← Back
Elevator apt, semi-fireproof with stores
740 EMPIRE BOULEVARD
BROOKLYN · BIN 3038438
💬 Discuss this project
1920Year Built
6Stories
D7Building Class
R7-1Zoning
83,856 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized38 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 740 ASSOCIATES L P · 20,100 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof2p · 3 filings · 19 docs
Floor 61 filing · 2 docs
Floor 51 filing · 2 docs
Floor 42p · 2 filings · 15 docs
Floor 31 filing · 2 docs
Floor 21p · 2 filings · 15 docs
Floor 11p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAGER MANAGEMENT1807/08/2026
740 ASSOCIATES,LP2403/22/2026
740 ASSOCIATES L P HAGER703/22/2026
740 ASSOCIATES LP/HAGER M203/22/2026
740 ASSOCIATES LP MAGER M103/22/2026
740 MANAGEMENT CORP303/22/2026
740 ASSOCIATES LPE 505203/22/2026
740 ASSCIATES LPE SUS103/22/2026
EMPIRE ASSOC503/22/2026
M.B. MANAGEMENT203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL PERDEK, PROF. ENG. PLLC407/07/2022
FL&M ENGINEERING DESIGN &INSPECTION203/03/2022
AZIMUTH ENGINEERING101/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
I L CONSULTING403/21/2026
AE DESIGN SOLUTION803/21/2026
RIZZO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor407/08/2026
CERTIFIED CONTRACTING INC.General Contractor307/08/2026
FILARDI, JAMESElectrical103/21/2026
MICHAEL MURPHYElectrical103/21/2026
MURPHY, MICHAELElectrical103/21/2026
PAUL LEFKOWITZElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
YEVGENY KOLTUNOVElectrical103/21/2026
BECKER, CHARLESElectrical103/21/2026
RAMAPO COMMUNICATION CORPGeneral Contractor107/08/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEIGER ENGINEERING. PC689203/03/2022
JEREMY K MCKEON, P.E.7263101/26/2021
Building Lifecycle
All (98)Filed (7)Permit Issued (6)Signed Off (1)Facade (FISP) (15)Violation (60)Inspection (1)Special Inspection (8)
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
A
06/16/2026
Violation issued (HPD, open)
A
03/04/2026
Violation issued (HPD, open)
B
03/04/2026
Violation issued (HPD, closed)
C
03/04/2026
Violation issued (HPD, open)
A
03/04/2026
Violation issued (HPD, open)
B
03/04/2026
Violation issued (HPD, closed)
B
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, closed)
A
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, closed)
A
01/29/2026
Violation issued (HPD, closed)
A
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, closed)
B
01/07/2026
Violation issued (HPD, closed)
A
01/07/2026
Violation issued (HPD, closed)
B
01/07/2026
Violation issued (HPD, closed)
A
01/07/2026
Violation issued (HPD, closed)
B
01/07/2026
Violation issued (HPD, closed)
A
01/07/2026
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (ECB, open)
Elevators
12/06/2025
Violation issued (HPD, closed)
C
11/15/2025
Violation issued (HPD, closed)
B
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, closed)
B
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, open)
C
07/28/2025
Violation issued (HPD, closed)
B
07/28/2025
Violation issued (HPD, closed)
B
03/17/2025
Violation issued (ECB, open)
Elevators
03/17/2025
Violation issued (ECB, open)
Elevators
02/25/2025
Violation issued (HPD, closed)
B
02/25/2025
Violation issued (HPD, closed)
B
01/30/2025
Violation issued (HPD, closed)
B
01/30/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
A
01/30/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
B
01/30/2025
Violation issued (HPD, closed)
B
01/25/2025
Violation issued (HPD, closed)
B
12/20/2024
Violation issued (HPD, closed)
B
12/20/2024
Violation issued (HPD, closed)
C
12/20/2024
Violation issued (HPD, closed)
C
12/18/2024
Violation issued (HPD, closed)
B
12/18/2024
Violation issued (HPD, closed)
B
12/18/2024
Violation issued (HPD, closed)
C
12/18/2024
Violation issued (HPD, closed)
B
12/18/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, open)
C
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, closed)
B
12/02/2024
Violation issued (HPD, closed)
C
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGALAXY GENERAL CONTRACTIO12/14/2023
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL06/21/2022
DOB NOWAntennaPermit IssuedRAMAPO COMMUNICATION CORP05/09/2022
DOB NOWGeneral ConstructionSigned-offGALAXY GENERAL CONTRACTIO03/17/2022
DOB NOWSupported ScaffoldPermit IssuedPOWERS BRIDGING & SCAFFOL07/01/2021
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL06/18/2021
BISOTISSUEDRAMAPO COMMUNICATION CORP09/13/2018
BISOTISSUEDCERTIFIED CONTRACTING INC.03/27/2014
BISEQISSUEDCOLGATE ENTERPRISE CORP03/24/2014
BISOTISSUEDCERTIFIED CONTRACTING INC.02/26/2014
BISEQISSUEDCOLGATE ENTERPRISE CORP02/24/2014
BISOTISSUEDCERTIFIED CONTRACTING INC.01/08/2014
BISPLISSUEDALAN E. ROSENBERG, INC.02/07/2011
BISPLISSUEDALAN E. ROSENBERG, INC.08/14/2009
BISFBISSUEDG BAUER INC08/10/2009
BISOTISSUEDCHARTER COMMUNICATIONS INC05/06/2005
1 project · most recent 06/22/2021
FiledStatusContractorScope
06/22/2021CompleteOPTIMAL ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/21/2022MasonryELISHA GEIGERspecial
02/21/2022Structural Stability – Alterations of existing buildingsELISHA GEIGERspecial
02/21/2022Energy Code Compliance InspectionsELISHA GEIGERprogress
02/21/2022FinalELISHA GEIGERprogress
02/21/2022Fenestration and door U-factor and product ratingsELISHA GEIGERenergy_progress
02/21/2022Air barrier - visual inspectionELISHA GEIGERenergy_progress
02/21/2022Fenestration areasELISHA GEIGERenergy_progress
02/21/2022Fenestration air leakageELISHA GEIGERenergy_progress
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/01/2026B00537082-I1Request digital key ↗
08/31/2026B00638090-P1Request digital key ↗
08/31/2026B00638090-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/01/2026B00418594-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION10
09/14/2018321120434Open ↗
07/05/2014340121111Open ↗
06/12/2014320722811Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
06/12/2018321120434Open ↗
05/06/2015321120434Open ↗
02/21/2014340121111Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/20/2018321120434Open ↗
09/14/2018321120434Open ↗
07/10/2018340121111Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00418594-I1Open ↗
09/01/2026B00537082-I1Open ↗
08/29/2026B00537078-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/22/2026B00638090-P1Open ↗
08/22/2026B00638090-P1Open ↗
08/22/2026B00638090-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/28/2013320869869Open ↗
07/29/2009320044082Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/21/2014340121111Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/21/2014340121111Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/29/2009320044082Open ↗
▸BISProfessional and Owner Certification (POC3)1
12/28/2013320869869Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/21/2014340121111Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00638090-P1Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
03/08/2011320044082Open ↗
02/22/2011320044082Open ↗
▸BISSCHEDULE B - PLUMBING1
07/29/2009320044082Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/29/2009320044082Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/29/2018321120434Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00418594-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00418594-I1Open ↗
08/13/2026B00638090-I1Open ↗
08/13/2026B00638090-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/29/2009320044082Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/21/2013320722811Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/20/2018321120434Open ↗
09/14/2018321120434Open ↗
02/03/2015320722811Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/20/2018321120434Open ↗
02/03/2015320722811Open ↗
01/27/2014320869869Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/21/2014340121111Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00638090-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/21/2014340121111Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/28/2013320869869Open ↗
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
02/22/2011320044082Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/20/2018321120434Open ↗
07/10/2018340121111Open ↗
02/20/2015320722811Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/06/2015321120434Open ↗
12/28/2013320869869Open ↗
02/21/2013320722811Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/12/2018321120434Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/20/2018321120434Open ↗
05/06/2015321120434Open ↗
02/03/2015320722811Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
05/06/2015321120434Open ↗
12/28/2013320869869Open ↗
02/21/2013320722811Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
11/20/2018321120434Open ↗
07/10/2018340121111Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/21/2014340121111Open ↗
▸BISADDITIONAL INFORMATION1
08/25/2014340121111Open ↗