← Back
Two stories - detached, small or mid-size
74 ST STEPHENS PLACE
💬 Discuss this project
1930Year Built
1.75Stories
A1Building Class
R2Zoning
1,643 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,733 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 1 filing · 20 docs
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1Under Construction5p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANARK CONSULTING ENGINEERING D.P.C506/01/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANARK CONSULTING ENGINEERING D P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BILTMORE GENERAL CONTRACTORSGeneral Contractor908/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANARK CONSULTING ENGINEE6824306/01/2026
Building Lifecycle
All (35)Filed (5)Permit Issued (7)Inspection (2)Objection (6)Special Inspection (15)
08/05/2026
Permit issued — Foundation
S01182148-S4-FO
07/21/2026
Permit issued — Structural
S01182148-S5-ST
07/20/2026
Permit issued — Construction Fence
S01182148-I1-FN
07/20/2026
Permit issued — General Construction
S01182148-S2-GC
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/24/2026
Objection raised — Structural
06/24/2026
Objection raised — Structural
06/24/2026
Objection raised — Other
06/01/2026
Filed — Alteration
S01182148-S5
06/01/2026
Filed — Alteration
S01182148-S4
05/22/2026
Special inspection requirement — Final
REJEP KOLAR
05/22/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
REJEP KOLAR
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
REJEP KOLAR
05/20/2026
Special inspection requirement — Protection of exposed foundation insulation
REJEP KOLAR
12/15/2025
Permit issued — Construction Fence
S01182148-I1-FN
06/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/07/2025
Filed — Alteration
S01182148-S2
05/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
REJEP KOLAR
05/05/2025
Special inspection requirement — Fireplaces
REJEP KOLAR
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
REJEP KOLAR
05/05/2025
Special inspection requirement — Fenestration areas
REJEP KOLAR
05/05/2025
Special inspection requirement — Insulation placement and R values
REJEP KOLAR
05/05/2025
Special inspection requirement — Interior lighting power
REJEP KOLAR
05/05/2025
Special inspection requirement — Air barrier - visual inspection
REJEP KOLAR
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
REJEP KOLAR
05/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
REJEP KOLAR
05/05/2025
Special inspection requirement — Fenestration air leakage
REJEP KOLAR
04/16/2025
Permit issued — Construction Fence
S01182148-I1-FN
04/16/2025
Permit issued — General Construction
S01182148-S1-GC
03/14/2025
Filed — Alteration
S01182148-S1
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
REJEP KOLAR
02/17/2025
Filed — Alteration
S01182148-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedBILTMORE GENERAL CONTRACTORS08/05/2026
DOB NOWStructuralPermit IssuedBILTMORE GENERAL CONTRACTORS07/21/2026
DOB NOWConstruction FencePermit IssuedBILTMORE GENERAL CONTRACTORS07/20/2026
DOB NOWGeneral ConstructionPermit IssuedBILTMORE GENERAL CONTRACTORS07/20/2026
DOB NOWConstruction FencePermit IssuedBILTMORE GENERAL CONTRACTORS12/15/2025
DOB NOWConstruction FencePermit IssuedBILTMORE GENERAL CONTRACTORS04/16/2025
DOB NOWGeneral ConstructionPermit IssuedBILTMORE GENERAL CONTRACTORS04/16/2025
1 project · most recent 04/09/2025
FiledStatusContractorScope
04/09/2025Permit IssuedBNH ELECTRICAL CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
05/22/2026FinalREJEP KOLARprogress
05/22/2026Construction Utilizing CLT or SCL, Type IVREJEP KOLARspecial
05/22/2026Structural Stability – Alterations of existing buildingsREJEP KOLARspecial
05/20/2026Protection of exposed foundation insulationREJEP KOLARenergy_progress
05/05/2025Fenestration and door U-factor and product ratingsREJEP KOLARenergy_progress
05/05/2025FireplacesREJEP KOLARenergy_progress
05/05/2025Fire-Resistant Penetrations and JointsREJEP KOLARspecial
05/05/2025Fenestration areasREJEP KOLARenergy_progress
05/05/2025Insulation placement and R valuesREJEP KOLARenergy_progress
05/05/2025Interior lighting powerREJEP KOLARenergy_progress
05/05/2025Air barrier - visual inspectionREJEP KOLARenergy_progress
05/05/2025Energy Code Compliance InspectionsREJEP KOLARprogress
05/05/2025Fire-Resistance Rated ConstructionREJEP KOLARprogress
05/05/2025Fenestration air leakageREJEP KOLARenergy_progress
03/14/2025Energy Code Compliance InspectionsREJEP KOLARprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01182148-S2Request digital key ↗
08/20/2026S01182148-S1Request digital key ↗
08/20/2026S01182148-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01182148-S2Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026S01182148-S1Open ↗
08/20/2026S01182148-I1Open ↗
08/20/2026S01182148-S6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S01182148-S1Open ↗
08/27/2026S01182148-S2Open ↗
08/27/2026S01182148-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01182148-S2Open ↗
08/24/2026S01182148-S5Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/20/2026S01182148-S2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026S01182148-S1Open ↗
08/20/2026S01182148-S6Open ↗
08/20/2026S01182148-S4Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026S01182148-S4Open ↗
▸DOB NOWSOIL REPORT1
08/20/2026S01182148-S4Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S01182148-S2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01182148-S2Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S01182148-S2Open ↗