← Back
Single or multiple dwelling with stores or offices
7402 13 AVENUE
BROOKLYN · BIN 3159382
💬 Discuss this project
1927Year Built
4Stories
S9Building Class
R6BZoning
6,100 sfGross Floor Area
8Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 7402 13TH AVENUE, L.L.C. · 2,000 sf lot · 3.05 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction1p · 1 filing · 4 docs
Floor 2
Floor 11p · 1 filing · 3 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OLYMPIC PROPERTY MANAGEMENT507/19/2026
PM CONSTRUCTION USA707/08/2026
TOPLINE NYC CONTRACTING403/22/2026
7402 13TH AVENUE1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS203/21/2026
R H DRUMMOND EXP203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
ADRIAN WYSOCKI103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
TOPLINE NYC INCGeneral Contractor303/21/2026
GDC CONTRACTING LLCGeneral Contractor203/21/2026
NYC MAPLE GROUP INCGeneral Contractor107/19/2026
PM CONSTRUCTION USA CORPGeneral Contractor107/08/2026
FEDERICO PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416112/02/2025
JANHA BUILDING IDEAS INC6129111/03/2023
GREYSTONE ENGINEERING CON2973112/05/2022
Building Lifecycle
All (79)Filed (5)Permit Issued (6)Signed Off (4)Violation (50)Inspection (1)Objection (4)Special Inspection (9)
07/17/2026
Permit issued — General Construction
B01315443-I1-GC
12/02/2025
Filed — Alteration
Formally filing a GC application for APT. 3R to remove and replace the existing acoustic ceiling, including its supporting grid, with a new suspended gypsum board (GWB) ceiling.
B01315443-I1
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
09/22/2025
Violation issued (HPD, closed)
B
08/26/2025
Violation issued (HPD, open)
A
08/26/2025
Violation issued (HPD, open)
A
08/26/2025
Violation issued (HPD, open)
A
08/26/2025
Violation issued (HPD, open)
A
08/26/2025
Violation issued (HPD, open)
C
08/26/2025
Violation issued (HPD, open)
A
08/24/2025
Violation issued (HPD, closed)
B
08/24/2025
Violation issued (HPD, closed)
C
08/24/2025
Violation issued (HPD, open)
C
08/24/2025
Violation issued (HPD, open)
A
08/24/2025
Violation issued (HPD, closed)
B
08/19/2025
Violation issued (HPD, closed)
B
08/19/2025
Violation issued (HPD, closed)
B
08/19/2025
Violation issued (HPD, closed)
B
10/11/2024
Violation issued (HPD, closed)
B
09/23/2024
Signed off — Alteration
Facade repair work at the east, north, and south elevations as per plan.
B00955940-I1
09/06/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/05/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00943081-I1
01/10/2024
Violation issued (ECB, closed)
Unknown
01/10/2024
Violation issued (ECB, closed)
Cranes and Derricks
01/10/2024
Violation issued (ECB, closed)
Construction
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
B
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
A
12/15/2023
Permit issued — Sidewalk Shed
B00943081-I1-SH
11/22/2023
Permit issued — General Construction
B00955940-I1-GC
11/14/2023
Objection resolved — Addressed
11/11/2023
Objection resolved — Addressed
11/09/2023
Objection raised — Cost
11/09/2023
Objection raised — Scope
11/03/2023
Filed — Alteration
Facade repair work at the east, north, and south elevations as per plan.
B00955940-I1
10/31/2023
Special inspection requirement — Masonry
KAMRUZ ZAMAN
10/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUZ ZAMAN
10/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUZ ZAMAN
10/05/2023
Permit issued — Sidewalk Shed
B00943081-I1-SH
10/04/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00943081-I1
07/05/2023
Signed off — Alteration
Reinforce exist. 3x6 wood joists with Sister Joists. & Add new Wood parrallam beam & lolly columns with footings to reinforce /support exist. joists. Repair framing, floor & finishes in 1st floor store bathroom. No change in use or egress.
B08036098-I1
01/05/2023
Permit issued — General Construction
B08036098-I1-GC
12/05/2022
Filed — Alteration
Reinforce exist. 3x6 wood joists with Sister Joists. & Add new Wood parrallam beam & lolly columns with footings to reinforce /support exist. joists. Repair framing, floor & finishes in 1st floor store bathroom. No change in use or egress.
