeneral Contractor1404/09/2026
PGB GroupScaffold1107/08/2026
Core Scaffold SystemsScaffold1107/08/2026
K.M.D. Mechanical 1443Plumbing507/08/2026
KMD MechanicalGeneral Contractor303/22/2026
KMD MechanicalPlumbing303/22/2026
MSB Plumbing ContractorsPlumbing207/08/2026
K.M.D. Mechanical 1443Fire Protection107/08/2026
Solas ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection15191408/24/2026
IP Concrete Testing and I6252302/08/2023
Building Lifecycle
All (111)Filed (21)Permit Issued (28)Signed Off (8)Violation (18)Inspection (6)Special Inspection (30)
08/24/2026
Filed — Alteration
FILING FOR EXCAVATION, SHORING, FOOTING, FOUNDATION, UNDERPINNING & STRUCTURAL WORK ON CELLAR, 1ST TO 6TH FLOOR, ROOF, OSP. IN CONJUNCTION WITH NB APPLICATION #322068187.
B00460962-P5
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
08/24/2026
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
08/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
08/24/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/24/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/24/2026
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/24/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
08/24/2026
Special inspection requirement — Underpinning
Younes Abouyaala
08/24/2026
Special inspection requirement — Masonry
Younes Abouyaala
08/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/13/2026
Signed off — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-S1
08/03/2026
Signed off — Alteration
SUBMIT MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322068187.
B00342048-I1
08/03/2026
Signed off — Alteration
B00377356-I1
08/02/2026
Signed off — Alteration
B00315886-I1
06/04/2026
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
06/04/2026
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
06/04/2026
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
06/04/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
06/04/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/04/2026
Special inspection requirement — Duct leakage testing
Younes Abouyaala
06/04/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/04/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/29/2026
Filed — Alteration
SUBMIT MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322068187.
B00342048-P1
05/28/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC insulation and sealing
Younes Abouyaala
05/28/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
05/28/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/28/2026
Special inspection requirement — Duct leakage testing
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
05/28/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
05/20/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/12/2026
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-P4
04/08/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
03/27/2026
Permit issued — Plumbing
B00342120-I1-PL
03/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2026
Permit issued — Boiler Equipment
B00342120-S1-BE
01/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/20/2026
Permit issued — Sprinklers
B00377356-I1-EW-SP
12/17/2025
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-P3
12/09/2025
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, 1ST THRU 006 FLOOR, ROF & OSP. IN CONJUNCTION NB APPLICATION #322068187.
B00342120-S1
09/02/2025
Permit issued — Mechanical Systems
B00342048-I1-MS
06/25/2025
Permit issued — Foundation
B00460962-I1-GC-CX
03/05/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2025
Permit issued — Plumbing
B00342120-I1-PL
02/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01047297-I1
02/03/2025
Signed off — Alteration
B00874421-I1
02/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00874426-I1
12/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2024
Violation issued (ECB, closed)
Construction
10/25/2024
Permit issued — Construction Fence
B00315886-I1-FN
10/22/2024
Violation issued (ECB, open)
Construction
09/18/2024
Permit issued — General Construction
B00460962-I1-GC-CX
08/23/2024
Permit issued — Construction Fence
B00315886-I1-FN
08/12/2024
Permit issued — Construction Fence
B00315886-I1-FN
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedK.M.D. Mechanical 144303/27/2026
DOB NOWBoiler EquipmentSigned-offK.M.D. Mechanical 144303/17/2026
DOB NOWSprinklersSigned-offK.M.D. Mechanical 144301/20/2026
