ECB01/23/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER VIO #111825PI30302HZ AND CONTROL #348365 DATED 11/18/2025. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH CODE.$25K due
DOB11/18/2025FTC W/COMMISSIONER'S ORDER CONTROL#348326 VIO#101625PI30301SB DATED 10/16/25 REQUIRING OWNER TO PROVIDE A CORRECTION ACTION PLAN BY 10/30/25 AND AS OF TODAY'S DATE 11/18/25 THE REQ'D DOCUMENTS-CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER AND SUBMIT ALL DOCUMENT TO PROACTIVEINSP@BUILDINGS.NYC.GOV
DOB10/16/2025CORRECTIVE ACTION PLAN REQ'D(14 DAY CAP)OBSVD @ EXP1 MASONRY/STUCCO CRACKS BY MAIN ENTRANCE @ EXP1/2 CORNER, THE FIRE ESCAPE ON 3FL IS MISSING THE TOP STEP. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & DETERMINE THE STRUCT STAB & SUBMIT A CORRECTIVE ACTION PLAN BY 10/30/25, BLDG TO BE REPRD UNDER PERMIT START 12/16/25
ECB10/18/2017WORK WITHOUT A PERMIT.NOTED:INSTALLED ILLUMINATED BUSINESS SIGN @ EXP#1 APPROX 18'X'15 READS "SECURED".EVIDENCE ATTACHED.REM:OBTAIN ALL THE REQUIRED PERMITS.Nothing owed — awaiting certificate of correction
ECB08/07/2017WORK W/O PERMIT. NOTIED SIGN ON FRONT OF BLDG ON MYRTLE AVE INSTALLED W/O PERMIT. REMEDY: OBTAIN ALL REQUIRED PERMITS.Nothing owed — awaiting certificate of correction
ECB06/30/2017WORK WITHOUT A PERMIT.NOTE:A LUMINATED SIGN INSTALLED"SECURED"AT BUSINESS ENTRANCE APPROX.20FT FROM ONE CURB 18" HIGH AND 15FT WIDTH.REM:OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction