← Back
Two family converted from one family
741 PRESIDENT STREET
BROOKLYN · Park Slope · BIN 3020217
💬 Discuss this project
1899Year Built
3Stories
B3Building Class
R6BZoning
3,260 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,296 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Floor 13p · 1 filing · 2 docs
Site & exterior2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.206/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
Building Lifecycle
All (8)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Special Inspection (1)
11/09/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00541193-I1
11/09/2021
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00541197-I1
08/03/2021
Violation issued (ECB, closed)
Construction
06/21/2021
Permit issued — Supported Scaffold
B00541197-I1-SF
06/21/2021
Permit issued — Sidewalk Shed
B00541193-I1-SH
06/18/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00541193-I1
06/18/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00541197-I1
06/16/2021
Special inspection requirement — Final
RAFI HAMID
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING06/21/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING06/21/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/16/2021FinalRAFI HAMIDprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00541197-I1Request digital key ↗
09/01/2026B00541193-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00541197-I1Open ↗
09/01/2026B00541193-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00541197-I1Open ↗