DOB NOWMechanical SystemsSigned-offPGB Group09/02/2025
DOB NOWFoundationPermit IssuedPGB Group06/25/2025
DOB NOWPlumbingPermit IssuedK.M.D. Mechanical 144302/21/2025
DOB NOWConstruction FenceSigned-offPGB Group10/25/2024
DOB NOWGeneral ConstructionPermit IssuedPGB Group09/18/2024
DOB NOWConstruction FenceSigned-offPGB Group08/23/2024
DOB NOWConstruction FenceSigned-offPGB Group08/12/2024
DOB NOWEarth WorkPermit IssuedPGB Group06/12/2024
DOB NOWConstruction FenceSigned-offPGB Group06/12/2024
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems05/17/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/10/2024
DOB NOWPlumbingPermit IssuedMSB Plumbing Contractors03/07/2024
DOB NOWStructuralPermit IssuedPGB Group01/04/2024
DOB NOWConstruction FenceSigned-offPGB Group01/04/2024
DOB NOWConstruction FenceSigned-offPGB Group10/03/2023
DOB NOWGeneral ConstructionPermit IssuedPGB Group10/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/16/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/16/2023
DOB NOWPlumbingPermit IssuedMSB Plumbing Contractors03/02/2023
DOB NOWConstruction FenceSigned-offPGB Group12/28/2022
DOB NOWEarth WorkPermit IssuedPGB Group12/28/2022
DOB NOWFoundationPermit IssuedPGB Group07/13/2022
DOB NOWConstruction FenceSigned-offPGB Group02/01/2022
DOB NOWConstruction FenceSigned-offPGB Group09/30/2021
BIS—ISSUEDPGB Group06/25/2025
BIS—ISSUEDPGB Group10/28/2024
BIS—ISSUEDPGB Group06/26/2024
BIS—ISSUEDPGB Group12/21/2023
BIS—ISSUEDPGB Group06/19/2023
BIS—ISSUEDPGB Group10/14/2022
BIS—ISSUEDPGB Group07/01/2022
BIS—ISSUEDPGB Group02/01/2022
BIS—ISSUEDPGB Group10/04/2021
1 project · most recent 05/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2026Signed-offPGB GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 3MXS24WMVJU9 24,000 BTU · Condensing Unit ×20
3MXS24RMVJUA 24,000 BTU · Condensing Unit ×10
2MXM18AVJU9 18,900 BTU · Condensing Unit ×5
RXC24AXVJU 23,000 BTU · Condensing Unit ×5
Gree 4LIV30HP230V1AO 30,000 BTU · Condensing Unit ×5
MUL24HP230V1R32AO 24,000 BTU · Condensing Unit ×5
Ventilation
Greenheck SFB-9 400 CFM · Exhaust Fan ×35
1 project · most recent 05/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedK.M.D. Mechanical 1443Gas, Storm, Water/Sanitary
4 projects · most recent 11/07/2025
General Wiring
FiledStatusContractorScope
11/07/2025CompleteJohn Michael Electrical ContgGeneral Wiring
10/17/2024Permit IssuedStar Electrical Contractors—
05/19/2023CompleteSolas Electrical—
02/04/2020CompleteRichard Neu—
1 project · most recent 08/24/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/24/2026Permit IssuedPGB GroupSteel, Concrete, Masonry
1 project · most recent 08/24/2026
Earthwork
FiledStatusContractorScope
08/24/2026Permit IssuedPGB GroupEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/08/2026Fail-Final Boiler Equipment InspectionFailView ↗
03/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 109
DateRequirementInspectorRole
08/24/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/24/2026Footing and FoundationYounes Abouyaalaprogress
08/24/2026Structural Steel - High Strength BoltingYounes Abouyaalaspecial
08/24/2026FinalNAVEEN KUMARprogress
08/24/2026UnderpinningYounes Abouyaalaspecial
08/24/2026Subgrade InspectionsYounes Abouyaalaspecial
08/24/2026Structural Steel - WeldingYounes Abouyaalaspecial
08/24/2026Structural Steel - DetailsYounes Abouyaalaspecial
08/24/2026MasonryYounes Abouyaalaspecial
08/24/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/24/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
06/04/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/04/2026Maintenance informationYounes Abouyaalaenergy_progress
06/04/2026HVAC and service water heating equipment Younes Abouyaalaenergy_progress
06/04/2026HVAC and service water heating system controls Younes Abouyaalaenergy_progress
06/04/2026Shutoff dampersYounes Abouyaalaenergy_progress
06/04/2026HVAC insulation and sealing Younes Abouyaalaenergy_progress
06/04/2026Duct leakage testing Younes Abouyaalaenergy_progress
06/04/2026Mechanical SystemsYounes Abouyaalaspecial
06/04/2026FinalNAVEEN KUMARprogress
05/28/2026Mechanical SystemsYounes Abouyaalaspecial
05/28/2026HVAC and service water heating system controls Younes Abouyaalaenergy_progress
05/28/2026Shutoff dampersYounes Abouyaalaenergy_progress
05/28/2026HVAC insulation and sealing Younes Abouyaalaenergy_progress
05/28/2026Maintenance informationYounes Abouyaalaenergy_progress
Latest 25 of 109.
