7401 13 AVENUE
BROOKLYN · BIN 3329028
💬 Discuss this project
1928Year Built
2Stories
K7Building Class
R6BZoning
12,480 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Banking facility, with or without parking · Owner of record: 7401 13TH AVE REALTY LLC · 5,200 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof6p · 2 filings · 20 docs
Floor 345p · 2 filings · 20 docs
Floor 255p · 2 filings · 20 docs
Floor 151p · 2 filings · 20 docs
Cellar58p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER'S REP1407/08/2026
HAMILTON FEDERAL SAVINGS503/22/2026
CAPITAL ONE BANK603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/24/2022$2.9M—CAPITAL ONE, NATIONAL ASSOCIATION → 7401 13TH AVE REALTY LLC$228/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP3403/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADASS INCGeneral Contractor1707/08/2026
GWT ENTERPRISES INCGeneral Contractor1007/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor603/21/2026
JODOM MECHANICAL, INCPlumbing307/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA17951511/28/2025
Building Lifecycle
All (154)Filed (18)Permit Issued (21)Signed Off (7)Violation (25)Inspection (8)Objection (45)Special Inspection (30)
01/15/2026
Signed off — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-S2
12/19/2025
Signed off — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-S5
12/16/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
12/16/2025
Special inspection requirement — Post-installed Anchors
MICHAEL KARANTINIDIS, P.E.
12/04/2025
Objection raised — Scope
12/04/2025
Objection resolved — Addressed
11/28/2025
Filed — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-P8
11/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/24/2025
Permit issued — Sprinklers
B08003682-S5-EW-SP
09/19/2025
Filed — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-S5
09/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
09/12/2025
Special inspection requirement — Post-installed Anchors
MICHAEL KARANTINIDIS, P.E.
09/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
09/12/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
09/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
08/19/2025
Signed off — Alteration
Filing for Mechanical modification to Cellar, 01, 02, 03, and roof floors at 7401 13th Avenue. No change in use, egress and or occupancy.
B08046403-I1
07/22/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00915817-I1
06/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2025
Signed off — Alteration
temp. construction fence
B00830390-I1
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/06/2025
Objection raised — Cost
06/06/2025
Objection resolved — Addressed
05/29/2025
Filed — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-P6
04/24/2025
Filed — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-P7
04/21/2025
Special inspection requirement — Air barrier - visual inspection
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Insulation placement and R values
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Fenestration areas
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Fenestration air leakage
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Masonry
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Post-installed Anchors
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL KARANTINIDIS, P.E.
04/21/2025
Special inspection requirement — Preliminary
MICHAEL KARANTINIDIS, P.E.
02/11/2025
Permit issued — Plumbing
B08003682-S2-PL
01/13/2025
Permit issued — Construction Fence
B00830390-I1-FN
01/06/2025
Filed — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-P5
01/06/2025
Special inspection requirement — Post-installed Anchors
MICHAEL KARANTINIDIS, P.E.
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
01/06/2025
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
01/02/2025
Permit issued — Sidewalk Shed
B00915817-I1-SH
01/02/2025
Permit issued — Supported Scaffold
B00915817-I1-SF
12/19/2024
Filed — Alteration
Filing for Mechanical modification to Cellar, 01, 02, 03, and roof floors at 7401 13th Avenue. No change in use, egress and or occupancy.
B08046403-P1
12/04/2024
Permit issued — General Construction
B08003682-I1-GC
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2024
Signed off — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-S3
07/26/2024
Signed off — Alteration CO
Sprinkler filing in conjunction with Alt-CO #B08003682
B08003682-S4
06/25/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP10/24/2025
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC02/11/2025
DOB NOWConstruction FenceSigned-offADASS01/13/2025
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/02/2025
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC01/02/2025
DOB NOWGeneral ConstructionPermit IssuedADASS12/04/2024
DOB NOWMechanical SystemsSigned-offADASS04/11/2024
DOB NOWStructuralSigned-offADASS03/21/2024
DOB NOWConstruction FenceSigned-offADASS02/07/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/08/2024
DOB NOWGeneral ConstructionPermit IssuedADASS12/11/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES12/06/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES12/06/2023
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC10/24/2023
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC05/11/2023
DOB NOWMechanical SystemsSigned-offADASS04/20/2023
DOB NOWStructuralSigned-offADASS04/19/2023
DOB NOWEarth WorkSigned-offADASS04/19/2023
DOB NOWGeneral ConstructionPermit IssuedADASS03/16/2023
DOB NOWConstruction FenceSigned-offADASS03/08/2023
BISBLISSUEDL&J PLG & HTG CO OF NY IN02/01/2018
BISBLISSUEDL&J PLG & HTG CO OF NY IN11/09/2016
BISBLISSUEDL&J PLG & HTG CO OF NY IN08/26/2015
BISMHISSUEDINTEGRATED HVAC SYS & SVC01/05/2015
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/04/2008
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/04/2008
BIS—ISSUEDAMERICAN SIGN & ELECL CON06/15/1998
BISPLISSUEDMICHAEL GANGI P&H CONTRAC01/17/1995
BISOTISSUEDFRANK CORIGLIANO CONTR INC03/23/1994
BISEQISSUEDFRANK CORIGLIANO CONTR INC03/23/1994
BISOTISSUEDBERGEN FUEL OIL CO.01/15/1993
1 project · most recent 11/28/2025
Sprinkler System
FiledStatusContractorScope
11/28/2025Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
1 project · most recent 11/28/2025
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
11/28/2025Signed-offJODOM MECHANICAL, INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
3 projects · most recent 04/04/2025
General Wiring
FiledStatusContractorScope
