743 MADISON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041108
💬 Discuss this project
1879Year Built
5Stories
S9Building Class
C5-1Zoning
4,845 sfGross Floor Area
5Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: 743 MADISON, LLC · 1,000 sf lot · 4.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 1 filing · 16 docs
Floor 54p · 1 filing · 17 docs
Floor 44p · 1 filing · 17 docs
Floor 31p · 1 filing · 16 docs
Floor 21p · 1 filing · 16 docs
Floor 11p · 1 filing · 16 docs
Cellar8p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
743 MADISON, LLC903/22/2026
WALLACK MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP503/21/2026
Rigid Structural Design, LLC603/21/2026
JP EXPEDITING+DRAFTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOVA CONSTRUCTION SERVICEGeneral Contractor707/08/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor706/27/2026
JAROSLAW KURACHElectrical103/21/2026
MERLO, DANIELElectrical103/21/2026
RUBIN GLICKElectrical103/21/2026
RZYMSKI, MACIEJElectrical103/21/2026
SEGNA, MARIOElectrical103/21/2026
JJ BROTHERS PAINTING CORPGeneral Contractor107/08/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
COGEN ELEC'L SERVICES,INCElectrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
CORDOVA, NElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422107/29/2026
ALAN MARGOLIN & ASSOC423403/23/2026
MICHAEL ZENREICH ARCHITEC1724208/12/2025
Building Lifecycle
All (76)Filed (15)Permit Issued (11)Signed Off (7)Violation (2)Inspection (4)Objection (8)Special Inspection (29)
07/29/2026
Filed — Alteration
PLUMBING WORK AS PART OF THE 4TH & 5TH FLOOR APARTMENT RENOVATIONS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.
M01211148-S2
05/12/2026
Special inspection requirement — Shutoff dampers
LAWRENCE GREEN
05/12/2026
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
05/12/2026
Special inspection requirement — Final
LAWRENCE GREEN
04/17/2026
Signed off — Alteration
PLumbing modificarions takign place in the cellar and 1st & 2nd floor as per plans filed herewith. no change in use egress or occupancy.
M01117848-I1
04/07/2026
Signed off — Alteration
General construction modifications taking place on the cellar, first and second floor as per plans filed herewith. No change in use, egress or occupancy
M01117836-I1
04/06/2026
Signed off — Alteration
M01157053-I1
03/26/2026
Signed off — Alteration
Structural modifications taking place on the cellar, 1-2nd floor as per plans filed herewith. No change in use, egress or occupancy a sper plans filed herewith.
M01133636-I1
03/23/2026
Filed — Alteration
Structural modifications taking place on the cellar, 1-2nd floor as per plans filed herewith. No change in use, egress or occupancy a sper plans filed herewith.
M01133636-P1
03/23/2026
Special inspection requirement — Wood – Seismic Resistance
Young Suh
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
03/23/2026
Special inspection requirement — Post-installed Anchors
Young Suh
03/23/2026
Special inspection requirement — Structural Wood Frame
Young Suh
03/23/2026
Special inspection requirement — Final
Young Suh
03/23/2026
Special inspection requirement — Structural Steel - Details
Young Suh
03/23/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
03/23/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Young Suh
01/14/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
01/14/2026
Special inspection requirement — Structural Steel - Details
Young Suh
12/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Special inspection requirement — Structural Wood Frame
Young Suh
12/08/2025
Special inspection requirement — Wood – Seismic Resistance
Young Suh
12/08/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Young Suh
12/08/2025
Special inspection requirement — Post-installed Anchors
Young Suh
12/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
12/08/2025
Special inspection requirement — Final
Young Suh
11/17/2025
Violation issued (HPD, closed)
I
08/26/2025
Filed — Alteration
PLUMBING WORK AS PART OF THE 4TH & 5TH FLOOR APARTMENT RENOVATIONS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.
M01211148-P1
08/12/2025
Filed — Alteration
Filing for installation of HVAC units at third floor and roof.
M01256794-P1
08/12/2025
Permit issued — Mechanical Systems
M01256794-I1-MS
08/12/2025
Special inspection requirement — Mechanical Systems
Michael Zenreich
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
08/12/2025
Special inspection requirement — Final
Michael Zenreich
08/08/2025
Special inspection requirement — Mechanical Systems
Michael Zenreich
08/08/2025
Special inspection requirement — Final
Michael Zenreich
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
08/07/2025
Filed — Alteration
Filing for installation of HVAC units at third floor and roof.
