← Back
Factory, heavy manufacturing, fireproof
740 EAST 134 STREET
BRONX · Mott Haven-Port Morris · BIN 2003737
💬 Discuss this project
1952Year Built
1Stories
F1Building Class
M1-2/R6AZoning
18,645 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · 18,700 sf lot · 1 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire ProtectionGeneral
Filed — no permit issued14p · 2 filings · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/407/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FIRE VIOLATIONS SERVICES INC603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027407/08/2026
Building Lifecycle
All (29)Filed (4)Violation (9)Objection (10)Special Inspection (6)
07/27/2026
Objection raised — Other
07/27/2026
Objection resolved — Resolved
07/08/2026
Filed — Alteration
EXTENSION OF GAS PIPING AND SPRINKLER SYSTEM PIPING FOR GAS CONNECTION OF SPRAY BOOTH FLAMMABLE BURN UNIT AND SPRINKLER PIPING AND HEADS FOR FIRE PROTECTION OF BOOTH/MIX AND DUCTS.
X01189679-P1
01/20/2026
Objection raised — Admin
01/15/2026
Objection raised — Admin
01/08/2026
Filed — Alteration
INSTALLATIONS PREFABRICATED PAINT SPRAY BOOTH AND MIX ROOM WITH GAS HEAT CONNECTION FOR FLAMMABLE BURN, extension of existing sprinkler system with new priping/new heads for fire suppression of booth and mix rooms and duct exhaust.
X01189667-P1
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/19/2025
Special inspection requirement — Mechanical Systems
Ashish Patel
12/19/2025
Special inspection requirement — Final
Ashish Patel
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection resolved — Addressed
07/03/2025
Objection raised — Fire_Protection
07/03/2025
Objection raised — Fire_Protection
06/26/2025
Filed — Alteration
EXTENSION OF GAS PIPING AND SPRINKLER SYSTEM PIPING FOR GAS CONNECTION OF SPRAY BOOTH FLAMMABLE BURN UNIT AND SPRINKLER PIPING AND HEADS FOR FIRE PROTECTION OF BOOTH/MIX AND DUCTS.
X01189679-I1
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
06/23/2025
Special inspection requirement — Post-installed Anchors
Ashish Patel
06/18/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Zoning
03/29/2025
Filed — Alteration
INSTALLATIONS PREFABRICATED PAINT SPRAY BOOTH AND MIX ROOM WITH GAS HEAT CONNECTION FOR FLAMMABLE BURN, extension of existing sprinkler system with new priping/new heads for fire suppression of booth and mix rooms and duct exhaust.
X01189667-I1
03/04/2025
Special inspection requirement — Sprinkler Systems
Ashish Patel
10/03/2023
Violation issued (FDNY_NOV, closed)
06/07/2023
Violation issued (FDNY_NOV, closed)
01/18/2023
Violation issued (FDNY_NOV, closed)
12/12/2022
Violation issued (FDNY_NOV, closed)
07/27/2022
Violation issued (FDNY_NOV, closed)
07/27/2021
Violation issued (FDNY_NOV, closed)
03/10/2016
Violation issued (FDNY_NOV, closed)
10/29/2010
Violation issued (FDNY_NOV, closed)
06/20/2005
Violation issued (FDNY_NOV, closed)
Nothing on file for this building.
1 project · most recent 01/08/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026——Ventilation Systems
Ventilation
__Junk__ FDNY COA # 5528 USI ITALIA 2 CFM ×4
1 project · most recent 07/08/2026
FiledStatusContractorScope
07/08/2026——8 heads
1 project · most recent 07/08/2026
Gas
FiledStatusContractorScope
07/08/2026——Gas
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/19/2025Fire-Resistant Penetrations and Joints—special
12/19/2025Mechanical SystemsAshish Patelspecial
12/19/2025FinalAshish Patelprogress
06/23/2025Fire-Resistant Penetrations and JointsAshish Patelspecial
06/23/2025Post-installed AnchorsAshish Patelspecial
03/04/2025Sprinkler SystemsAshish Patelspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026X01189667-I1Request digital key ↗
08/19/2026X01189667-P1Request digital key ↗
08/19/2026X01189679-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026X01189679-I1Open ↗
08/19/2026X01189679-P1Open ↗
08/13/2026X01189667-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X01189679-I1Open ↗
09/01/2026X01189679-I1Open ↗
09/01/2026X01189679-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X01189667-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01189667-P1Open ↗
08/13/2026X01189667-I1Open ↗