← Back
Primarily 2 family with 1 store or office
7418 NEW UTRECHT AVENUE
BROOKLYN · Bensonhurst · BIN 3159561
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R5Zoning
2,456 sfGross Floor Area
3Units
Rent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: CENG & ZHENG REALTY CORP. · 1,565 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 211p · 2 filings · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar11p · 3 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
Filed — no permit issued1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENG ZHENG REALTY2207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI210/09/2024
HPL ENGINEERING P.C.305/26/2022
WKS INC.305/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1203/21/2026
ECDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ST SAFETY CONS. INCGeneral Contractor603/22/2026
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
FRAN (FENG) HUANGElectrical103/21/2026
KJK ELECTRIC INC 003451General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613305/26/2022
WKS INC.4521305/26/2021
Building Lifecycle
All (105)Filed (8)Permit Issued (5)Signed Off (3)Violation (60)Inspection (2)Objection (11)Special Inspection (16)
06/26/2025
Violation issued (ECB, open)
Boilers
05/20/2025
Signed off — Alteration
REMOVE ECB VIOLATION: 39096086M; INSTALL NEW AWNING WITH CANVAS COVER AT STORE FRONT READING "BKY WINDOWS DOORS & GLASS INC" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01124810-I1
05/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/01/2025
Permit issued — General Construction
B01124810-I1-GC
12/03/2024
Violation issued (HPD, closed)
I
10/09/2024
Filed — Alteration
REMOVE ECB VIOLATION: 39096086M; INSTALL NEW AWNING WITH CANVAS COVER AT STORE FRONT READING "BKY WINDOWS DOORS & GLASS INC" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01124810-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2023
Violation issued (HPD, closed)
I
10/16/2023
Objection raised — Other
10/12/2023
Filed — Alteration
INSTALL NEW AWNING WITH CANVAS COVER AT STOREFRONT READING "BKY WINDOWS DOORS & GLASS INC"
B00944749-I1
09/29/2023
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2022
Violation issued (HPD, closed)
I
05/31/2022
Special inspection requirement — Interior lighting power
Fran Huang
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
05/31/2022
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
05/31/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
05/31/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
05/31/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
05/31/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
05/31/2022
Special inspection requirement — Fenestration areas
Fran Huang
05/26/2022
Filed — Alteration CO
FILE THIS APPLICATION TO CONVERT EXISTING FACTORY TO BE COMMERCIAL SPACE (O.C.: M, U.G.: 6A). RENOVATION & REPLACE STOREFRONT AS PER PLAN SUBMITTED. REQUEST NEW CERTIFICATE OF OCCUPANCY.
B00478529-P2
03/29/2022
Objection resolved — Addressed
03/16/2022
Violation issued (HPD, closed)
I
01/15/2022
Objection raised — Structural
01/11/2022
Filed — Alteration CO
FILE THIS APPLICATION TO CONVERT EXISTING FACTORY TO BE COMMERCIAL SPACE (O.C.: M, U.G.: 6A). RENOVATION & REPLACE STOREFRONT AS PER PLAN SUBMITTED. REQUEST NEW CERTIFICATE OF OCCUPANCY.
B00478529-P1
09/27/2021
Signed off — Alteration
B00431481-I1
08/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/24/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/24/2021
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
08/24/2021
Special inspection requirement — Fenestration areas
Fran Huang
08/24/2021
Special inspection requirement — Interior lighting power
Fran Huang
08/24/2021
Special inspection requirement — Air barrier - visual inspection
Fran Huang
08/24/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
08/24/2021
Special inspection requirement — Fenestration air leakage
Fran Huang
08/04/2021
Signed off — Alteration
PROPOSED PL WORK TO INSTALL 1 NEW GAS METER, NEW HWH AT CEL FOR 1ST FL, NEW BOILER & HWH AT CEL FOR 2ND FL 2 FAMILY. REPLACE KITCHENETTE & BATHROOM ON 2ND FL. CAP& REMOVE EXIST. BOILER & HW HEATER AT CEL. BL WORK FILED UNDER DOBNow #B00431481.
B00425221-I1
07/26/2021
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/18/2021
Permit issued — Plumbing
B00425221-I1-PL
06/11/2021
Permit issued — General Construction
B00478529-I1-GC
05/26/2021
Filed — Alteration
PROPOSED PL WORK TO INSTALL 1 NEW GAS METER, NEW HWH AT CEL FOR 1ST FL, NEW BOILER & HWH AT CEL FOR 2ND FL 2 FAMILY. REPLACE KITCHENETTE & BATHROOM ON 2ND FL. CAP& REMOVE EXIST. BOILER & HW HEATER AT CEL. BL WORK FILED UNDER DOBNow #B00431481.
