DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
ECB05/17/2018FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35271784J ISSUED ON 09/11/17,AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTIBLE CERTIFICNothing owed — awaiting certificate of correction
ECB09/11/2017WORK W/O A PERMIT. ILLEGAL AWNING & SIGN INSTALLED W/O A PERMIT(20'X20'LONG 4FT HIGH OZONE PHARMACY. REMEDY: OBTAIN PERMITS.Nothing owed — awaiting certificate of correction
ECB10/02/2015FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.INSTALLATION MAINTENANCE OF PLUMBING MATERIALS OR EQUIPMENT PER PC 102.3 27-902.OBSERVED ON 10-02-15 AT 3:15PM IN COMMERCIAL STORE 2" PVC PIPING & ILLEGAL FNothing owed — awaiting certificate of correction