← Back
Two family converted from one family
742 DECATUR STREET
BROOKLYN · Ocean Hill · BIN 3040711
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6Zoning
2,364 sfGross Floor Area
2Units
8 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,800 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 215p · 2 filings · 14 docs
Floor 110p · 1 filing · 11 docs
Cellar10p · 1 filing · 11 docs
Sub-Basement10p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2017$1.1M—— → —$455/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NONE305/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKAY ELECTRIC CORPORATIONElectrical103/22/2026
HERTLER NADILE P & H, INCPlumbing107/08/2026
URBAN MECHANICAL CORPPlumbing107/08/2026
Building Lifecycle
All (28)Filed (3)Permit Issued (2)Signed Off (2)Violation (9)Inspection (8)Special Inspection (4)
01/14/2026
Signed off — Alteration
Adding double vanity, shower, and toilet. Relocating existing washer dryer and toilet. Existing lavatory and tub to remain. All on the same floor and same area.
B01219024-I1
07/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2025
Permit issued — Plumbing
B01219024-I1-PL
05/08/2025
Filed — Alteration
Adding double vanity, shower, and toilet. Relocating existing washer dryer and toilet. Existing lavatory and tub to remain. All on the same floor and same area.
B01219024-I1
04/04/2022
Signed off — Alteration
Renovating cellar, basement, 1st and 2nd floor . Relocating kitchen sink, range, bath sink, toilet on the first floor, adding new washer on 2nd floor, adding new pot filler and refrigerator on 1st floor. New gas piping downstream of meter.
B00470232-I1
03/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Steve Lembo
03/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steve Lembo
03/25/2022
Filed — Alteration
Renovating cellar, basement, 1st and 2nd floor . Relocating kitchen sink, range, bath sink, toilet on the first floor, adding new washer on 2nd floor, adding new pot filler and refrigerator on 1st floor. New gas piping downstream of meter.
B00470232-P3
03/24/2022
Special inspection requirement — Energy Code Compliance Inspections
Steve Lembo
03/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steve Lembo
03/18/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/27/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2021
Permit issued — Plumbing
B00470232-I1-PL
03/15/2021
Filed — Alteration
Renovating cellar, basement, 1st and 2nd floor . Relocating kitchen sink, range, bath sink, toilet on the first floor, adding new washer on 2nd floor, adding new pot filler and refrigerator on 1st floor. New gas piping downstream of meter.
B00470232-I1
05/01/2017
Violation issued (HPD, open)
C
05/01/2017
Violation issued (HPD, open)
B
01/30/2016
Violation issued (HPD, closed)
B
01/30/2016
Violation issued (HPD, open)
B
01/30/2016
Violation issued (HPD, open)
B
09/14/2006
Violation issued (HPD, open)
I
08/24/2006
Violation issued (HPD, open)
B
08/24/2006
Violation issued (HPD, open)
A
08/24/2006
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offURBAN MECHANICAL CORP06/12/2025
DOB NOWPlumbingSigned-offHERTLER NADILE P & H, INC06/01/2021
BISOTISSUEDEMPOWER CES LLC03/31/2021
3 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025Permit IssuedELECTRIC A/C INCGeneral Wiring
07/07/2022CompleteAKAY ELECTRIC CORPORATIONGeneral Wiring
05/21/2021CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/28/2022Energy Code Compliance InspectionsSteve Lemboprogress
03/28/2022HVAC-R and service water piping design and insulationSteve Lemboenergy_progress
03/24/2022Energy Code Compliance InspectionsSteve Lemboprogress
03/24/2022HVAC-R and service water piping design and insulationSteve Lemboenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00470232-I1Request digital key ↗
08/15/2026B00470232-P3Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026B01219024-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/23/2021340805695Open ↗
▸BISWORK PERMIT APPLICATION1
03/31/2021340805695Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00470232-P3Open ↗
09/01/2026B00470232-P3Open ↗
08/31/2026B00470232-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01219024-I1Open ↗
08/13/2026B00470232-I1Open ↗
08/13/2026B00470232-P3Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/23/2021340805695Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
05/18/2021340805695Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01219024-I1Open ↗
08/13/2026B00470232-I1Open ↗
08/13/2026B00470232-P3Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/23/2021340805695Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/15/2022340805695Open ↗
02/23/2021340805695Open ↗
02/23/2021340805695Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/15/2022340805695Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/23/2021340805695Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
02/15/2022340805695Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00470232-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/15/2022340805695Open ↗
02/23/2021340805695Open ↗
02/23/2021340805695Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
02/16/2022340805695Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/16/2022340805695Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
02/23/2021340805695Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/15/2022340805695Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
03/29/2021340805695Open ↗
03/19/2021340805695Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/23/2021340805695Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
02/16/2022340805695Open ↗