← Back
BuildNYC
Two family converted from one family
742 DECATUR STREET
BROOKLYN · Ocean Hill · BIN 3040711
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6Zoning
2,364 sfGross Floor Area
2Units
8 Active Violations ▸FDNY Report ↗
Two family converted from one family · 1,800 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 215p · 2 filings · 14 docs
Floor 110p · 1 filing · 11 docs
Cellar10p · 1 filing · 11 docs
Sub-Basement10p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2017$1.1M—Private party → Private party$455/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
None305/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Akay ElectricElectrical103/22/2026
Empower CESGeneral Contractor103/21/2026
Hertler Nadile P & HPlumbing107/08/2026
Urban MechanicalPlumbing107/08/2026
Building Lifecycle
01/14/2026
Signed off — Alteration
Adding double vanity, shower, and toilet. Relocating existing washer dryer and toilet. Existing lavatory and tub to remain. All on the same floor and same area.
B01219024-I1
07/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2025
Permit issued — Plumbing
B01219024-I1-PL
28 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offUrban Mechanical06/12/2025
DOB NOWPlumbingSigned-offHertler Nadile P & H06/01/2021
BISOTISSUEDEmpower CES03/31/2021
3 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025Permit IssuedElectric A/CGeneral Wiring
07/07/2022CompleteAkay ElectricGeneral Wiring
05/21/2021CompleteIsland Electric—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/28/2022Energy Code Compliance InspectionsSteve Lemboprogress
03/28/2022HVAC-R and service water piping design and insulationSteve Lemboenergy_progress
03/24/2022Energy Code Compliance InspectionsSteve Lemboprogress
03/24/2022HVAC-R and service water piping design and insulationSteve Lemboenergy_progress
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account