← Back
Five to six families
74-28 WOODSIDE AVENUE
QUEENS · Elmhurst · BIN 4037685
💬 Discuss this project
1926Year Built
3Stories
C2Building Class
R6BZoning
3,900 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Five to six families · Owner of record: EFTHALIA REALTY LLC. · 3,311 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Floor 14p · 2 filings · 6 docs
Site & exterior5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOULIS CONSTRUCTION1307/08/2026
EFTHALIA REALTY LLC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC306/22/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOULIS CONSTRUCTION CORPGeneral Contractor507/08/2026
MAGNA ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247106/22/2022
Building Lifecycle
All (16)Filed (3)Permit Issued (3)Signed Off (2)Violation (2)Special Inspection (6)
08/01/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00751791-I1
07/28/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00751790-I1
06/29/2022
Permit issued — General Construction
Q00755611-I1-GC
06/22/2022
Filed — Alteration
Q00755611-I1
06/10/2022
Special inspection requirement — Masonry
Sunil Saigal
06/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
06/10/2022
Special inspection requirement — Final
Sunil Saigal
06/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
06/06/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00751791-I1
06/06/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00751790-I1
06/06/2022
Permit issued — Supported Scaffold
Q00751791-I1-SF
06/06/2022
Permit issued — Sidewalk Shed
Q00751790-I1-SH
06/06/2022
Special inspection requirement — Final
Sunil Saigal
06/06/2022
Special inspection requirement — Final
Sunil Saigal
05/19/2017
Violation issued (ECB, closed)
Boilers
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBOULIS CONSTRUCTION CORP06/29/2022
DOB NOWSupported ScaffoldSigned-offBOULIS CONSTRUCTION CORP06/06/2022
DOB NOWSidewalk ShedSigned-offBOULIS CONSTRUCTION CORP06/06/2022
BISOTISSUEDN/A01/21/1998
2 projects · most recent 06/08/2022
FiledStatusContractorScope
06/08/2022CompleteMAGNA ELECTRIC CORP—
06/06/2022CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/10/2022MasonrySunil Saigalspecial
06/10/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
06/10/2022FinalSunil Saigalprogress
06/10/2022Energy Code Compliance InspectionsSunil Saigalprogress
06/06/2022FinalSunil Saigalprogress
06/06/2022FinalSunil Saigalprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00751790-I1Request digital key ↗
08/26/2026Q00751791-I1Request digital key ↗
08/26/2026Q00755611-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00751790-I1Open ↗
08/28/2026Q00751791-I1Open ↗
08/25/2026Q00755611-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00751790-I1Open ↗
08/13/2026Q00751791-I1Open ↗
08/13/2026Q00755611-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00755611-I1Open ↗
08/25/2026Q00755611-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00755611-I1Open ↗