← Back
Two family brick
74-19 86 ROAD
QUEENS · BIN 4180848
💬 Discuss this project
1955Year Built
1Stories
B1Building Class
R3-2Zoning
1,655 sfGross Floor Area
2Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: NANI NY CORP · 1,972 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 11p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/27/2018$625K—NY DODGE NY INC → Private party$378/sf building
08/03/2017$300K—Private party → NY DODGE NYC INC$181/sf building
11/26/2014$25K—Private party → HEBRON INC.$15/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.407/17/2023
ARCALHEK109/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDING CONSULTANTSGeneral Contractor107/08/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519207/17/2023
Building Lifecycle
All (35)Filed (5)Permit Issued (2)Signed Off (2)Violation (12)Inspection (3)Objection (4)Special Inspection (7)
11/25/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
08/14/2023
Signed off — Alteration
Propose to add a three piece bathroom at the first floor and to replace Garage Door.
Q00774555-I1
08/14/2023
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/14/2023
Special inspection requirement — Final
NAVEEN KUMAR
07/17/2023
Filed — Alteration
Propose to add a three piece bathroom at the first floor and to replace Garage Door.
Q00774555-P1
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/13/2023
Special inspection requirement — Final
NAVEEN KUMAR
07/13/2023
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/05/2023
Signed off — Alteration
propose 3 pc bathroom in first floor
Q00783382-I1
06/29/2023
Filed — Alteration
propose 3 pc bathroom in first floor
Q00783382-P1
05/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2023
Permit issued — Plumbing
Q00783382-I1-PL
01/17/2023
Filed — Alteration
propose 3 pc bathroom in first floor
Q00783382-I1
11/18/2022
Violation issued (HPD, open)
I
11/09/2022
Permit issued — General Construction
Q00774555-I1-GC
07/25/2022
Filed — Alteration
Propose to add a three piece bathroom at the first floor and to replace Garage Door.
Q00774555-I1
03/17/2022
Violation issued (HPD, open)
I
09/09/2021
Objection raised — Energy
09/09/2021
Objection raised — Admin
09/09/2021
Objection raised — Zoning
09/09/2021
Objection raised — Zoning
09/03/2021
Filed — Alteration CO
Application file to convert existing garage to a bedroom, Remove garage door and propose new window.
Q00511537-I1
08/26/2021
Special inspection requirement — Insulation placement and R values
RAYMOND CALAMARI
04/21/2021
Violation issued (HPD, open)
I
11/07/2019
Violation issued (HPD, open)
I
10/30/2018
Violation issued (HPD, closed)
I
08/14/2013
Violation issued (HPD, closed)
C
07/09/2013
Violation issued (HPD, open)
B
07/09/2013
Violation issued (HPD, open)
B
07/09/2013
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP02/22/2023
DOB NOWGeneral ConstructionSigned-offCITY BUILDING CONSULTANTS11/09/2022
1 project · most recent 11/16/2020
General Wiring
FiledStatusContractorScope
11/16/2020Permit IssuedRM ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/14/2023Fenestration air leakageYounes Abouyaalaenergy_progress
08/14/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/14/2023FinalNAVEEN KUMARprogress
07/13/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/13/2023FinalNAVEEN KUMARprogress
07/13/2023Fenestration air leakageYounes Abouyaalaenergy_progress
08/26/2021Insulation placement and R valuesRAYMOND CALAMARIenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00783382-I1Request digital key ↗
08/24/2026Q00783382-P1Request digital key ↗
08/24/2026Q00774555-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00511537-I1Open ↗
08/24/2026Q00783382-I1Open ↗
08/24/2026Q00783382-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026Q00774555-P1Open ↗
08/23/2026Q00774555-P1Open ↗
08/23/2026Q00774555-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00774555-P1Open ↗
08/23/2026Q00774555-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00511537-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026Q00783382-I1Open ↗
08/24/2026Q00774555-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00511537-I1Open ↗
08/13/2026Q00774555-I1Open ↗