BuildNYC
Public elementary, junior or senior high
74-30 COMMONWEALTH BOULEVARD
QUEENS · Bellerose · BIN 4529898
💬 Discuss this project
2001Year Built
—Stories
W1Building Class
R3-2Zoning
123,832 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only 4 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 230,330 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. / I.S. 208 - Queens7p · 2 filings · 20 docs
PenthouseP.S. / I.S. 208 - Queens5p · 1 filing · 20 docs
Floor 3P.S. / I.S. 208 - Queens6p · 2 filings · 20 docs
Floor 2P.S. / I.S. 208 - Queens5p · 2 filings · 20 docs
Floor 1Public School 208, P.S. / I.S. 208 - QueensUnder Construction7p · 4 filings · 18 docs
CellarP.S. / I.S. 208 - Queens2p · 1 filing · 20 docs
BasementP.S. / I.S. 208 - Queens1p · 1 filing · 20 docs
Sub-BasementP.S. / I.S. 208 - Queens9p · 1 filing · 20 docs
Site & exteriorP.S. / I.S. 208 - Queens, Public School 208Under Construction9p · 6 filings · 16 docs
Filed — no permit issuedP.S. / I.S. 208 - Queens7p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6710/13/2026
NYC Department of Education103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority603/21/2026
JMV Associates1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NamronGeneral Contractor507/08/2026
Bagiana ConstructionScaffold410/03/2026
Brooklyn SolarworksGeneral Contractor209/16/2026
Urban ElectricalElectrical103/21/2026
Stanco System Electrical ContElectrical103/22/2026
Do Rite MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Barun8842109/08/2026
Universal Testing and Ins4001806/22/2026
NV5 NY - Engineering, Architects9319102/21/2025
Building Lifecycle
All (158)Filed (26)Permit Issued (11)Signed Off (2)Violation (60)Inspection (3)Objection (26)Special Inspection (30)
10/02/2026
Permit issued — Supported Scaffold
Q01413278-I1-SF
10/02/2026
Permit issued — Protection and Mechanical Methods
Q01413282-I1-PMM
09/23/2026
Permit issued — Sidewalk Shed
Q01413276-I1-SH
09/16/2026
Permit issued — Construction Fence
Q01413279-I1-FN
09/15/2026
Permit issued — Foundation
Q01417838-S1-GC-CX
09/10/2026
Permit issued — Solar
Q01417838-I1-SL
09/08/2026
Filed — Alteration
INSTALL SOLAR PV ON CARPORT CANOPY (FILED UNDER SUBSEQUENT FILING). NO CHANGE IN USE, OCCUPANCY, OR EGRESS. FEE EXEMPT.
Q01417838-S1
09/08/2026
Filed — Alteration
INSTALL SOLAR PV ON CARPORT CANOPY (FILED UNDER SUBSEQUENT FILING). NO CHANGE IN USE, OCCUPANCY, OR EGRESS. FEE EXEMPT.
Q01417838-I1
08/26/2026
Special inspection requirement — Final
CHRIS KIM
08/26/2026
Special inspection requirement — Footing and Foundation
CHRIS KIM
08/26/2026
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
08/23/2026
Objection resolved — Open
08/23/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Resolved
07/26/2026
Objection resolved — Resolved
07/26/2026
Objection resolved — Addressed
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/22/2026
Filed — Alteration
Filing for temporary construction fence. No change in use, egress or occupancy. Q01285295, Q01175509
Q01413279-I1
06/22/2026
Filed — Alteration
Filing for temporary debris chute. No change in use, egress or occupancy.. Q01285295
Q01413282-I1
06/22/2026
Filed — Alteration
Filing for temporary support of excavation. No change in use, egress or occupancy. Q01175509
Q01413280-I1
06/22/2026
Filed — Alteration
Filing for supported scaffolding. No change in use, egress or occupancy. Q01285295
Q01413278-I1
06/22/2026
Filed — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy. Q01285295
Q01413276-I1
06/16/2026
Special inspection requirement — Final
CHRIS KIM
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRIS KIM
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
06/07/2026
Special inspection requirement — Post-installed Anchors
06/07/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
02/27/2026
Objection resolved — Addressed
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
02/24/2026
Objection resolved — Addressed
02/13/2026
Violation issued (ECB, closed)
Construction
02/13/2026
Violation issued (ECB, closed)
Construction
02/09/2026
Objection resolved — Addressed
02/09/2026
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
01/20/2026
Objection raised — Other
01/20/2026
Objection raised — Other
01/20/2026
Objection raised — Other
01/08/2026
Filed — Alteration
Q208 : Remove & Replace Roofing, As-Built Roofing & Bulk Head Roofing including Parapet Walls; Reflashing on the Roofs, Insulation for the Designated Outside Perimeter, Replace, Repair, Point, Repoint, Caulk Cement, Bricks, Stone Works; miscellaneous work
Q01285295-S2
01/08/2026
Filed — Alteration
Q208 : Remove & Replace Roofing, As-Built Roofing & Bulk Head Roofing including Parapet Walls; Reflashing on the Roofs, Insulation for the Designated Outside Perimeter, Replace, Repair, Point, Repoint, Caulk Cement, Bricks, Stone Works; miscellaneous work
Q01285295-S1
01/08/2026
Filed — Alteration
Q208 : Remove & Replace Roofing, As-Built Roofing & Bulk Head Roofing including Parapet Walls; Reflashing on the Roofs, Insulation for the Designated Outside Perimeter, Replace, Repair, Point, Repoint, Caulk Cement, Bricks, Stone Works; miscellaneous work
Q01285295-I1
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
01/07/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
01/07/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
01/07/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
01/07/2026
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
12/12/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
09/10/2025
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
09/10/2025
Special inspection requirement — Final
NELSON LOPEZ
08/21/2025
Signed off — Alteration
P.S. 208-Q: Repair of existing, deficient mechanical equipment.
