← Back
Single or multiple dwelling with stores or offices
7415 3 AVENUE
BROOKLYN · BIN 3148249
💬 Discuss this project
1920Year Built
3Stories
S9Building Class
R6BZoning
—Gross Floor Area
6Units
109 Open Violations 107 unresolved · 2 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 7415 3 AVE LLC · 2.18 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MVC HEATING CORP.503/22/2026
7415 3 AVE LLC203/22/2026
7415 REALTY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VERSATILE ENGINEERING, P.C.111/02/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC DEVELOPMENT AND CGeneral Contractor303/21/2026
Building Lifecycle
All (75)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Objection (12)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2024
Violation issued (HPD, closed)
A
08/29/2023
Signed off — Alteration
IN ORDER TO RESULVE VIOLATION # 34776218M, PERFORM THE FOLLOWING:INSTALL TWO NONE-BEARING INTERIOR PARTITIONS, AS INDICATED AND REMOVESTALL SHOWER FROM THE EXISTING BATHROOM.
B08018521-I1
04/26/2023
Permit issued — General Construction
B08018521-I1-GC
11/28/2022
Objection raised — Other
11/28/2022
Objection resolved — Addressed
11/28/2022
Objection raised — Other
11/28/2022
Objection resolved — Addressed
11/14/2022
Objection raised — Other
11/14/2022
Objection resolved — Addressed
11/07/2022
Violation issued (HPD, closed)
I
11/03/2022
Objection raised — Structural
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection raised — Fire_Protection
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection raised — Accessibility
11/03/2022
Objection resolved — Addressed
11/02/2022
Filed — Alteration
IN ORDER TO RESULVE VIOLATION # 34776218M, PERFORM THE FOLLOWING:INSTALL TWO NONE-BEARING INTERIOR PARTITIONS, AS INDICATED AND REMOVESTALL SHOWER FROM THE EXISTING BATHROOM.
B08018521-I1
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
03/17/2019
Violation issued (ECB, closed)
Construction
07/03/2018
Violation issued (HPD, open)
B
07/03/2018
Violation issued (HPD, open)
B
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, closed)
C
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
B
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
B
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
B
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
A
07/03/2018
Violation issued (HPD, open)
B
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/05/2015
Violation issued (HPD, closed)
I
06/22/2011
Violation issued (HPD, open)
B
06/22/2011
Violation issued (HPD, open)
B
06/22/2011
Violation issued (HPD, open)
A
06/22/2011
Violation issued (HPD, open)
A
06/22/2011
Violation issued (HPD, open)
B
06/22/2011
Violation issued (HPD, open)
B
04/20/2011
Violation issued (HPD, closed)
B
04/20/2011
Violation issued (HPD, open)
B
04/20/2011
Violation issued (HPD, closed)
B
04/20/2011
Violation issued (HPD, open)
A
04/23/2010
Violation issued (HPD, closed)
B
04/23/2010
Violation issued (HPD, open)
A
04/23/2010
Violation issued (HPD, open)
B
04/23/2010
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDYNAMIC DEVELOPMENT AND C04/26/2023
BISFBISSUEDBAERENKLAU CO INC.03/06/1991
2 projects · most recent 03/29/2019
General Wiring
FiledStatusContractorScope
03/29/2019CompleteTMF ELEC'L CONTR. INC.—
03/22/2019Permit IssuedPETER J. CATANZARO, INC.General Wiring
Nothing on file for this building.
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B08018521-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B08018521-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B08018521-I1Open ↗