1935Year Built
6Stories
D1Building Class
R7-1Zoning
97,170 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized41 Open Violations ▸
Elevator apt, semi-fireproof without stores · 23,000 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneralOther
Roof3p · 2 filings · 6 docs
Floor 63p · 1 filing · 18 docs
Floor 53p · 1 filing · 18 docs
Floor 43p · 1 filing · 18 docs
Floor 33p · 1 filing · 18 docs
Floor 29p · 1 filing · 18 docs
Floor 13p · 1 filing · 18 docs
Cellar3p · 1 filing · 18 docs
8 jobs · most recent 03/18/2025
General Wiring
FiledStatusContractorScope
03/18/2025CompleteINGERSOLL ELECTRICAL SOLUGeneral Wiring
03/04/2025CancelledTRISTRUX LLCGeneral Wiring
09/08/2023CompleteRICHARD NEU—
02/18/2022CompleteBLZ ELECTRIC INC.General Wiring
12/14/2021CompleteRICHARD NEU—
11/01/2021CompleteR.J. ELEC AND MAINTENANCEGeneral Wiring
06/24/2020CompleteR.J. ELEC AND MAINTENANCEGeneral Wiring
05/24/2019CompleteSTAR ELEC'L CONTRACTORS C—
Building Lifecycle
All (118)Filed (10)Permit Issued (9)Signed Off (8)Violation (60)Inspection (11)Objection (20)
07/21/2026
Violation issued (HPD, closed)
C
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, closed)
C
07/21/2026
Violation issued (HPD, open)
A
07/21/2026
Violation issued (HPD, open)
B
05/10/2026
Violation issued (HPD, closed)
B
05/10/2026
Violation issued (HPD, closed)
C
05/10/2026
Violation issued (HPD, open)
B
05/10/2026
Violation issued (HPD, open)
A
05/10/2026
Violation issued (HPD, closed)
B
05/10/2026
Violation issued (HPD, closed)
B
05/10/2026
Violation issued (HPD, open)
C
05/10/2026
Violation issued (HPD, closed)
B
05/10/2026
Violation issued (HPD, closed)
B
04/27/2026
Violation issued (ECB, closed)
Elevators
02/28/2026
Violation issued (HPD, closed)
B
02/28/2026
Violation issued (HPD, open)
C
02/28/2026
Violation issued (HPD, closed)
B
02/28/2026
Violation issued (HPD, open)
C
02/10/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (HPD, open)
B
02/10/2026
Violation issued (HPD, open)
B
02/10/2026
Violation issued (HPD, open)
B
02/10/2026
Violation issued (HPD, open)
B
02/10/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (HPD, open)
B
01/29/2026
Violation issued (HPD, closed)
C
12/03/2025
Violation issued (HPD, closed)
C
12/03/2025
Violation issued (HPD, open)
B
11/19/2025
Violation issued (HPD, closed)
C
11/12/2025
Violation issued (HPD, closed)
B
11/12/2025
Violation issued (HPD, closed)
C
11/12/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, closed)
B
10/29/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, closed)
B
10/29/2025
Violation issued (HPD, closed)
C
10/17/2025
Violation issued (HPD, closed)
C
07/28/2025
Signed off — Alteration
Q01059923-I1
03/27/2025
Signed off — Alteration
Installation of new Dish antenna installing 3 new sectors with 6 RRH units and 1 new GPS unit on the roof. Installing 1 new equipment cabinets on steel platform on roof. Related conduit run from basement to roof. All in conformance with TPPN 5/98.