M01256794-I1
07/11/2025
Permit issued — General Construction
M01211148-I1-GC
07/07/2025
Permit issued — Plumbing
M01211148-S1-PL
06/17/2025
Objection raised — Accessibility
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection raised — Zoning
06/17/2025
Objection resolved — Addressed
06/05/2025
Signed off — Alteration
M01110124-I1
06/05/2025
Signed off — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01177569-I1
06/05/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01175988-I1
06/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/30/2025
Objection resolved — Addressed
05/28/2025
Filed — Alteration
PLUMBING WORK AS PART OF THE 4TH & 5TH FLOOR APARTMENT RENOVATIONS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.
M01211148-S1
05/21/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Cost
05/19/2025
Objection raised — Admin
05/08/2025
Filed — Alteration
PLUMBING WORK AS PART OF THE 4TH & 5TH FLOOR APARTMENT RENOVATIONS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.
M01211148-I1
04/16/2025
Special inspection requirement — Final
Peter Farinella
02/20/2025
Permit issued — Protection and Mechanical Methods
M01177569-I1-PMM
02/19/2025
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01177569-I1
02/07/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01175988-I1
02/07/2025
Permit issued — Supported Scaffold
M01175988-I1-SF
02/07/2025
Permit issued — General Construction
M01157053-I1-GC
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedVANGUARD CONSTRUCTION AND08/12/2025
DOB NOWGeneral ConstructionPermit IssuedJJ BROTHERS PAINTING07/11/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG07/07/2025
DOB NOWProtection and Mechanical MethodsSigned-offNOVA CONSTRUCTION SERVICE02/20/2025
DOB NOWSupported ScaffoldSigned-offNOVA CONSTRUCTION SERVICE02/07/2025
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND02/07/2025
DOB NOWStructuralSigned-offVANGUARD CONSTRUCTION AND11/22/2024
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND11/18/2024
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC11/15/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND10/23/2024
DOB NOWSidewalk ShedSigned-offNOVA CONSTRUCTION SERVICE10/11/2024
BISPLISSUEDGREGG NY PLUMBING, INC07/25/2012
BIS—ISSUEDSIGNS CAD CORP11/02/2011
BISMHISSUEDGEM AIR CONDITIONING INC10/28/2011
BISMHISSUEDTAAS CONSTRUCTION CORP IN07/18/2011
BISPLISSUEDGREGG NY PLUMBING, INC07/13/2011
BISEQISSUEDTAAS CONSTRUCTION CORP IN06/02/2011
BISOTISSUEDTAAS CONSTRUCTION CORP IN06/02/2011
BISOTISSUEDETNA CONTRACTING INC08/24/2006
BISOTISSUEDPOWER COOLING INC04/22/1999
BISOTISSUEDA.K.01/25/1996
BISEQISSUEDA.K.01/25/1996
BISEQISSUEDHORIZON CONTRACTORS OF L.I.04/23/1993
BISOTISSUEDHORIZON CONTRACTORS OF L.I.04/23/1993
1 project · most recent 08/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2025Permit IssuedVANGUARD CONSTRUCTION ANDHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ADUH12LUAS1 12,000 BTU · Condensing Unit ×4
AOU36RLXFZH 36,000 BTU · Fan Coil Indoor ×2
ASUH09LPAS 9,000 BTU · Condensing Unit ×2
1 project · most recent 07/29/2026
Water/Sanitary
FiledStatusContractorScope
07/29/2026Signed-offJOHN FITZGERALD PLBG &HTGWater/Sanitary
6 projects · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026CompleteBELMONT ELECTRICAL, INCGeneral Wiring
06/23/2025Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
10/30/2024CompleteTOP SHELF ELECTRIC CORP—
10/29/2024Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
10/24/2024CompleteCOGEN ELEC'L SERVICES,INC—
08/07/2019CompleteEPC ELECTRICAL CORP.—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/12/2026Shutoff dampersLAWRENCE GREENenergy_progress
05/12/2026Mechanical SystemsLAWRENCE GREENspecial
05/12/2026FinalLAWRENCE GREENprogress
03/23/2026Wood – Seismic ResistanceYoung Suhspecial
03/23/2026Structural Stability – Alterations of existing buildingsYoung Suhspecial
03/23/2026Post-installed AnchorsYoung Suhspecial
03/23/2026Structural Wood FrameYoung Suhprogress
03/23/2026FinalYoung Suhprogress
03/23/2026Structural Steel - DetailsYoung Suhspecial
03/23/2026Structural Steel - WeldingYoung Suhspecial
03/23/2026Construction Utilizing CLT or SCL, Type IVYoung Suhspecial
