← Back
Three families
741 HOLLYWOOD AVENUE
BRONX · BIN 2076966
💬 Discuss this project
1985Year Built
3Stories
C0Building Class
R4Zoning
3,355 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,595 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
741 HOLLYWOOD AVE807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/03/2021$955K—741 HOLLYWOOD AVENUE, LLC → Private party$285/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT212/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GINO O LONGO ARCHITECT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VITELLO SEWER W.M H&P SERPlumbing207/08/2026
Building Lifecycle
All (20)Filed (2)Permit Issued (2)Signed Off (1)Violation (5)Special Inspection (10)
11/03/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
01/07/2021
Signed off — Alteration
Cap & remove existing water heater. Installation of (3) new instantaneous automatic water heaters in existing boiler room at basement of the existing 3-story, 3-family dwelling. No change in use, egress, occupancy, or bulk.
X00252516-I1
12/16/2020
Special inspection requirement — Energy Code Compliance Inspections
GINO LONGO
12/16/2020
Special inspection requirement — HVAC and service water heating equipment
GINO LONGO
12/16/2020
Special inspection requirement — Maintenance information
GINO LONGO
12/16/2020
Special inspection requirement — HVAC insulation and sealing
GINO LONGO
12/16/2020
Special inspection requirement — HVAC and service water heating system controls
GINO LONGO
12/11/2020
Filed — Alteration
Cap & remove existing water heater. Installation of (3) new instantaneous automatic water heaters in existing boiler room at basement of the existing 3-story, 3-family dwelling. No change in use, egress, occupancy, or bulk.
X00252516-P1
12/10/2020
Special inspection requirement — Energy Code Compliance Inspections
GINO LONGO
12/10/2020
Special inspection requirement — Maintenance information
GINO LONGO
12/10/2020
Special inspection requirement — HVAC insulation and sealing
GINO LONGO
12/10/2020
Special inspection requirement — HVAC and service water heating system controls
GINO LONGO
12/10/2020
Special inspection requirement — HVAC and service water heating equipment
GINO LONGO
12/08/2020
Permit issued — Plumbing
X00252516-I1-PL
11/29/2020
Violation issued (HPD, closed)
C
11/29/2020
Violation issued (HPD, closed)
C
03/09/2020
Permit issued — Plumbing
X00252516-I1-PL
10/28/2019
Filed — Alteration
Cap & remove existing water heater. Installation of (3) new instantaneous automatic water heaters in existing boiler room at basement of the existing 3-story, 3-family dwelling. No change in use, egress, occupancy, or bulk.
X00252516-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVITELLO SEWER W.M H&P SER12/08/2020
DOB NOWPlumbingSigned-offVITELLO SEWER W.M H&P SER03/09/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/16/2020Energy Code Compliance InspectionsGINO LONGOprogress
12/16/2020HVAC and service water heating equipment GINO LONGOenergy_progress
12/16/2020Maintenance informationGINO LONGOenergy_progress
12/16/2020HVAC insulation and sealing GINO LONGOenergy_progress
12/16/2020HVAC and service water heating system controls GINO LONGOenergy_progress
12/10/2020Energy Code Compliance InspectionsGINO LONGOprogress
12/10/2020Maintenance informationGINO LONGOenergy_progress
12/10/2020HVAC insulation and sealing GINO LONGOenergy_progress
12/10/2020HVAC and service water heating system controls GINO LONGOenergy_progress
12/10/2020HVAC and service water heating equipment GINO LONGOenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026X00252516-I1Request digital key ↗
08/15/2026X00252516-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature10
08/30/2026X00252516-I1Open ↗
08/30/2026X00252516-I1Open ↗
08/30/2026X00252516-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00252516-I1Open ↗
08/25/2026X00252516-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026X00252516-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00252516-I1Open ↗