B08036098-I1
12/01/2022
Special inspection requirement — Tenant Protection Plan Compliance
TIMOTHY TWEEDY
11/10/2022
Violation issued (HPD, closed)
I
11/10/2022
Special inspection requirement — Fire-Resistance Rated Construction
TIMOTHY TWEEDY
11/10/2022
Special inspection requirement — Final
TIMOTHY TWEEDY
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
TIMOTHY TWEEDY
11/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
04/05/2022
Violation issued (HPD, closed)
B
04/05/2022
Violation issued (HPD, closed)
C
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYC MAPLE GROUP INC07/17/2026
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC12/15/2023
DOB NOWGeneral ConstructionSigned-offPM CONSTRUCTION USA CORP11/22/2023
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING10/05/2023
DOB NOWGeneral ConstructionSigned-offGDC CONTRACTING01/05/2023
DOB NOWPlumbingSigned-offFEDERICO PLUMBING LLC10/31/2020
BISOTISSUEDGINO IRON WORKS CORP09/06/2017
BISEQISSUEDGINO IRON WORKS CORP09/06/2017
BISPLISSUEDFIREBALL PIPING & HTG CORP11/16/2015
BISEQISSUEDGINO IRON WORKS,CORP10/26/2015
BISMHISSUEDGINO IRON WORKS,CORP10/26/2015
BISOTISSUEDTELCOM ENGINEERING GP INC02/25/2013
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/18/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN02/16/2012
BISOTISSUEDSQUAN CONSTRUCTION SERVIC07/08/2010
BISOTISSUEDDAVRIAL ENTERPRISES INC09/10/2003
BISEQISSUEDSPRING SCAFFOLDING06/12/2002
5 projects · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024Permit IssuedENERCHARGE ELECTRIC CONTGeneral Wiring
10/06/2023CompleteRICHARD NEU—
08/30/2021CompleteRIVIERA ELECTRIC CORPGeneral Wiring
09/11/2019CompleteMACK ELECTRICAL INCGeneral Wiring
07/30/2019CompleteINARA ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/06/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/01/2025Tenant Protection Plan ComplianceELIAS RASABIspecial
10/31/2023MasonryKAMRUZ ZAMANspecial
10/31/2023Structural Stability – Alterations of existing buildingsKAMRUZ ZAMANspecial
10/31/2023Tenant Protection Plan ComplianceKAMRUZ ZAMANspecial
12/01/2022Tenant Protection Plan ComplianceTIMOTHY TWEEDYspecial
11/10/2022Fire-Resistance Rated ConstructionTIMOTHY TWEEDYprogress
11/10/2022FinalTIMOTHY TWEEDYprogress
11/10/2022Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
11/10/2022Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/28/2026B08036098-I1Request digital key ↗
08/26/2026B00943081-I1Request digital key ↗
08/26/2026B00955940-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00333499-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION11
09/14/2017321260835Open ↗
09/14/2017321260835Open ↗
09/14/2017321260835Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
10/28/2015321260835Open ↗
01/31/2013320170471Open ↗
12/27/2012320170471Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
10/28/2015321260835Open ↗
10/28/2015321260835Open ↗
10/28/2015321260835Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01315443-I1Open ↗
09/01/2026B00955940-I1Open ↗
09/01/2026B00955940-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00955940-I1Open ↗
08/13/2026B01315443-I1Open ↗
08/13/2026B00943081-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B08036098-I1Open ↗
08/27/2026B08036098-I1Open ↗
08/27/2026B08036098-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/28/2015321260835Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/28/2015321260835Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/28/2015321260835Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00333499-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00955940-I1Open ↗
08/13/2026B01315443-I1Open ↗
08/13/2026B08036098-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/13/2012320428872Open ↗
06/17/2010320170471Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/28/2015321260835Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/28/2015321260835Open ↗
10/28/2015321260835Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/13/2012320428872Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/05/2014320428872Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/05/2014320428872Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
10/28/2015321260835Open ↗
02/13/2012320428872Open ↗
06/17/2010320170471Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
05/05/2014320428872Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/05/2013320170471Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/28/2015321260835Open ↗
05/05/2014320428872Open ↗
03/05/2013320170471Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
10/28/2015321260835Open ↗
▸BISADDITIONAL INFORMATION1
04/25/2017321260835Open ↗