← Back
Public elementary, junior or senior high
P.S./I.S. 208
74-30 COMMONWEALTH BLVD · BIN 4529898
💬 Discuss this project
2001Year Built
—Stories
W1Building Class
R3-2Zoning
123,832 sfGross Floor Area
1Units
LL97 Covered5 Open Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 230,330 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof7p · 1 filing · 16 docs
Floor 14p · 2 filings · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION1209/24/2026
DCAS209/16/2026
NYC SCHOOL CONSTRUCTION AUTHORITY1807/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
P.S.208 D.O.E.203/22/2026
DEPT OF EDUCATION P.S.208203/22/2026
DOE P.S.208203/22/2026
DOE PS 208 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CROP506/22/2026
PETER HALKIAS101/08/2026
NYC SCA101/08/2026
NYC SCHOOL CONSTRUCTION AUTHORITY101/08/2026
BLADYKAS ENGINEERING, P.C.905/27/2025
KERI ENGINEERING, P.C.502/25/2025
THE RBA GROUP102/21/2025
INFOTRAN ENGINEERS AND ARCHITECTS102/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY N603/21/2026
JMV ASSOCIATES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NAMRON, INCGeneral Contractor507/08/2026
BAGIANA CONSTRUCTION INCGeneral Contractor209/24/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor209/16/2026
DEREK MOHANElectrical103/21/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
DO RITE MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001601/08/2026
NV5 NY - ENGINEERING, ARC9319102/21/2025
Building Lifecycle
All (125)Filed (24)Permit Issued (9)Signed Off (2)Violation (60)Special Inspection (30)
09/23/2026
Permit issued — Sidewalk Shed
Q01413276-I1-SH
09/16/2026
Permit issued — Construction Fence
Q01413279-I1-FN
09/15/2026
Permit issued — Foundation
Q01417838-S1-GC-CX
09/10/2026
Permit issued — Solar
Q01417838-I1-SL
06/22/2026
Filed — Alteration
Filing for temporary construction fence. No change in use, egress or occupancy. Q01285295, Q01175509
Q01413279-I1
06/22/2026
Filed — Alteration
Filing for supported scaffolding. No change in use, egress or occupancy. Q01285295
Q01413278-I1
06/22/2026
Filed — Alteration
Filing for temporary support of excavation. No change in use, egress or occupancy. Q01175509
Q01413280-I1
06/22/2026
Filed — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy. Q01285295
Q01413276-I1
06/22/2026
Filed — Alteration
Filing for temporary debris chute. No change in use, egress or occupancy.. Q01285295
Q01413282-I1
06/07/2026
Special inspection requirement — Post-installed Anchors
03/05/2026
Violation issued (ECB, closed)
Construction
03/05/2026
Violation issued (ECB, closed)
Construction
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
02/09/2026
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
01/08/2026
Filed — Alteration
Q208 : Remove & Replace Roofing, As-Built Roofing & Bulk Head Roofing including Parapet Walls; Reflashing on the Roofs, Insulation for the Designated Outside Perimeter, Replace, Repair, Point, Repoint, Caulk Cement, Bricks, Stone Works; miscellaneous work
Q01285295-S1
01/08/2026
Filed — Alteration
Q208 : Remove & Replace Roofing, As-Built Roofing & Bulk Head Roofing including Parapet Walls; Reflashing on the Roofs, Insulation for the Designated Outside Perimeter, Replace, Repair, Point, Repoint, Caulk Cement, Bricks, Stone Works; miscellaneous work
Q01285295-I1
01/08/2026
Filed — Alteration
Q208 : Remove & Replace Roofing, As-Built Roofing & Bulk Head Roofing including Parapet Walls; Reflashing on the Roofs, Insulation for the Designated Outside Perimeter, Replace, Repair, Point, Repoint, Caulk Cement, Bricks, Stone Works; miscellaneous work
Q01285295-S2
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
01/07/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
01/07/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
01/07/2026
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
01/07/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
09/10/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
09/10/2025
Special inspection requirement — Final
NELSON LOPEZ
08/21/2025
Signed off — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-I1
08/21/2025
Signed off — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-S1
07/28/2025
Violation issued (FDNY_ORDER, closed)
07/28/2025
Violation issued (FDNY_ORDER, closed)
07/14/2025
Permit issued — Mechanical Systems
Q00586268-I1-MS
