← Back
Primarily 4 family with 1 store or office
7419 3 AVENUE
BROOKLYN · BIN 3148247
💬 Discuss this project
1920Year Built
3Stories
S4Building Class
R6BZoning
3,650 sfGross Floor Area
5Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: A A PARTNERS LLC · 1,600 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AA PARTNERS LLC1207/08/2026
AA HOLDINGS1707/08/2026
BOHLER ENGINEERING407/08/2026
88 FUJSAN RESTAURANT103/22/2026
STARBUCKS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHAABAN ENGINEERING, LLC205/23/2023
NEW YORK DESIGN ARCHITECTS, LLP502/08/2023
EMTEC CONSULTANTS210/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOHLER ENGINEERING203/21/2026
NATIONAL MAINTENANCE403/21/2026
NEW YORK DESIGN ARCHITECTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN JERSEY IMPROVEGeneral Contractor707/08/2026
PHILIP GOEHRINGElectrical403/21/2026
NATIONAL MAINTENANCEScaffold207/08/2026
KABACK ENTERPRISES INCGeneral Contractor107/08/2026
SCHUMACHER & FARLEY P&H CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957602/08/2023
ETI CONSULTANTS LLC7694210/08/2021
Building Lifecycle
All (66)Filed (9)Permit Issued (7)Signed Off (6)Violation (13)Inspection (3)Special Inspection (28)
09/26/2023
Signed off — Alteration
APPLICATION IS FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL 1 NEW GREASE TRAP, NEW WASTE LINE PIPING AND WATER SUPPLY LINES AS NECESSARY.
B00802301-I1
09/26/2023
Signed off — Alteration
APPLICATION IS FILED FOR ALTERATION OF EXISTING RETAIL SPACE INCLUDING NEW EXTERIOR STOREFRONT, EXTERIOR FINISHES, NON LOAD BEARING PARTITIONS, FINISHES, LIGHTING AND ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00802272-I1
09/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/12/2023
Signed off — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE FOR THE INSTALLATION OF THE STOREFRONT. STOREFRONT WORK FILED UNDER SEPARATE APPLICATION.
B00802244-I1
05/30/2023
Signed off — Alteration
B00877528-I1
05/30/2023
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877497-I1
05/25/2023
Permit issued — Sign
B00877497-I1-SG
05/24/2023
Permit issued — Sign
B00877528-I1-SG
05/23/2023
Filed — Alteration
B00877528-I1
05/23/2023
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877497-I1
04/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/09/2023
Permit issued — Plumbing
B00802301-I1-PL
02/14/2023
Permit issued — General Construction
B00802272-I1-GC
02/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Final
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Exterior lighting power
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Fenestration air leakage
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Lighting controls
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
02/09/2023
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
02/08/2023
Filed — Alteration
APPLICATION IS FILED FOR ALTERATION OF EXISTING RETAIL SPACE INCLUDING NEW EXTERIOR STOREFRONT, EXTERIOR FINISHES, NON LOAD BEARING PARTITIONS, FINISHES, LIGHTING AND ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00802272-P1
02/08/2023
Filed — Alteration
APPLICATION IS FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL 1 NEW GREASE TRAP, NEW WASTE LINE PIPING AND WATER SUPPLY LINES AS NECESSARY.
B00802301-P1
02/07/2023
Permit issued — General Construction
B00802272-I1-GC
02/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Fenestration air leakage
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Lighting controls
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Final
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Exterior lighting power
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Giuseppe Anzalone
02/07/2023
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
02/03/2023
Permit issued — Construction Fence
B00802244-I1-FN
02/02/2023
Filed — Alteration
APPLICATION IS FILED FOR AN INTERIOR RENOVATION OF AN EXISTING RETAIL SPACE TO INSTALL 1 NEW GREASE TRAP, NEW WASTE LINE PIPING AND WATER SUPPLY LINES AS NECESSARY.
B00802301-I1
02/01/2023
Filed — Alteration
APPLICATION IS FILED FOR ALTERATION OF EXISTING RETAIL SPACE INCLUDING NEW EXTERIOR STOREFRONT, EXTERIOR FINISHES, NON LOAD BEARING PARTITIONS, FINISHES, LIGHTING AND ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00802272-I1
02/01/2023
Filed — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE FOR THE INSTALLATION OF THE STOREFRONT. STOREFRONT WORK FILED UNDER SEPARATE APPLICATION.