▾Documents — 224 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch - Structural6
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P5Request digital key ↗
08/27/2026B00460962-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Earthwork6
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P3Request digital key ↗
08/27/2026B00460962-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch6
08/27/2026B00874426-P1Request digital key ↗
08/27/2026B00874426-I1Request digital key ↗
08/27/2026B00874421-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction6
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P3Request digital key ↗
08/27/2026B00460962-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Foundation6
08/27/2026B00460962-P3Request digital key ↗
08/27/2026B00460962-I1Request digital key ↗
08/27/2026B00460962-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026B00342120-P1Request digital key ↗
08/17/2026B00342120-P3Request digital key ↗
08/17/2026B00342120-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/16/2026B00342048-P1Request digital key ↗
08/16/2026B00342048-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00315886-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00377356-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00308982-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
09/02/2025322068187Open ↗
10/17/2024322068187Open ↗
01/19/2023322068187Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION5
07/13/2022322068187Open ↗
07/01/2022322068187Open ↗
10/05/2021322068187Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/19/2025322068187Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/29/2021340808068Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM3
01/13/2021322068187Open ↗
12/24/2020322068187Open ↗
10/07/2020322068187Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/24/2020322068187Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/24/2020322068187Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/24/2020322068187Open ↗
▸Seals & Professional Certifications105
▸DOB NOWSpecial Inspector Seal & Signature53
10/17/2026B00342048-I1Open ↗
09/25/2026B00342048-P1Open ↗
09/23/2026B00460962-P5Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/17/2026B00342048-I1Open ↗
10/17/2026B00342048-I1Open ↗
10/17/2026B00342048-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/27/2026B00460962-P5Open ↗
08/27/2026B00460962-I1Open ↗
08/27/2026B00874426-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/20/2021322068187Open ↗
02/21/2020322068187Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/29/2021340808068Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2021340808068Open ↗
▸Trade Schedules & Equipment1
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
06/24/2020322068187Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
03/29/2021340808068Open ↗
12/24/2020322068187Open ↗
02/21/2020322068187Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/29/2021340808068Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/22/2021322068187Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/22/2021322068187Open ↗
12/24/2020322068187Open ↗
10/07/2020322068187Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/20/2021322068187Open ↗
02/21/2020322068187Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/16/2026B00342048-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/22/2021322068187Open ↗
01/13/2021322068187Open ↗
01/13/2021322068187Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
05/20/2021322068187Open ↗
04/22/2021322068187Open ↗
▸BISSOIL REPORT1
01/13/2021322068187Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/20/2021322068187Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/13/2021322068187Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/20/2021322068187Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/22/2021322068187Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/04/2020322068187Open ↗
04/03/2020322068187Open ↗
04/03/2020322068187Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
10/07/2020322068187Open ↗
07/27/2020322068187Open ↗
06/09/2020322068187Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
10/05/2021322068187Open ↗
10/05/2021322068187Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/01/2022322068187Open ↗
06/07/2021322068187Open ↗
05/20/2021322068187Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/05/2021322068187Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/05/2021322068187Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
01/15/2026322068187Open ↗
11/19/2025322068187Open ↗
10/18/2024322068187Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
10/05/2021322068187Open ↗
06/07/2021322068187Open ↗
05/20/2021322068187Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2021340808068Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/29/2021340808068Open ↗
▸BISEFILING COVER SHEET1
02/21/2020322068187Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/27/2026B00460962-P5Open ↗
08/13/2026B00460962-P1Open ↗
08/13/2026B00460962-P4Open ↗
Showing 3 of 6 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
12/24/2020322068187Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00460962-I1Open ↗