Q00586268-S1
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedBagiana Construction10/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBagiana Construction10/02/2026
DOB NOWSidewalk ShedPermit IssuedBagiana Construction09/23/2026
DOB NOWConstruction FencePermit IssuedBagiana Construction09/16/2026
DOB NOWFoundationPermit IssuedBrooklyn Solarworks09/15/2026
DOB NOWSolarPermit IssuedBrooklyn Solarworks09/10/2026
DOB NOWMechanical SystemsSigned-offNamron07/14/2025
DOB NOWMechanical SystemsSigned-offNamron08/15/2024
DOB NOWPlumbingSigned-offDo Rite Mechanical05/04/2023
DOB NOWBoiler EquipmentSigned-offDouglas Simmons01/31/2023
DOB NOWMechanical SystemsSigned-offNamron09/12/2022
BISOTISSUEDWilliam A. Gross Construction02/02/2015
BISOTISSUEDLevinson & Santoro Electric08/25/2010
BISMHISSUEDLevinson & Santoro Electric08/03/2009
BISPLISSUEDEagle 1 Mechanical08/06/2004
BIS—ISSUEDLeon D Dematteis Construction07/07/2004
BISPLISSUEDWDF06/16/2004
BISPLISSUEDWDF06/16/2004
BISPLISSUEDWDF09/22/2003
BISPLISSUEDWDF06/09/2003
BISPLISSUEDWDF04/28/2003
BISFPISSUEDB&J Fire Inc/Firemasters04/21/2003
BIS—ISSUEDLeon D Dematteis Construction03/07/2003
BISEQISSUEDLeon D. Dematteis Construction03/07/2003
BISPLISSUEDOlympic Plumbing & Heating10/16/2002
BISPLISSUEDWDF09/27/2002
BISPLISSUEDWDF09/27/2002
BISOTISSUEDLeon D. Dematteis Construction09/27/2002
BISOTISSUEDLeon D. Dematteis Construction09/27/2002
BISOTISSUEDLeon D. Dematteis Construction09/27/2002
BISPLISSUEDWDF09/27/2002
BISPLISSUEDWDF05/30/2002
BIS—ISSUEDLeon D Dematteis Construction04/04/2002
BISPLISSUEDWDF04/04/2002
BISEQRE-ISSUEDLeon D. Dematteis Construction12/19/2001
BIS—RE-ISSUEDLeon D. Dematteis Construction12/19/2001
BISPLISSUEDWDF09/17/2001
BIS—RE-ISSUEDLeon D. Dematteis Construction09/14/2001
BISOTISSUEDLeon D. Dematteis Construction05/25/2001
BISEQISSUEDLeon D. Dematteis Construction05/25/2001
+ 6 more permits on file
1 project · most recent 01/08/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026——Ventilation Systems
Ventilation
Greenheck CUBE-240XP-15 1,875 CFM · Exhaust Fan ×2
GB-098-4 190 CFM · Exhaust Fan ×2
GB-160HP-7 1,250 CFM · Exhaust Fan ×2
CUBE-2450XP-15 1,680 CFM · Exhaust Fan ×1
CUBE-360XP-30 4,470 CFM · Exhaust Fan ×1
CUBE-360XP-50 5,040 CFM · Exhaust Fan ×1
GB-097-4 200 CFM · Exhaust Fan ×1
GB-099-4 575 CFM · Exhaust Fan ×1
GB-140-3 275 CFM · Exhaust Fan ×1
GB-140-5 400 CFM · Kitchen Exhaust ×1
GB-140HP-7 775 CFM · Exhaust Fan ×1
GB-330-15 7,000 CFM · Exhaust Fan ×1
2 projects · most recent 01/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/08/2026——Storm
02/25/2025——Storm, Water/Sanitary
7 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedDorion Norton Electrical Cont—
08/26/2026Permit IssuedBrooklyn Solar Electric—
07/22/2024CompletePrecision Electrical ContGeneral Wiring
05/18/2023CompleteGemini Electric Co—
01/27/2023CompleteStanco System Electrical Cont—
09/19/2022CompleteUrban ElectricalGeneral Wiring
02/05/2020CompleteCharan Electrical Enterp's—
4 projects · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedBrooklyn Solarworks1 scope_items
06/22/2026——1 scope_items
01/08/2026——2 scope_items
02/25/2025——1 scope_items
1 project · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedBrooklyn Solarworks102 panels, 44.88 kw
3 projects · most recent 06/22/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
06/22/2026Permit IssuedBagiana ConstructionFence
06/22/2026Permit IssuedBagiana ConstructionSidewalk Shed
06/22/2026Permit IssuedBagiana ConstructionScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2023Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
02/01/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/26/2026Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