05/29/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
05/29/2025
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
05/29/2025
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
05/29/2025
Special inspection requirement — Final
NELSON LOPEZ
05/27/2025
Filed — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-P7
05/21/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
05/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
05/21/2025
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
05/21/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
05/21/2025
Special inspection requirement — Final
NELSON LOPEZ
05/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
05/21/2025
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
04/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
03/04/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Violation issued (ECB, closed)
Construction
02/27/2025
Filed — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-P6
02/25/2025
Filed — Alteration
Excavation and trenching for re-construction of drain structures, pipe lines and storm system. New on site drainage system and SMP adhering to USWR with three retention systems. No change to use, egress and occupancy under this application
Q01175509-S1
02/21/2025
Filed — Alteration
Excavation and trenching for re-construction of drain structures, pipe lines and storm system. New on site drainage system and SMP adhering to USWR with three retention systems. No change to use, egress and occupancy under this application
Q01175509-S2
02/18/2025
Filed — Alteration
Excavation and trenching for re-construction of drain structures, pipe lines and storm system. New on site drainage system and SMP adhering to USWR with three retention systems. No change to use, egress and occupancy under this application
Q01175509-I1
02/18/2025
Special inspection requirement — Masonry
NELSON LOPEZ
11/14/2024
Filed — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-P5
08/15/2024
Permit issued — Mechanical Systems
Q00586268-I1-MS
08/12/2024
Filed — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-P4
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBAGIANA CONSTRUCTION INC09/23/2026
DOB NOWConstruction FencePermit IssuedBAGIANA CONSTRUCTION INC09/16/2026
DOB NOWFoundationPermit IssuedBROOKLYN SOLARWORKS LLC09/15/2026
DOB NOWSolarPermit IssuedBROOKLYN SOLARWORKS LLC09/10/2026
DOB NOWMechanical SystemsSigned-offNAMRON, INC07/14/2025
DOB NOWMechanical SystemsSigned-offNAMRON, INC08/15/2024
DOB NOWPlumbingSigned-offDO RITE MECHANICAL CORP05/04/2023
DOB NOWBoiler EquipmentSigned-offDOUGLAS SIMMONS01/31/2023
DOB NOWMechanical SystemsSigned-offNAMRON, INC09/12/2022
BISOTISSUEDWILLIAM A. GROSS CONSTRUCTION02/02/2015
BISOTISSUEDLEVINSON & SANTORO ELEC08/25/2010
BISMHISSUEDLEVINSON & SANTORO ELEC08/03/2009
BISPLISSUEDEAGLE 1 MECHANICAL, INC08/06/2004
BIS—ISSUEDLEON D DEMATTEIS CONSTRUCTION07/07/2004
BISPLISSUEDWDF INCORPORATED06/16/2004
BISPLISSUEDWDF INC.06/16/2004
BISPLISSUEDWDF INC.09/22/2003
BISPLISSUEDWDF INCORPORATED06/09/2003
BISPLISSUEDWDF INCORPORATED04/28/2003
BISFPISSUEDB&J FIRE INC/FIREMASTERS04/21/2003
BIS—ISSUEDLEON D DEMATTEIS CONSTRUCTION03/07/2003
BISEQISSUEDLEON D. DEMATTEIS CONST CORP03/07/2003
BISPLISSUEDOLYMPIC PLUMBING & HEATING CORP10/16/2002
BISPLISSUEDWDF INC.09/27/2002
BISPLISSUEDWDF INC.09/27/2002
BISOTISSUEDLEON D. DEMATTEIS CONST CORP09/27/2002
BISOTISSUEDLEON D. DEMATTEIS CONST CORP09/27/2002
BISOTISSUEDLEON D. DEMATTEIS CONST CORP09/27/2002
BISPLISSUEDWDF INC.09/27/2002
BISPLISSUEDWDF INCORPORATED05/30/2002
BIS—ISSUEDLEON D DEMATTEIS CONSTRUCTION04/04/2002
BISPLISSUEDWDF INCORPORATED04/04/2002
BISEQRE-ISSUEDLEON D. DEMATTEIS CONST CORP12/19/2001
BIS—RE-ISSUEDLEON D. DEMATTEIS CONST CORP12/19/2001
BISPLISSUEDWDF INC.09/17/2001
BIS—RE-ISSUEDLEON D. DEMATTEIS CONST CORP09/14/2001
BISOTISSUEDLEON D. DEMATTEIS CONST CORP05/25/2001
BISEQISSUEDLEON D. DEMATTEIS CONST CORP05/25/2001
BIS—ISSUEDCONDOR ASSOCIATES LIMITED01/16/2001
BISEQISSUEDAMCCC12/29/2000
+ 4 more permits on file
1 project · most recent 01/08/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026——Ventilation Systems
Ventilation
Greenheck CUBE-240XP-15 1,875 CFM · Exhaust Fan ×2
GB-098-4 190 CFM · Exhaust Fan ×2
GB-160HP-7 1,250 CFM · Exhaust Fan ×2
CUBE-2450XP-15 1,680 CFM · Exhaust Fan ×1
CUBE-360XP-30 4,470 CFM · Exhaust Fan ×1
CUBE-360XP-50 5,040 CFM · Exhaust Fan ×1
