General warehouse
744 CLINTON STREET
BROOKLYN · BIN 3008887
💬 Discuss this project
1925Year Built
1Stories
E1Building Class
M3-1Zoning
—Gross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
General warehouse · 0.82 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Foundation and structural work for new wall opening1 filing · 5 docs
Filed — no permit issuedDink Court Pickleball17p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sunlight Clinton Realty803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Homone Engineering109/11/2026
Nathan Bright Architect108/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Accurate ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957109/11/2026
American Construction Tes9731109/11/2026
Building Lifecycle
All (31)Filed (2)Violation (2)Objection (16)Special Inspection (11)
10/06/2026
Objection raised — Other
10/06/2026
Objection raised — Other
10/06/2026
Objection raised — Other
09/11/2026
Filed — Alteration
FOUNDATION AND STRUCTURAL WORK ASSOCIATED WITH INSTALLATION OF NEW STEEL FRAMING TO CREATE NEW WALL OPENING.
B01454858-I1
09/09/2026
Special inspection requirement — Subgrade Inspections
09/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
09/02/2026
Special inspection requirement — Structural Steel - Details
Joseph Smerina
09/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Joseph Smerina
09/02/2026
Special inspection requirement — Masonry
Joseph Smerina
09/02/2026
Special inspection requirement — Post-installed Anchors
Joseph Smerina
09/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
EDWIN HOPKINS
09/02/2026
Special inspection requirement — Structural Steel - Welding
EDWIN HOPKINS
09/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/02/2026
Special inspection requirement — Final
09/02/2026
Special inspection requirement — Footing and Foundation
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Cost
08/25/2026
Objection raised — Other
08/04/2026
Filed — Alteration CO
Build out of UG6 Health and Fitness Establishment tenant on first floor.
B01436090-I1
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2017
Violation issued (FDNY_ORDER, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISSPISSUEDSafety Fire Sprinkler03/22/2007
BISSPISSUEDSafety Fire Sprinkler03/10/2006
1 project · most recent 08/27/2026
FiledStatusContractorScope
08/27/2026Permit IssuedPrime Electrical4 meters, 1 new_meters
1 project · most recent 09/11/2026
Steel
FiledStatusContractorScope
09/11/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/09/2026Subgrade Inspections—special
09/02/2026Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
09/02/2026Structural Steel - DetailsJoseph Smerinaspecial
09/02/2026Concrete - Cast-In-PlaceJoseph Smerinaspecial
09/02/2026MasonryJoseph Smerinaspecial
09/02/2026Post-installed AnchorsJoseph Smerinaspecial
09/02/2026Structural Steel - High Strength BoltingEDWIN HOPKINSspecial
09/02/2026Structural Steel - WeldingEDWIN HOPKINSspecial
09/02/2026Subsurface Investigations (Borings/Test Pits)—special
09/02/2026Final—progress
09/02/2026Footing and Foundation—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dink Court PickleballFitness / RecreationFloor 1
Project B01436090 Alteration CO · Objections · 08/04/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
10/07/2026B01454858-I1Request digital key ↗
08/16/2026B01436090-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/05/2013320809381Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
06/17/2014320809381Open ↗
06/09/2014320809381Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/07/2026B01454858-I1Open ↗
08/16/2026B01436090-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/08/2026B01454858-I1Open ↗
10/08/2026B01454858-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/05/2013320809381Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/05/2013320809381Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
10/07/2026B01454858-I1Open ↗
09/29/2026B01436090-I1Open ↗
▸Energy Compliance3
▸BISTR8: Energy Code Progress Inspections1
06/09/2014320809381Open ↗
▸BISEN2 - As Built Energy Analysis1
06/09/2014320809381Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/09/2014320809381Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
12/05/2013320809381Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
06/09/2014320809381Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/09/2014320809381Open ↗
12/05/2013320809381Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/05/2013320809381Open ↗