04/04/2025CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
10/09/2024Permit IssuedENERCHARGE ELECTRIC CONTGeneral Wiring
08/08/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 11/28/2025
Steel Masonry
FiledStatusContractorScope
11/28/2025Signed-offSAFETY FIRE SPRINKLER CORSteel, Masonry
1 project · most recent 11/28/2025
Earthwork
FiledStatusContractorScope
11/28/2025Signed-offSAFETY FIRE SPRINKLER COREarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
12/16/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
12/16/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
12/16/2025HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
12/16/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
12/16/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
12/16/2025Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
12/16/2025Post-installed AnchorsMICHAEL KARANTINIDIS, P.E.special
09/12/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
09/12/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
09/12/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
09/12/2025HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
09/12/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
09/12/2025Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
09/12/2025Post-installed AnchorsMICHAEL KARANTINIDIS, P.E.special
04/21/2025Exterior Insulation and Finish Systems (EIFS)MICHAEL KARANTINIDIS, P.E.special
04/21/2025Air barrier - visual inspectionMICHAEL KARANTINIDIS, P.E.energy_progress
04/21/2025Insulation placement and R valuesMICHAEL KARANTINIDIS, P.E.energy_progress
04/21/2025Fenestration air leakageMICHAEL KARANTINIDIS, P.E.energy_progress
04/21/2025Fenestration areasMICHAEL KARANTINIDIS, P.E.energy_progress
04/21/2025Fenestration and door U-factor and product ratingsMICHAEL KARANTINIDIS, P.E.energy_progress
04/21/2025PreliminaryMICHAEL KARANTINIDIS, P.E.progress
04/21/2025Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
04/21/2025Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
04/21/2025Structural Stability – Alterations of existing buildingsMICHAEL KARANTINIDIS, P.E.special
04/21/2025Post-installed AnchorsMICHAEL KARANTINIDIS, P.E.special
Latest 25 of 119.
▾Documents — 277 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/27/2026B08046403-I1Request digital key ↗
08/27/2026B08046403-P1Request digital key ↗
08/26/2026B00915817-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
02/28/2023340881184Open ↗
02/10/2023340203513Open ↗
12/31/2014340203513Open ↗
▸BISWORK PERMIT APPLICATION3
11/10/2016340203513Open ↗
08/26/2015340203513Open ↗
12/31/2014340203513Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/20/2023340881184Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram7
08/21/2026B08003682-P3Open ↗
08/21/2026B08003682-I1Open ↗
08/14/2026B08003682-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/21/2026B08003682-P3Open ↗
08/21/2026B08003682-I1Open ↗
08/14/2026B08003682-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026B08003682-I1Open ↗
▸Seals & Professional Certifications139
▸DOB NOWProgress Inspector Seal & Signature72
09/26/2026B08003682-P4Open ↗
09/26/2026B08003682-P4Open ↗
09/26/2026B08003682-P4Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
09/26/2026B08003682-P4Open ↗
09/26/2026B08003682-P4Open ↗
09/26/2026B08003682-P4Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026B08046403-I1Open ↗
08/27/2026B08046403-P1Open ↗
08/27/2026B00830390-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/31/2014340203513Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/28/2023340881184Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/31/2014340203513Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/31/2014340203513Open ↗
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE PERMITS7
02/17/2023340203513Open ↗
02/17/2023340203513Open ↗
02/17/2023340203513Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
02/17/2023340203513Open ↗
02/17/2023340203513Open ↗
12/21/2022340203513Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/21/2022340203513Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/21/2022340203513Open ↗
▸BISHEATING SYSTEMS1
12/21/2022340203513Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/31/2014340203513Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist7
08/21/2026B08003682-P7Open ↗
08/21/2026B08003682-P5Open ↗
08/21/2026B08003682-P4Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/28/2023340881184Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/28/2023340881184Open ↗
▸BISSTREET TREE CHECKLIST1
02/28/2023340881184Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/21/2026B08003682-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026B08003682-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/27/2026B08046403-P1Open ↗
08/27/2026B08046403-I1Open ↗
08/21/2026B08003682-S5Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/28/2023340881184Open ↗
03/01/2023340881184Open ↗
12/31/2014340203513Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/21/2022340203513Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/31/2014340203513Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/31/2014340203513Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/31/2014340203513Open ↗
▸BISMECHANICAL SYSTEMS1
12/21/2022340203513Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/09/2023340203513Open ↗
▸BISFINAL1
12/21/2022340203513Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
12/21/2022340203513Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/03/2023340203513Open ↗
12/31/2014340203513Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/21/2022340203513Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
01/06/2026340881184Open ↗
04/20/2023340881184Open ↗
03/28/2023340881184Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/28/2023340881184Open ↗
12/31/2014340203513Open ↗
▸Other Documents31
▸DOB NOWSite Survey: Initial7
08/21/2026B08003682-P3Open ↗
08/21/2026B08003682-I1Open ↗
08/14/2026B08003682-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/21/2026B08003682-P3Open ↗
08/21/2026B08003682-I1Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWPlot Diagram7
08/21/2026B08003682-P3Open ↗
08/21/2026B08003682-I1Open ↗
08/14/2026B08003682-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/21/2026B08003682-P7Open ↗
08/21/2026B08003682-P5Open ↗
08/21/2026B08003682-P4Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/20/2023340881184Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
08/21/2026B08003682-I1Open ↗