← Back
Two family frame
740 LINCOLN PLACE
BROOKLYN · Crown Heights (North) · BIN 3032617
💬 Discuss this project
1910Year Built
3Stories
B2Building Class
R6BZoning
3,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 1,800 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
USA DEVELOPMENT LLC2303/22/2026
STELLAR INDUSTRIES103/22/2026
382 EAST 91 LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES711/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor603/21/2026
TOP DOG PLBG & HTG CORPPlumbing207/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8065411/15/2021
LAM &CO CONSULTING LLC DB2159310/27/2021
Building Lifecycle
All (44)Filed (7)Permit Issued (4)Signed Off (2)Violation (1)Special Inspection (30)
12/13/2021
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00450316-I1
12/13/2021
Signed off — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00459112-I1
12/11/2021
Permit issued — General Construction
B00450316-I1-MS
11/17/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
11/17/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
11/17/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
11/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
11/15/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00459112-P3
11/08/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
11/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
11/08/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
11/08/2021
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
11/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
10/27/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00450316-P2
10/27/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00459112-P2
10/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
10/07/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
10/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
10/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
10/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
05/27/2021
Permit issued — Plumbing
B00459112-I1-PL
05/17/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00459112-P1
05/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
05/14/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
05/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
05/14/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
05/14/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
04/13/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00450316-P1
03/29/2021
Special inspection requirement — Fenestration areas
RONNY LAM
03/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
03/29/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RONNY LAM
03/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
03/29/2021
Special inspection requirement — Fenestration air leakage
RONNY LAM
03/29/2021
Special inspection requirement — Final
JAN PEREZ
03/29/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
03/29/2021
Special inspection requirement — Mechanical Systems
RONNY LAM
03/29/2021
Special inspection requirement — Heating Systems
RONNY LAM
03/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
02/18/2021
Violation issued (ECB, closed)
Construction
02/11/2021
Permit issued — Plumbing
B00459112-I1-PL
02/08/2021
Permit issued — General Construction
B00450316-I1-GC
01/25/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00450316-I1
01/25/2021
Filed — Alteration
EXISTING TWO STORY. CELLAR TO 2ND FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00459112-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTELLAR INDUSTRIES INC12/11/2021
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP05/27/2021
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP02/11/2021
DOB NOWGeneral ConstructionSigned-offSTELLAR INDUSTRIES INC02/08/2021
BISOTISSUEDBROOKLYN SOLARWORKS LLC05/12/2023
2 projects · most recent 06/15/2023
FiledStatusContractorScope
06/15/2023CompleteBROOKYLN SOLARWORKS, LLC—
02/18/2021CompletePOWER SURGE ELECTRIC, INC3 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
11/17/2021HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
11/17/2021HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
11/17/2021HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
11/17/2021Energy Code Compliance InspectionsCHI WAI CHUNGprogress
11/17/2021Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
11/08/2021HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
11/08/2021HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
11/08/2021HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
11/08/2021Energy Code Compliance InspectionsCHI WAI CHUNGprogress
11/08/2021Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
10/07/2021Fire-Resistant Penetrations and JointsRONNY LAMspecial
10/07/2021Energy Code Compliance InspectionsRONNY LAMprogress
10/07/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
10/07/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
10/07/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
05/14/2021Fire-Resistant Penetrations and JointsRONNY LAMspecial
05/14/2021Energy Code Compliance InspectionsRONNY LAMprogress
05/14/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
05/14/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
05/14/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
03/29/2021Fenestration areasRONNY LAMenergy_progress
03/29/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
03/29/2021Fenestration and door U-factor and product ratingsRONNY LAMenergy_progress
03/29/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
03/29/2021Fenestration air leakageRONNY LAMenergy_progress
Latest 25 of 35.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Plumbing4
08/31/2026B00459112-I1Request digital key ↗
08/15/2026B00459112-P2Request digital key ↗
08/15/2026B00459112-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/31/2026B00450316-P1Request digital key ↗
08/31/2026B00450316-I1Request digital key ↗
08/31/2026B00450316-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/31/2026B00450316-I1Request digital key ↗
08/31/2026B00450316-P1Request digital key ↗
08/15/2026B00450316-P2Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/01/2023340887231Open ↗
▸BISWORK PERMIT APPLICATION1
05/12/2023340887231Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature28
09/01/2026B00459112-I1Open ↗
09/01/2026B00459112-I1Open ↗
09/01/2026B00459112-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00450316-I1Open ↗
08/13/2026B00459112-I1Open ↗
08/13/2026B00450316-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00459112-I1Open ↗
08/27/2026B00459112-P1Open ↗
08/25/2026B00459112-P3Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/01/2023340887231Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/01/2023340887231Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
05/12/2023340887231Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00459112-P3Open ↗
08/13/2026B00450316-P1Open ↗
08/13/2026B00450316-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/01/2023340887231Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/24/2023340887231Open ↗
05/01/2023340887231Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00459112-I1Open ↗
08/13/2026B00450316-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/01/2023340887231Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/24/2023340887231Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
07/25/2023340887231Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/01/2023340887231Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/24/2023340887231Open ↗
05/01/2023340887231Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/25/2023340887231Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/25/2023340887231Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/24/2023340887231Open ↗
05/01/2023340887231Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
05/12/2023340887231Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2023340887231Open ↗