← Back
BuildNYC
Church, synagogue, chapel
7415 FT HAMILTON PARKWAY
BROOKLYN · Dyker Heights · BIN 3148471
💬 Discuss this project
1952Year Built
2Stories
M1Building Class
R5BZoning
30,192 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 1 likely answered ▸FDNY Report ↗
Church, synagogue, chapel · 23,448 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHVAC equipment replacementUnder Construction4p · 2 filings · 8 docs
Floor 1HVAC equipment replacementUnder Construction6p · 2 filings · 8 docs
CellarBoiler and burner replacement5p · 3 filings · 17 docs
Site & exteriorChurch of St. EphremUnder Construction7p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset908/29/2026
St Ephrems RC Church303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Permanent Engineering106/22/2026
Gregory V. Perotto, P.E411/28/2023
Andrew Robert Levenbaum P.E108/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Group803/21/2026
Design 2147203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Chase Landscape ConstructionGeneral Contractor603/21/2026
Guaranteed Home ImprovemeGeneral Contractor107/08/2026
Scaran Oil ServiceGeneral Contractor106/27/2026
King's Plaza Plumbing & Heating IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Reliance Engineering322106/22/2026
Gregory V. Perotto, P.E947411/28/2023
C.M. Testing Laboratory1352108/04/2023
Building Lifecycle
All (68)Filed (6)Permit Issued (6)Signed Off (4)Violation (38)Inspection (4)Special Inspection (10)
06/25/2026
Permit issued — Mechanical Systems
B01419432-I1-MS
06/22/2026
Filed — Alteration
DIRECT REPLACEMENT OF 2 SPLIT SYSTEM AC UNITS LOCATED IN 1ST FLOOR SPACE OF EXISTING CHURCH SPACE. REPLACEMENT OF 2 CONDENSING UNITS AT ROOF.
B01419432-I1
06/20/2026
Special inspection requirement — Preliminary
Ralph Giorgio
06/18/2026
Special inspection requirement — Mechanical Systems
Ralph Giorgio
06/18/2026
Special inspection requirement — Final
Ralph Giorgio
05/29/2025
Violation issued (FDNY_ORDER, closed)
05/29/2025
Violation issued (FDNY_ORDER, closed)
05/29/2025
Violation issued (FDNY_ORDER, closed)
05/29/2025
Violation issued (FDNY_ORDER, closed)
05/29/2025
Violation issued (FDNY_ORDER, closed)
05/29/2025
Violation issued (FDNY_ORDER, closed)
05/29/2025
Violation issued (FDNY_ORDER, closed)
03/27/2025
Signed off — Alteration
FILING HEREWITH ACCESSABILTY RAMP AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00899738-I1
09/03/2024
Permit issued — General Construction
B00899738-I1-GC-CX
08/12/2024
Signed off — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BOILER/BURNER. BOILER/BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00926296-I1
08/05/2024
Signed off — Alteration
REPLACE BOILER AND BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00925731-I1
11/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2023
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BOILER/BURNER. BOILER/BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00926296-P1
11/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
11/22/2023
Signed off — Alteration
INSTALL STAINLESS STEEL CHIMNEY LINER IN EXISTING CHIMNEY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00932991-I1
11/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/25/2023
Permit issued — General Construction
B00932991-I1-GC
09/25/2023
Permit issued — Boiler Equipment
B00925731-I1-BE
09/22/2023
Permit issued — Plumbing
B00926296-I1-PL
09/20/2023
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BOILER/BURNER. BOILER/BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00926296-I1
09/20/2023
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00925731-I1
09/20/2023
Filed — Alteration
INSTALL STAINLESS STEEL CHIMNEY LINER IN EXISTING CHIMNEY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00932991-I1
09/06/2023
Permit issued — Foundation
B00899738-I1-GC-CX
08/30/2023
Special inspection requirement — Maintenance information
Gregory Perotto
08/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
08/30/2023
Special inspection requirement — Heating Systems
Gregory Perotto
08/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
08/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
08/04/2023
Filed — Alteration
FILING HEREWITH ACCESSABILTY RAMP AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00899738-I1
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2018
Violation issued (ECB, closed)
Construction
06/28/2016
Violation issued (ECB, closed)
Boilers
06/28/2016
Violation issued (ECB, closed)
Construction
06/28/2016
Violation issued (ECB, closed)
Construction
06/28/2016
Violation issued (ECB, closed)
Boilers
01/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
04/24/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/01/2009
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
11/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/14/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/17/2005
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/21/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
01/13/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/08/1996
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
04/17/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedScaran Oil Service06/25/2026
DOB NOWGeneral ConstructionSigned-offChase Landscape Construction09/03/2024
DOB NOWGeneral ConstructionSigned-offGuaranteed Home Improveme09/25/2023
DOB NOWBoiler EquipmentSigned-offS.J. Fuel Co09/25/2023
DOB NOWPlumbingSigned-offKing's Plaza Plumbing & Heating I09/22/2023
DOB NOWFoundationSigned-offChase Landscape Construction09/06/2023
BISFSISSUEDStatewide Oil & Heating Co04/20/2006
1 project · most recent 06/22/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Permit IssuedScaran Oil ServiceAir Conditioning Systems
Cooling
Mitsubishi Electric MITSUBISHI MODEL #PUZ-AK36NL TWO UNITS 36,000 BTU · Condensing Unit ×2
MITSUBISHI MODEL #PKA-AK36NL 36,000 BTU · Vrf Indoor ×2
2 projects · most recent 02/26/2026
General Wiring
FiledStatusContractorScope
02/26/2026Permit IssuedA & S ElectricGeneral Wiring
03/10/2020Permit IssuedStar Electrical Contractors—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/20/2026PreliminaryRalph Giorgioprogress
06/18/2026Mechanical SystemsRalph Giorgiospecial
06/18/2026FinalRalph Giorgioprogress
11/26/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
08/30/2023Maintenance informationGregory Perottoenergy_progress
08/30/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
08/30/2023HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
08/30/2023Heating SystemsGregory Perottospecial
08/30/2023HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/30/2023HVAC-R and service water heating system controlsGregory Perottoenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Church of St. EphremReligious—
Project B00899738 Alteration · LOC Issued · 08/04/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00899738-I1Request digital key ↗
08/26/2026B00925731-I1Request digital key ↗
08/26/2026B00926296-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00899738-I1Open ↗
08/26/2026B00926296-P1Open ↗
08/26/2026B00926296-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B00925731-I1Open ↗
09/23/2026B00925731-I1Open ↗
09/23/2026B00925731-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00925731-I1Open ↗
09/23/2026B00925731-I1Open ↗
08/28/2026B01419432-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026B00926296-I1Open ↗
08/26/2026B00932991-I1Open ↗
08/13/2026B00925731-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00899738-I1Open ↗
08/16/2026B01419432-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/26/2026B00926296-P1Open ↗
08/26/2026B00926296-I1Open ↗
08/26/2026B00932991-I1Open ↗
Showing 3 of 6 on file for this type