Q00702901-I1
03/12/2025
Violation issued (HPD, closed)
C
01/28/2025
Permit issued — Antenna
Q01059923-I1-AN
01/24/2025
Violation issued (HPD, open)
C
01/24/2025
Violation issued (HPD, closed)
C
01/24/2025
Violation issued (HPD, closed)
A
01/24/2025
Violation issued (HPD, open)
B
01/24/2025
Violation issued (HPD, open)
B
01/24/2025
Violation issued (HPD, open)
B
01/24/2025
Violation issued (HPD, open)
B
01/24/2025
Violation issued (HPD, open)
B
12/23/2024
Violation issued (HPD, closed)
C
12/23/2024
Violation issued (HPD, open)
C
12/23/2024
Violation issued (HPD, closed)
B
12/08/2024
Violation issued (HPD, open)
B
12/08/2024
Violation issued (HPD, open)
C
10/10/2024
Permit issued — Antenna
Q00702901-I1-AN
09/04/2024
Violation issued (HPD, closed)
B
09/04/2024
Violation issued (HPD, closed)
B
09/04/2024
Violation issued (HPD, closed)
B
Latest 60 of 118 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENEDICT REALTY GROUP1807/08/2026
APEX GROUP NY507/08/2026
RELIABLE ENTERPRISES503/22/2026
BENEDICT PROPERTIES SUIT203/22/2026
BENEDICT PROPERTIES LL203/22/2026
BENDIR PROPERTS103/22/2026
BENDIT PROPERTIES103/22/2026
OWNER OF BUILDING103/22/2026
BUCKINGHAM, HALL INC303/22/2026
BUCKINGHAM FALL INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY MANAGEMENT GROUP603/21/2026
JACK JAFFA ASSOCIATES403/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
APEX GROUP NY CORPGeneral Contractor207/08/2026
TRISTRUX LLCGeneral Contractor203/21/2026
ABSOLUTE PLBG HTG & MECHPlumbing207/08/2026
LOPEZ MATOS CONTRUCTION IGeneral Contractor107/08/2026
LXS AIR INCGeneral Contractor107/08/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRENCH & PARRELLO ASSOCIA1271107/10/2024
KMB DESIGN GROUP, LLC513101/26/2024
GEORGE J. XERAKIAS, PE1658103/08/2023
SIA INSPECTIONS LLC7306210/07/2021
GREENLINE DEVELOPERS, LLC3447102/09/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU01/28/2025
DOB NOWAntennaSigned-offTRISTRUX LLC10/10/2024
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP09/08/2023
DOB NOWGeneral ConstructionSigned-offAPEX GROUP NY CORP09/07/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/15/2021
DOB NOWPlumbingSigned-offABSOLUTE PLBG HTG & MECH10/14/2021
DOB NOWGeneral ConstructionPermit IssuedLOPEZ MATOS CONTRUCTION I10/06/2021
DOB NOWMechanical SystemsSigned-offLXS AIR INC07/15/2021
DOB NOWPlumbingSigned-offABSOLUTE PLBG HTG & MECH06/16/2021
BISOTISSUEDSQUAN CONSTRUCTION SERVIC09/11/2020
BISPLISSUEDP.S.I. MECHANICAL04/24/2019
BISMHISSUEDLOYAL STARS CONSTRUCTION04/23/2019
BISMHISSUEDLOYAL STARS CONSTRUCTION04/04/2019
BISOTISSUEDSQUAN CONSTRUCTION SERVIC04/02/2019
BISPLISSUEDP.S.I. MECHANICAL03/13/2019
BISOTISSUEDLOYAL STARS CONSTRUCTION02/06/2019
BISPLISSUEDACCURATE MECHANICAL INC08/08/2018
BISOTISSUEDSQUAN CONSTRUCTION SERVIC07/31/2018
BISMHISSUEDA.E. CONSTRUCTION, LLC07/30/2018
BISOTISSUEDA.E. CONSTRUCTION, LLC07/13/2018
BISOTISSUEDLOYAL STARS CONSTRUCTION10/11/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC12/21/2015
BISOTISSUEDBEST ENERGY POWER LLC03/10/2014
BISOTISSUEDWIRELESS UTILITIES LLC01/17/2008
BISEQISSUEDNAVTECH CONSTRUCTION CORP09/11/2003
BISOTISSUEDTRI-STATE TELECOMMUNICATIONS, IN05/28/2003
BISBLISSUEDNEAL M. RUDIOFF/POSTIVE PLBG.05/19/2000
BISPLISSUEDDUAL FUEL PLUMBING & HEATING05/16/2000
BISOTISSUEDABC TANK REPAIR LINING INC04/08/1996
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2021Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
07/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/06/2021Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/08/2021FinalSunil Saigalprogress
10/05/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/18/2021HVAC-R and service water piping design and insulationROMAN STRAZHKOenergy_progress
08/18/2021Energy Code Compliance InspectionsROMAN STRAZHKOprogress
03/15/2021Fire-Resistance Rated ConstructionJEFF AKERMANprogress
03/15/2021Lighting in dwelling unitsJEFF AKERMANenergy_progress
03/15/2021Interior lighting powerJEFF AKERMANenergy_progress
