← Back
BuildNYC
Elevator apt, semi-fireproof without stores
740 CLARKSON AVENUE
BROOKLYN · BIN 3108020
💬 Discuss this project
1958Year Built
6Stories
D1Building Class
R5Zoning
48,150 sfGross Floor Area
57Units
LL97 CoveredRent Stabilized10 Active Violations 1 likely answered 4 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Achim Brothers · 9,000 sf lot · 5.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHager Management7p · 5 filings · 20 docs
Floor 1Kings County Hospital antenna and chimney work2 filings · 6 docs
CellarAT&T Kings Co. Hospital HVAC equipment replacement4p · 1 filing · 8 docs
Site & exteriorHager Management11p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Achim Brothers1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services303/21/2026
Idm Associates203/21/2026
Codegreen203/21/2026
Hierarch-E203/21/2026
AE Design Solution203/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Certified ContractingGeneral Contractor403/21/2026
Powers Bridging & ScaffoldingScaffold307/08/2026
Eastern AllianceGeneral Contractor207/08/2026
Overland ContractingGeneral Contractor207/08/2026
Etak SystemsGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106111/19/2025
Asr Engineering8404110/02/2023
Geiger Engineering689110/02/2023
Jeremy K McKeon, P.E7263111/03/2022
R Marsac Consulting329106/09/2021
Burtner Engineering Services5910112/13/2017
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
08/25/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/28/2026
Elevator Category 1 inspection report filed
04/09/2026
Signed off — Alteration
Replacement of existing condensing unit on roof. Replacement of existing air handling unit in existing equipment room in cellar. Removal of spot cool unit. Related lineset. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress
B01212972-I1
02/20/2026
Permit issued — Mechanical Systems
B01212972-I1-GC-CX
225 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEtak Systems02/20/2026
DOB NOWGeneral ConstructionSigned-offGalaxy General Contractio11/27/2024
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol11/18/2024
DOB NOWSuspended ScaffoldPermit IssuedCertified Contracting04/08/2024
DOB NOWGeneral ConstructionSigned-offGalaxy General Contractio12/14/2023
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol12/11/2023
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol12/14/2022
DOB NOWAntennaSigned-offOverland Contracting11/28/2022
DOB NOWAntennaSigned-offOverland Contracting06/29/2021
DOB NOWAntennaSigned-offEastern Alliance04/06/2018
DOB NOWAntennaSigned-offEastern Alliance01/31/2018
BISOTISSUEDBechtel Infrastructure An09/02/2015
BISOTISSUEDCertified Contracting01/25/2007
BISEQISSUEDColgate Scaffolding01/24/2007
BISEQISSUEDPeter & B Construction05/24/2002
BISOTISSUEDPeter & B Construction05/24/2002
BISOTISSUEDVantage Associates02/11/2002
BISOTISSUEDFJF Construction12/04/2000
BISOTISSUEDBeta Steam and Power08/07/1992
BISSPISSUEDD&L Plumbing and Heating05/30/1991
BISOTISSUEDArcadia Construction Co05/21/1991
2 projects · most recent 06/06/2024
FiledStatusContractorScope
06/06/2024Permit IssuedOptimal Electric—
05/30/2024Permit IssuedOptimal Electric—
1 project · most recent 04/03/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/03/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/19/2025Fire-Resistant Penetrations and JointsManojkumar Patelspecial
11/19/2025Post-installed AnchorsManojkumar Patelspecial
04/18/2025Mechanical SystemsManojkumar Patelspecial
04/18/2025Tenant Protection Plan ComplianceManojkumar Patelspecial
04/18/2025FinalManojkumar Patelprogress
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account