← Back
Auto body / collision or auto repair
740 CONEY ISLAND AVENUE
BROOKLYN · Kensington · BIN 3126328
💬 Discuss this project
1930Year Built
1Stories
G2Building Class
C8-2Zoning
3,060 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Auto body / collision or auto repair · Owner of record: MOSHET REALTY CORP · 4,400 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOSHET304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKW ENGINEERING, P.C.205/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JKW ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DBC INTERIOR INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKW ENGINEERING, P.C.1856205/20/2026
Building Lifecycle
All (13)Filed (2)Permit Issued (1)Signed Off (1)Violation (6)Special Inspection (3)
05/27/2026
Signed off — Alteration
Fire restoration of one-story building for stores 740 & 742. Replace damaged interior ceiling, roof joists, roll down gates & repair roof as per plans. To resolve DOB violations 082825CER01CR & 082825CER02CR. No change in egress, occupancy or use.
B01307326-I1
05/20/2026
Filed — Alteration
Fire restoration of one-story building for stores 740 & 742. Replace damaged interior ceiling, roof joists, roll down gates & repair roof as per plans. To resolve DOB violations 082825CER01CR & 082825CER02CR. No change in egress, occupancy or use.
B01307326-P1
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Wai
05/19/2026
Special inspection requirement — Final
James Wai
05/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Wai
01/20/2026
Permit issued — General Construction
B01307326-I1-GC
10/27/2025
Filed — Alteration
Fire restoration of one-story building for stores 740 & 742. Replace damaged interior ceiling, roof joists, roll down gates & repair roof as per plans. To resolve DOB violations 082825CER01CR & 082825CER02CR. No change in egress, occupancy or use.
B01307326-I1
08/28/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/1996
Violation issued (FDNY_NOV, closed)
12/07/1992
Violation issued (FDNY_NOV, closed)
03/21/1988
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDBC INTERIOR01/20/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/19/2026Structural Stability – Alterations of existing buildingsJames Waispecial
05/19/2026FinalJames Waiprogress
05/19/2026Fire-Resistance Rated ConstructionJames Waiprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01307326-P1Request digital key ↗
08/16/2026B01307326-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01307326-I1Open ↗
08/16/2026B01307326-P1Open ↗
08/13/2026B01307326-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B01307326-P1Open ↗
08/31/2026B01307326-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026B01307326-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01307326-P1Open ↗
08/13/2026B01307326-I1Open ↗