B00425221-P1
03/19/2021
Permit issued — Boiler Equipment
B00431481-I1-BE
03/18/2021
Permit issued — Plumbing
B00425221-I1-PL
03/08/2021
Filed — Alteration CO
FILE THIS APPLICATION TO CONVERT EXISTING FACTORY TO BE COMMERCIAL SPACE (O.C.: M, U.G.: 6A). RENOVATION & REPLACE STOREFRONT AS PER PLAN SUBMITTED. REQUEST NEW CERTIFICATE OF OCCUPANCY.
B00478529-I1
01/29/2021
Objection raised — Scope
01/29/2021
Objection resolved — Addressed
01/29/2021
Objection raised — Mechanical
01/29/2021
Objection resolved — Addressed
01/29/2021
Objection raised — Admin
01/29/2021
Objection resolved — Addressed
01/22/2021
Objection raised — Other
01/22/2021
Objection resolved — Addressed
01/20/2021
Filed — Alteration
B00431481-I1
01/20/2021
Filed — Alteration
PROPOSED PL WORK TO INSTALL 1 NEW GAS METER, NEW HWH AT CEL FOR 1ST FL, NEW BOILER & HWH AT CEL FOR 2ND FL 2 FAMILY. REPLACE KITCHENETTE & BATHROOM ON 2ND FL. CAP& REMOVE EXIST. BOILER & HW HEATER AT CEL. BL WORK FILED UNDER DOBNow #B00431481.
B00425221-I1
11/28/2019
Violation issued (HPD, open)
B
11/28/2019
Violation issued (HPD, open)
B
11/28/2019
Violation issued (HPD, closed)
C
11/28/2019
Violation issued (HPD, closed)
C
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/01/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC06/18/2021
DOB NOWGeneral ConstructionPermit IssuedST SAFETY CONS. INC06/11/2021
DOB NOWBoiler EquipmentSigned-offDW PLUMBING INC03/19/2021
DOB NOWPlumbingSigned-offDW PLUMBING INC03/18/2021
BISOTISSUEDWING JAY CONSTRUCTION INC03/10/2021
BISOTISSUEDGREAT WILL CONST INC06/07/2005
1 project · most recent 03/16/2021
General Wiring
FiledStatusContractorScope
03/16/2021CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 05/26/2022
FiledStatusContractorScope
05/26/2022Permit IssuedST SAFETY CONS. INC1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/26/2021Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/31/2022Interior lighting powerFran Huangenergy_progress
05/31/2022Fire-Resistant Penetrations and JointsFran Huangspecial
05/31/2022Fire-Resistance Rated ConstructionFran Huangprogress
05/31/2022Energy Code Compliance InspectionsFran Huangprogress
05/31/2022Air barrier - visual inspectionFran Huangenergy_progress
05/31/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
05/31/2022Fenestration air leakageFran Huangenergy_progress
05/31/2022Fenestration areasFran Huangenergy_progress
08/24/2021Fire-Resistant Penetrations and JointsFran Huangspecial
08/24/2021Energy Code Compliance InspectionsFran Huangprogress
08/24/2021Fire-Resistance Rated ConstructionFran Huangprogress
08/24/2021Fenestration areasFran Huangenergy_progress
08/24/2021Interior lighting powerFran Huangenergy_progress
08/24/2021Air barrier - visual inspectionFran Huangenergy_progress
08/24/2021Fenestration and door U-factor and product ratingsFran Huangenergy_progress
08/24/2021Fenestration air leakageFran Huangenergy_progress
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/29/2026B00478529-P2Request digital key ↗
08/29/2026B00478529-P3Request digital key ↗
08/29/2026B00478529-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00425221-P1Request digital key ↗
08/15/2026B00425221-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00431481-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
09/15/2021301964998Open ↗
07/22/2021340784538Open ↗
11/10/2020340784538Open ↗
▸BISWORK PERMIT APPLICATION1
03/10/2021340784538Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00478529-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
08/25/2026B00478529-I1Open ↗
08/25/2026B00478529-I1Open ↗
08/25/2026B00478529-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00431481-I1Open ↗
09/01/2026B00425221-I1Open ↗
09/01/2026B00425221-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00478529-I1Open ↗
08/23/2026B00478529-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/10/2020340784538Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/10/2020340784538Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026B00478529-P2Open ↗
08/13/2026B00478529-P1Open ↗
08/13/2026B00478529-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00478529-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00478529-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00478529-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00431481-I1Open ↗
09/01/2026B00425221-P1Open ↗
08/15/2026B00425221-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/10/2020340784538Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026B00425221-I1Open ↗
08/13/2026B00431481-I1Open ↗
08/13/2026B00478529-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/05/2021340784538Open ↗
11/10/2020340784538Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/05/2021340784538Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/10/2020340784538Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/05/2021340784538Open ↗
11/10/2020340784538Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2021340784538Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/05/2021340784538Open ↗
11/23/2020340784538Open ↗
11/10/2020340784538Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
08/03/2021340784538Open ↗
07/27/2021340784538Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/10/2020340784538Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026B00478529-I1Open ↗