01/14/2026Structural Steel - WeldingYoung Suhspecial
01/14/2026Structural Steel - DetailsYoung Suhspecial
12/08/2025Structural Wood FrameYoung Suhprogress
12/08/2025Wood – Seismic ResistanceYoung Suhspecial
12/08/2025Construction Utilizing CLT or SCL, Type IVYoung Suhspecial
12/08/2025Post-installed AnchorsYoung Suhspecial
12/08/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
12/08/2025FinalYoung Suhprogress
08/12/2025Mechanical SystemsMichael Zenreichspecial
08/12/2025Fire-Resistant Penetrations and JointsMichael Zenreichspecial
08/12/2025FinalMichael Zenreichprogress
08/08/2025Mechanical SystemsMichael Zenreichspecial
08/08/2025FinalMichael Zenreichprogress
08/08/2025Fire-Resistant Penetrations and JointsMichael Zenreichspecial
Latest 25 of 29.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026M01110124-I1Request digital key ↗
08/26/2026M01117836-I1Request digital key ↗
08/25/2026M01117848-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION12
07/19/2012120697521Open ↗
04/24/2012120696942Open ↗
03/13/2012120869195Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLPC Approval/Permit10
08/25/2026M01133636-I1Open ↗
08/23/2026M01211148-S2Open ↗
08/13/2026M01122907-I1Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
07/31/2012120697521Open ↗
11/03/2011120836015Open ↗
10/31/2011120869195Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026M01110124-I1Open ↗
08/25/2026M01133636-I1Open ↗
08/23/2026M01211148-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
07/31/2012120676580Open ↗
05/25/2012120697521Open ↗
05/25/2012120697521Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026M01256794-I1Open ↗
09/23/2026M01256794-I1Open ↗
09/02/2026M01211148-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M01256794-I1Open ↗
09/02/2026M01211148-S2Open ↗
09/01/2026M01211148-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/24/2011120869195Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/24/2011120869195Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE PERMITS7
11/26/2012120697521Open ↗
03/16/2012120869195Open ↗
03/16/2012120869195Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
06/18/2013120697521Open ↗
10/25/2011120697521Open ↗
08/11/2011120697521Open ↗
▸BISSIGN HANGER CERTIFICATE1
10/03/2011120836015Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
03/16/2012120869195Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026M01133636-I1Open ↗
08/23/2026M01211148-S1Open ↗
08/23/2026M01211148-S2Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
10/24/2011120869195Open ↗
10/03/2011120836015Open ↗
05/04/2011120676580Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/31/2012120676580Open ↗
05/25/2012120697521Open ↗
05/25/2012120697521Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
03/30/2012120869195Open ↗
10/24/2011120869195Open ↗
05/04/2011120676580Open ↗
▸BISTR8: Energy Code Progress Inspections3
03/16/2012120869195Open ↗
07/11/2011120697521Open ↗
06/28/2011120697521Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
07/31/2012120676580Open ↗
05/25/2012120697521Open ↗
03/16/2012120869195Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLANDMARKS APPROVAL6
07/31/2012120676580Open ↗
05/25/2012120697521Open ↗
11/01/2011120836015Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/16/2013120697521Open ↗
02/01/2013120836015Open ↗
07/31/2012120676580Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/24/2011120869195Open ↗
10/03/2011120836015Open ↗
05/23/2011120697521Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
02/01/2013120836015Open ↗
07/31/2012120676580Open ↗
05/25/2012120697521Open ↗
Showing 3 of 11 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
10/31/2011120869195Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
10/24/2011120869195Open ↗
10/03/2011120836015Open ↗
05/20/2011120696942Open ↗
Showing 3 of 4 on file for this type
▸Other Documents9
▸DOB NOWProof of Historic Building6
08/13/2026M01256794-P1Open ↗
08/13/2026M01157053-I1Open ↗
08/13/2026M01256794-I1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/31/2012120676580Open ↗
05/25/2012120697521Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01133636-I1Open ↗