← Back
Elevator apt, semi-fireproof without stores
740 CLARKSON AVENUE
BROOKLYN · BIN 3108020
💬 Discuss this project
1958Year Built
6Stories
D1Building Class
R5Zoning
48,150 sfGross Floor Area
57Units
LL97 CoveredRent Stabilized18 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: ACHIM BROS. LLC · 9,000 sf lot · 5.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof4p · 5 filings · 20 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAGER MANAGEMENT1007/08/2026
ACHIM BROS. LLC1303/22/2026
SH MANAGEMENT103/22/2026
ACHIM BROX. LLC103/22/2026
TRI-RUGBY MANAGEMENT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES303/21/2026
I L CONSULTING203/21/2026
RIZZO GROUP203/21/2026
HIERARCH-E203/21/2026
AE DESIGN SOLUTION203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CERTIFIED CONTRACTING INC.General Contractor403/21/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor307/08/2026
EASTERN ALLIANCE LLCGeneral Contractor207/08/2026
OVERLAND CONTRACTING INCGeneral Contractor207/08/2026
ETAK SYSTEMS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106111/19/2025
ASR ENGINEERING PC8404110/02/2023
GEIGER ENGINEERING. PC689110/02/2023
JEREMY K MCKEON, P.E.7263111/03/2022
R MARSAC CONSULTING LLC329106/09/2021
BURTNER ENGINEERING SERVI5910112/13/2017
Building Lifecycle
All (130)Filed (7)Permit Issued (11)Signed Off (5)Facade (FISP) (12)Violation (60)Objection (30)Special Inspection (5)
04/09/2026
Signed off — Alteration
Replacement of existing condensing unit on roof. Replacement of existing air handling unit in existing equipment room in cellar. Removal of spot cool unit. Related lineset. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress
B01212972-I1
02/20/2026
Permit issued — Mechanical Systems
B01212972-I1-GC-CX
01/23/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Structural
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
11/28/2025
Objection raised — Zoning
11/28/2025
Objection raised — Zoning
11/28/2025
Objection raised — Fire_Protection
11/28/2025
Objection raised — Zoning
11/28/2025
Objection raised — Mechanical
11/19/2025
Filed — Alteration
Replacement of existing condensing unit on roof. Replacement of existing air handling unit in existing equipment room in cellar. Removal of spot cool unit. Related lineset. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress
B01212972-I1
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Manojkumar Patel
11/19/2025
Special inspection requirement — Post-installed Anchors
Manojkumar Patel
08/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08047610-I1
06/09/2025
Violation issued (HPD, closed)
A
04/22/2025
Cycle 9 facade report signed — SAFE
04/18/2025
Special inspection requirement — Mechanical Systems
Manojkumar Patel
04/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Manojkumar Patel
04/18/2025
Special inspection requirement — Final
Manojkumar Patel
03/25/2025
Signed off — Alteration
FACADE REPAIRS FOR FL'S 1-6 & ROOF, REPOINT MASONRY MORTAR JOINTS , DEFECTIVE WINDW LINTEL, DEFECTIVE WINDOW SILL. REPL/ DEFECTIVE FACE BRICK & DEFECTIVE COPPING STONE , REPLACE DEFECTIVE STUCOO & COPPING CLAY TILES ., CHIMNEY AND FLUE LINER . AS PER PLAN
B00918872-I1
02/17/2025
Cycle 9 facade report submitted
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
C
02/01/2025
Violation issued (HPD, closed)
B
02/01/2025
Violation issued (HPD, closed)
B
01/22/2025
Cycle 9 facade inspection completed
01/08/2025
Violation issued (HPD, open)
B
01/08/2025
Violation issued (HPD, open)
B
11/27/2024
Permit issued — General Construction
B00918872-I1-GC
11/18/2024
Permit issued — Sidewalk Shed
B08047610-I1-SH
05/15/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Permit issued — Suspended Scaffold
B01019063-I1-SC
04/03/2024
Filed — Alteration
Renewal of SR23-2357 only
B01019063-I1
02/29/2024
Violation issued (ECB, closed)
Elevators
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2024
Violation issued (ECB, closed)
Elevators
12/14/2023
Permit issued — General Construction
B00918872-I1-GC
12/11/2023
Permit issued — Sidewalk Shed
B08047610-I1-SH
10/02/2023
Filed — Alteration
FACADE REPAIRS FOR FL'S 1-6 & ROOF, REPOINT MASONRY MORTAR JOINTS , DEFECTIVE WINDW LINTEL, DEFECTIVE WINDOW SILL. REPL/ DEFECTIVE FACE BRICK & DEFECTIVE COPPING STONE , REPLACE DEFECTIVE STUCOO & COPPING CLAY TILES ., CHIMNEY AND FLUE LINER . AS PER PLAN
B00918872-I1
06/27/2023
Signed off — Alteration
AT&T - Replacement of existing antennas & RRUs, removal of RRUs on the rooftop (10075112) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egress or occupancy.