B00802244-I1
10/14/2021
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS/DUCTING/PIPING
B00470508-I1
10/08/2021
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS/DUCTING/PIPING
B00470508-P1
10/07/2021
Special inspection requirement — Mechanical Systems
ANTHONY MUSUMECI
10/07/2021
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY MUSUMECI
10/07/2021
Special inspection requirement — Final
ANTHONY MUSUMECI
10/07/2021
Special inspection requirement — Maintenance information
ANTHONY MUSUMECI
06/22/2021
Permit issued — Mechanical Systems
B00470508-I1-MS
05/25/2021
Filed — Alteration
INSTALLATION OF NEW MECHANICAL SYSTEMS/DUCTING/PIPING
B00470508-I1
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC05/25/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC05/24/2023
DOB NOWPlumbingSigned-offSCHUMACHER & FARLEY P&H C03/09/2023
DOB NOWGeneral ConstructionSigned-offAMERICAN JERSEY IMPROVE02/14/2023
DOB NOWGeneral ConstructionSigned-offAMERICAN JERSEY IMPROVE02/07/2023
DOB NOWConstruction FenceSigned-offAMERICAN JERSEY IMPROVE02/03/2023
DOB NOWMechanical SystemsSigned-offKABACK ENTERPRISES06/22/2021
BIS—ISSUEDPARKER SERVICE INDUSTRIES10/24/2003
BIS—ISSUEDPARKER SERVICE INDUSTRIES10/24/2003
BISPLISSUEDACCURATE MECHANICAL INC08/13/2003
BISOTISSUEDFULL SERVICE CONTRACTING07/28/2003
BISPLISSUEDK & BH PLUMBING & HTG INC10/25/2002
BIS—ISSUEDTAK LI CONST INC10/23/2002
BISEQISSUEDTAK LI CONSTRUCTION INC09/06/2002
BISOTISSUEDTAK LI CONSTRUCTION INC.08/19/2002
BISOTISSUEDNYC CORP BUILDERS INC09/30/1998
BISEQISSUEDNEW YORK CITY CORP09/30/1998
1 project · most recent 03/15/2023
General Wiring
FiledStatusContractorScope
03/15/2023Permit IssuedLEBO ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/09/2023Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
02/09/2023Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/09/2023Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
02/09/2023Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
02/09/2023FinalGiuseppe Anzaloneprogress
02/09/2023Air barrier - visual inspectionGiuseppe Anzaloneenergy_progress
02/09/2023Exterior lighting powerGiuseppe Anzaloneenergy_progress
02/09/2023Fenestration air leakageGiuseppe Anzaloneenergy_progress
02/09/2023Lighting controlsGiuseppe Anzaloneenergy_progress
02/09/2023Fenestration and door U-factor and product ratingsGiuseppe Anzaloneenergy_progress
02/09/2023Interior lighting powerGiuseppe Anzaloneenergy_progress
02/09/2023Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
02/07/2023Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
02/07/2023Fenestration air leakageGiuseppe Anzaloneenergy_progress
02/07/2023Interior lighting powerGiuseppe Anzaloneenergy_progress
02/07/2023Lighting controlsGiuseppe Anzaloneenergy_progress
02/07/2023Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
02/07/2023Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/07/2023Tenant Protection Plan ComplianceGiuseppe Anzalonespecial
02/07/2023Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
02/07/2023FinalGiuseppe Anzaloneprogress
02/07/2023Exterior lighting powerGiuseppe Anzaloneenergy_progress
02/07/2023Fenestration and door U-factor and product ratingsGiuseppe Anzaloneenergy_progress
02/07/2023Air barrier - visual inspectionGiuseppe Anzaloneenergy_progress
10/07/2021Mechanical SystemsANTHONY MUSUMECIspecial
Latest 25 of 28.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/27/2026B00802244-I1Request digital key ↗
08/27/2026B00802272-P1Request digital key ↗
08/27/2026B00802272-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00470508-P1Request digital key ↗
09/01/2026B00470508-I1Request digital key ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00470508-P1Open ↗
09/01/2026B00470508-I1Open ↗
08/27/2026B00802272-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/24/2026B00802272-I1Open ↗
09/24/2026B00802272-I1Open ↗
09/23/2026B00470508-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/24/2026B00802272-I1Open ↗
09/24/2026B00802272-I1Open ↗
09/23/2026B00470508-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00470508-P1Open ↗
09/01/2026B00470508-I1Open ↗
08/27/2026B00802272-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00470508-I1Open ↗