03/15/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
03/15/2021Post-installed AnchorsSOFIA KAPELYANspecial
03/15/2021Energy Code Compliance InspectionsJEFF AKERMANprogress
03/11/2021Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
08/27/2026Q00484658-S1Request digital key ↗
08/26/2026Q00643964-I1Request digital key ↗
08/25/2026Q00755842-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00463810-I1Request digital key ↗
08/15/2026Q00463810-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00463874-I1Request digital key ↗
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION15
04/26/2019440542511Open ↗
04/23/2019440542511Open ↗
04/23/2019440542511Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
11/30/2018440241953Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00484658-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00463874-I1Open ↗
08/27/2026Q00463810-I1Open ↗
08/27/2026Q00463810-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
08/02/2019440542511Open ↗
04/22/2019440532327Open ↗
03/04/2019440492753Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026Q00484658-I1Open ↗
09/23/2026Q00484658-I1Open ↗
09/23/2026Q00484658-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00484658-I1Open ↗
09/23/2026Q00484658-I1Open ↗
09/23/2026Q00484658-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/01/2015440241953Open ↗
03/07/2014440123572Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/15/2019440241953Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES5
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist1
08/15/2026Q00484658-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00463810-I1Open ↗
08/27/2026Q00484658-S1Open ↗
08/22/2026Q01059923-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/20/2007410038258Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/07/2014440123572Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00755842-I1Open ↗
▸DOB NOWACP5/20/21 or V51
08/15/2026Q00463874-I1Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
04/23/2019440542511Open ↗
04/12/2019440542511Open ↗
04/12/2019440542511Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/02/2019440542511Open ↗
04/22/2019440532327Open ↗
03/04/2019440492753Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/02/2019440542511Open ↗
04/22/2019440532327Open ↗
03/04/2019440492753Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00484658-I1Open ↗
08/13/2026Q00463874-I1Open ↗
08/13/2026Q00463810-I1Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/07/2014440123572Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/07/2014440123572Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/16/2015440123572Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
04/23/2019440542511Open ↗
04/23/2019440542511Open ↗
04/12/2019440542511Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
08/02/2019440542511Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
02/28/2022401724595Open ↗
09/03/2019440492753Open ↗
09/03/2019440542511Open ↗
Showing 3 of 8 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
04/16/2015440123572Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/20/2007410038258Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/16/2015440123572Open ↗
▸BISSUPERSEDING LETTER1
08/20/2018440241953Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
08/02/2019440542511Open ↗
04/22/2019440532327Open ↗
04/12/2019440542511Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms12
▸BISEFILING JOB APPLICATION COVER SHEET6
04/12/2019440542511Open ↗
01/29/2019440532327Open ↗
07/03/2018440492753Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
01/15/2019440241953Open ↗
11/30/2018440241953Open ↗
11/28/2018440241953Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
01/18/2018440439143Open ↗
▸Other Documents4
▸BISTax Abatement Miscellaneous2
09/13/2016440123572Open ↗
04/16/2015440123572Open ↗
▸BISDHCR DOCUMENT1
02/28/2022401724595Open ↗
▸DOB NOWPlot Diagram1