B08029842-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/21/2022
Violation issued (ECB, closed)
Elevators
12/14/2022
Permit issued — Sidewalk Shed
B08047610-I1-SH
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offETAK SYSTEMS LLC02/20/2026
DOB NOWGeneral ConstructionSigned-offGALAXY GENERAL CONTRACTIO11/27/2024
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL11/18/2024
DOB NOWSuspended ScaffoldPermit IssuedCERTIFIED CONTRACTING INC04/08/2024
DOB NOWGeneral ConstructionSigned-offGALAXY GENERAL CONTRACTIO12/14/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL12/11/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL12/14/2022
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC11/28/2022
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC06/29/2021
DOB NOWAntennaSigned-offEASTERN ALLIANCE LLC04/06/2018
DOB NOWAntennaSigned-offEASTERN ALLIANCE LLC01/31/2018
BISOTISSUEDBECHTEL INFRASTRUCTURE AN09/02/2015
BISOTISSUEDCERTIFIED CONTRACTING INC.01/25/2007
BISEQISSUEDCOLGATE SCAFFOLDING01/24/2007
BISEQISSUEDPETER & B CONSTRUCTION INC05/24/2002
BISOTISSUEDPETER & B CONSTRUCTION INC05/24/2002
BISOTISSUEDVANTAGE ASSOCIATES02/11/2002
BISOTISSUEDF J F CONSTRUCTION CORP12/04/2000
BISOTISSUEDBETA STEAM AND POWER08/07/1992
BISSPISSUEDD&L PLUMBING AND HEATING05/30/1991
BISOTISSUEDARCADIA CONSTRUCTION CO05/21/1991
2 jobs · most recent 06/06/2024
FiledStatusContractorScope
06/06/2024Permit IssuedOPTIMAL ELECTRIC, INC—
05/30/2024Permit IssuedOPTIMAL ELECTRIC, INC—
1 job · most recent 04/03/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/03/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/19/2025Fire-Resistant Penetrations and JointsManojkumar Patelspecial
11/19/2025Post-installed AnchorsManojkumar Patelspecial
04/18/2025Mechanical SystemsManojkumar Patelspecial
04/18/2025Tenant Protection Plan ComplianceManojkumar Patelspecial
04/18/2025FinalManojkumar Patelprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00519823-I1Request digital key ↗
08/28/2026B08029842-I1Request digital key ↗
08/28/2026B08047610-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
09/03/2015321145685Open ↗
06/19/2015321145685Open ↗
▸BISWORK PERMIT APPLICATION1
09/03/2015321145685Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B00004809-I1Open ↗
09/01/2026B00519823-I1Open ↗
08/28/2026B08029842-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01212972-I1Open ↗
09/23/2026B01212972-I1Open ↗
09/23/2026B01212972-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/19/2015321145685Open ↗
09/03/2015321145685Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B01212972-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
06/30/2015321145685Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00519823-I1Open ↗
08/28/2026B08029842-I1Open ↗
08/15/2026B00004809-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/03/2015321145685Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/19/2015321145685Open ↗
09/03/2015321145685Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/19/2015321145685Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/19/2015321145685Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/19/2015321145685Open ↗
09/03/2015321145685Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/03/2015321145685Open ↗
06/19/2015321145685Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/03/2015321145685Open ↗
▸DOB NOWCalculations1
08/13/2026B01019063-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01019063-I1Open ↗