← Back
Miscellaneous store building
7440 AMBOY ROAD
STATEN ISLAND · BIN 5088112
💬 Discuss this project
1945Year Built
1.5Stories
K9Building Class
R3AZoning
2,205 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous store building · Owner of record: CAPE HOUSE GALLERY LTD · 9,344 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 22p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CARE HOUSE GALLERY,LTD103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN BUILD SI, INC.1106/05/2026
AVID DESIGNS, INC108/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING INC.2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z N J CONSTRUCTION INCGeneral Contractor307/08/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738103/13/2026
LAWRENCE MANDARINO ARCHIT724203/13/2026
DESIGN BUILD, SI, INC6114107/18/2024
LEE ENGINEERING, P.C.2157206/05/2024
AVID DESIGNS, INC.453108/18/2022
Building Lifecycle
All (89)Filed (12)Permit Issued (5)Signed Off (4)Violation (1)Inspection (8)Objection (29)Special Inspection (30)
08/11/2026
Signed off — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-I1
08/11/2026
Signed off — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-S1
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
06/05/2026
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P8
05/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/22/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/20/2026
Signed off — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-S2
04/20/2026
Signed off — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-S3
03/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Lawrence Mandarino
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
03/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Lawrence Mandarino
03/18/2026
Special inspection requirement — Fenestration areas
Lawrence Mandarino
03/18/2026
Special inspection requirement — Mechanical Systems
YEON LEE
03/18/2026
Special inspection requirement — Heating Systems
YEON LEE
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
03/18/2026
Special inspection requirement — Final
Lawrence Mandarino
03/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Lawrence Mandarino
03/18/2026
Special inspection requirement — Maintenance information
Lawrence Mandarino
03/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Lawrence Mandarino
03/18/2026
Special inspection requirement — Fenestration air leakage
Lawrence Mandarino
03/13/2026
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P4
03/13/2026
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P5
03/13/2026
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P6
03/06/2026
Special inspection requirement — Final
Lawrence Mandarino
03/06/2026
Special inspection requirement — Heating Systems
anthony santoro
03/06/2026
Special inspection requirement — Mechanical Systems
anthony santoro
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Lawrence Mandarino
03/06/2026
Special inspection requirement — Maintenance information
Lawrence Mandarino
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Lawrence Mandarino
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
02/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/26/2026
Permit issued — General Construction
S01039172-I1-GC
01/26/2026
Permit issued — Mechanical Systems
S01039172-S2-MS
10/14/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/07/2025
Permit issued — Boiler Equipment
S01039172-S3-BE
08/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/04/2025
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P3
05/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
03/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/19/2025
Permit issued — Plumbing
S01039172-S1-PL
02/03/2025
Permit issued — General Construction
S01039172-I1-GC
07/18/2024
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P2
07/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Lawrence Mandarino
07/18/2024
Special inspection requirement — Maintenance information
Lawrence Mandarino
07/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Lawrence Mandarino
07/18/2024
Special inspection requirement — Heating Systems
YEON LEE
06/05/2024
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-S3
05/17/2024
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-S1
05/17/2024
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-S2
05/17/2024
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-P1
05/07/2024
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF GAS-FIRED BOILER IN CELLAR.
S01039172-I1
10/06/2022
Objection resolved — Resolved
10/06/2022
Objection resolved — Resolved
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offZ N J CONSTRUCTION INC01/26/2026
DOB NOWMechanical SystemsSigned-offZ N J CONSTRUCTION INC01/26/2026
DOB NOWBoiler EquipmentSigned-offADVANCED PLUMBING MECH10/07/2025
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH02/19/2025
DOB NOWGeneral ConstructionSigned-offZ N J CONSTRUCTION INC02/03/2025
BISPLRE-ISSUEDADVANCED PLUMBING MECH11/05/2010
BISCCISSUEDN/A11/08/1993
BISPLISSUEDADVANCED PLUMBING MECH03/17/1993
BIS—ISSUEDM & M RESTORATION, LTD.03/01/1993
BIS—ISSUEDM & M RESTORATION, LTD.08/13/1992
1 project · most recent 06/05/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2026Signed-offZ N J CONSTRUCTION INCHeating Systems
Heating
Weil-Mclain EG-50 SERIES 6 200,000 BTU · Boiler ×2
1 project · most recent 06/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/05/2026Signed-offADVANCED PLUMBING MECHGas, Water/Sanitary
1 project · most recent 07/16/2025
General Wiring
FiledStatusContractorScope
07/16/2025CompleteRICHMOND ELEC'L CONTR'SGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/24/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/22/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/08/2026HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
06/08/2026Energy Code Compliance InspectionsGiuseppe Bonomoprogress
03/18/2026Fire-Resistance Rated ConstructionLawrence Mandarinoprogress
03/18/2026Energy Code Compliance InspectionsLawrence Mandarinoprogress
03/18/2026Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
03/18/2026Fenestration and door U-factor and product ratingsLawrence Mandarinoenergy_progress
03/18/2026Fenestration areasLawrence Mandarinoenergy_progress
03/18/2026Mechanical SystemsYEON LEEspecial
03/18/2026Heating SystemsYEON LEEspecial
03/18/2026Energy Code Compliance InspectionsLawrence Mandarinoprogress
03/18/2026FinalLawrence Mandarinoprogress
03/18/2026HVAC-R and service water heating equipmentLawrence Mandarinoenergy_progress
03/18/2026Maintenance informationLawrence Mandarinoenergy_progress
03/18/2026HVAC-R and service water heating system controlsLawrence Mandarinoenergy_progress
03/18/2026Fenestration air leakageLawrence Mandarinoenergy_progress
03/06/2026FinalLawrence Mandarinoprogress
03/06/2026Heating Systemsanthony santorospecial
03/06/2026Mechanical Systemsanthony santorospecial
03/06/2026Energy Code Compliance InspectionsLawrence Mandarinoprogress
03/06/2026HVAC-R and service water heating equipmentLawrence Mandarinoenergy_progress
03/06/2026Maintenance informationLawrence Mandarinoenergy_progress
03/06/2026HVAC-R and service water heating system controlsLawrence Mandarinoenergy_progress
03/06/2026Energy Code Compliance InspectionsGiuseppe Bonomoprogress
03/06/2026HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
05/19/2025HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
Latest 25 of 42.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026S00745169-I1Request digital key ↗
08/16/2026S01039172-P5Request digital key ↗
08/16/2026S01039172-P6Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/23/2022500105174Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026S01039172-S3Open ↗
09/23/2026S01039172-S3Open ↗
09/23/2026S01039172-S3Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026S00745169-I1Open ↗
08/16/2026S01039172-P5Open ↗
08/16/2026S01039172-P8Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026S01039172-S3Open ↗
09/01/2026S01039172-I1Open ↗
09/01/2026S01039172-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/24/2026S00745169-I1Open ↗
08/16/2026S01039172-P6Open ↗
08/16/2026S01039172-I1Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
08/23/2022500105174Open ↗