08/26/2026FinalCHRIS KIMprogress
08/26/2026Footing and FoundationCHRIS KIMprogress
08/26/2026Air barrier - visual inspectionCHRIS KIMenergy_progress
06/16/2026Fire-Resistant Penetrations and JointsCHRIS KIMspecial
06/16/2026Energy Code Compliance InspectionsCHRIS KIMprogress
06/16/2026FinalCHRIS KIMprogress
06/07/2026Post-installed Anchors—special
06/07/2026Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
02/27/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
02/09/2026Shutoff dampersNELSON LOPEZenergy_progress
01/07/2026Post-installed AnchorsNELSON LOPEZspecial
01/07/2026Post-installed AnchorsNELSON LOPEZspecial
01/07/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/07/2026Maintenance informationNELSON LOPEZenergy_progress
01/07/2026Electrical motors and elevatorsNELSON LOPEZenergy_progress
01/07/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
01/07/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
01/07/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
01/07/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
09/10/2025Mechanical SystemsNELSON LOPEZspecial
09/10/2025FinalNELSON LOPEZprogress
05/29/2025Mechanical SystemsNELSON LOPEZspecial
05/29/2025FinalNELSON LOPEZprogress
05/29/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Public School 208EducationFloor 1
Project Q01417838 Alteration · Permit Entire · 09/08/2026
P.S. / I.S. 208 - QueensEducationEntire building
Project Q01285295 Alteration · Approved · 01/08/2026
Project Q01175509 Alteration · Approved · 02/18/2025
Project Q00908603 Alteration · Approved · 07/24/2023
Project Q00820285 Alteration · Permit Entire · 01/29/2023
Project Q00586268 Alteration · LOC Issued · 08/31/2021
Project Q01413276 Alteration · Permit Entire · 06/22/2026
Project Q01413278 Alteration · Permit Entire · 06/22/2026
Project Q01413279 Alteration · Permit Entire · 06/22/2026
Project Q01413280 Alteration · Approved · 06/22/2026
Project Q01413282 Alteration · Permit Entire · 06/22/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
10/13/2026Q01417838-I1Request digital key ↗
10/13/2026Q01417838-S1Request digital key ↗
08/27/2026Q00586268-P4Request digital key ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/11/2026Q01417838-S1Open ↗
09/11/2026Q01417838-I1Open ↗
08/27/2026Q00586268-P7Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/28/2026Q01175509-I1Open ↗
09/12/2026Q00586268-P1Open ↗
09/12/2026Q00586268-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026Q01175509-I1Open ↗
09/12/2026Q00586268-P1Open ↗
09/01/2026Q00820285-P2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/11/2026Q01417838-I1Open ↗
09/11/2026Q01417838-S1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00586268-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01175509-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01175509-S2Open ↗
▸Approvals, Objections & Sign-offs54
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)24
08/16/2026Q01413279-I1Open ↗
08/15/2026Q01413280-I1Open ↗
08/15/2026Q01413282-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
09/11/2026Q01417838-I1Open ↗
09/11/2026Q01417838-S1Open ↗
08/25/2026Q00820285-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026Q01285295-S1Open ↗
08/13/2026Q00908603-I1Open ↗
08/13/2026Q00820285-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents25
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal20
08/16/2026Q01413279-I1Open ↗
08/15/2026Q01413280-I1Open ↗
08/15/2026Q01413282-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026Q01285295-S1Open ↗
08/13/2026Q01285295-S2Open ↗
08/13/2026Q01285295-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026Q00586268-I1Open ↗
08/13/2026Q00586268-S1Open ↗