GB-097-4 200 CFM · Exhaust Fan ×1
GB-099-4 575 CFM · Exhaust Fan ×1
GB-140-3 275 CFM · Exhaust Fan ×1
GB-140-5 400 CFM · Kitchen Exhaust ×1
GB-140HP-7 775 CFM · Exhaust Fan ×1
GB-330-15 7,000 CFM · Exhaust Fan ×1
2 projects · most recent 01/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/08/2026——Storm
02/25/2025——Storm, Water/Sanitary
7 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedDORION NORTON ELECL CONT—
08/26/2026Permit IssuedBrooklyn Solar Electric—
07/22/2024CompletePRECISION ELECL CONT CORPGeneral Wiring
05/18/2023CompleteGEMINI ELECTRIC CO., INC.—
01/27/2023CompleteSTANCO SYSTEM ELEC'L CONT—
09/19/2022CompleteURBAN ELECTRICAL CORPGeneral Wiring
02/05/2020CompleteCHARAN ELEC'L ENTERP'S IN—
3 projects · most recent 06/22/2026
FiledStatusContractorScope
06/22/2026——1 scope_items
01/08/2026——2 scope_items
02/25/2025——1 scope_items
3 projects · most recent 06/22/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
06/22/2026Permit IssuedBAGIANA CONSTRUCTION INCFence
06/22/2026——Scaffold
06/22/2026Permit IssuedBAGIANA CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2023Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
02/01/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
06/07/2026Post-installed Anchors—special
02/27/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
02/09/2026Shutoff dampersNELSON LOPEZenergy_progress
01/07/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
01/07/2026Post-installed AnchorsNELSON LOPEZspecial
01/07/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/07/2026Maintenance informationNELSON LOPEZenergy_progress
01/07/2026Electrical motors and elevatorsNELSON LOPEZenergy_progress
01/07/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
01/07/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
01/07/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/07/2026Post-installed AnchorsNELSON LOPEZspecial
09/10/2025Mechanical SystemsNELSON LOPEZspecial
09/10/2025FinalNELSON LOPEZprogress
05/29/2025Mechanical SystemsNELSON LOPEZspecial
05/29/2025Shutoff dampersNELSON LOPEZenergy_progress
05/29/2025Electrical motors and elevatorsNELSON LOPEZenergy_progress
05/29/2025HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
05/29/2025HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
05/29/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
05/29/2025FinalNELSON LOPEZprogress
05/21/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
05/21/2025HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
05/21/2025Electrical motors and elevatorsNELSON LOPEZenergy_progress
05/21/2025Mechanical SystemsNELSON LOPEZspecial
Latest 25 of 58.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ps / I.S. 208Education—
Project Q01413280 Alteration · Objections · 06/22/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/27/2026Q00586268-P7Request digital key ↗
08/27/2026Q00586268-P1Request digital key ↗
08/27/2026Q00586268-P2Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/27/2026Q00586268-I1Open ↗
08/27/2026Q00586268-S1Open ↗
08/27/2026Q00586268-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/28/2026Q01175509-I1Open ↗
09/12/2026Q00586268-P1Open ↗
09/12/2026Q00586268-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026Q01175509-I1Open ↗
09/12/2026Q00586268-P1Open ↗
09/01/2026Q00820285-P2Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00586268-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01175509-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01175509-S2Open ↗
▸Approvals, Objections & Sign-offs52
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)24
08/16/2026Q01413279-I1Open ↗
08/15/2026Q01413280-I1Open ↗
08/15/2026Q01413282-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/25/2026Q00820285-P1Open ↗
08/25/2026Q00820285-I1Open ↗
08/25/2026Q00820285-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026Q00586268-I1Open ↗
08/13/2026Q00586268-S1Open ↗
08/13/2026Q00820285-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents25
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal20
08/16/2026Q01413279-I1Open ↗
08/15/2026Q01413280-I1Open ↗
08/15/2026Q01413282-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026Q01285295-S1Open ↗
08/13/2026Q01285295-S2Open ↗
08/13/2026Q01285295-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026Q00586268-S1Open ↗
08/13/2026Q00586268-I1Open ↗