Elevator apt, fireproof with stores
Marlborough
747 2 AVENUE · BIN 1037175
💬 Discuss this project
1972Year Built
34Stories
D6Building Class
C1-9Zoning
387,761 sfGross Floor Area
272Units
LL97 CoveredRent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: ASN MURRAY HILL LLC · 22,178 sf lot · 17.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof2p · 2 filings · 5 docs
Floor 212p · 6 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EQUITY RESIDENTIAL7809/13/2026
ASN MURRAY HILL LLC EQUIT1303/22/2026
CENTRAL CONSTRUCTION MANA503/22/2026
ASN MURRY HILL LLC ARCHST203/22/2026
ASW MURRAY HILL LLC103/22/2026
ANS MURRAY HILL LLC303/22/2026
OWNER OF 245 EAST 4OTH ST103/22/2026
245 EAST 40 STREET PARKIN103/22/2026
40 REALTY LLC203/22/2026
GLENWOOD MANAGEMENT1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor707/08/2026
BINDELA CONSTRUCTION LLCGeneral Contractor404/09/2026
RIDGE CONSTRUCTION CORPGeneral Contractor403/21/2026
FIREQUEST CORPFire Protection307/08/2026
PAR FIRE PROTECTION LLCFire Protection207/08/2026
ACCESS PLUMBING CORPPlumbing207/08/2026
MEIR HERMANElectrical203/21/2026
NEE ELECTRICAL, LLCElectrical103/22/2026
ACEVEDO, ERNESTElectrical103/21/2026
WALTON, MARCElectrical103/21/2026
WEISENBERG, SElectrical103/21/2026
AMERICAN VENTILATION SERVGeneral Contractor107/08/2026
SIS IXPATAC, FELIPEElectrical103/21/2026
BOODHOO, ROOPNARINEElectrical103/21/2026
CASTLE ELECTRIC GROUP LLCElectrical103/22/2026
DERRICK RAMDEENElectrical103/21/2026
HEMNAUTH, SUDESHElectrical103/21/2026
MIKHAIL UMANSKIYElectrical103/21/2026
MILLS, CHARLESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MG NEW YORK ARCHITECTS, P3444104/16/2025
AMKA & ASSOCIATES LLC8239109/11/2023
TWIN PEAKS INC.317111/03/2021
NY RESTORATION TECHNOLOGY6187108/24/2021
VENTROP ENGINEERING CONSU450103/01/2021
JOSEPH MARTINES PE, PLLC1428610/07/2019
Building Lifecycle
All (186)Filed (20)Permit Issued (17)Signed Off (8)Facade (FISP) (13)Violation (60)Objection (38)Special Inspection (30)
08/19/2026
Filed — Alteration
Installation of two cooling only split-system air conditioning units in the elevator machine room and decommissioning of the existing system.
M01443943-I1
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2026
Special inspection requirement — Final
08/11/2026
Special inspection requirement — Mechanical Systems
07/06/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01400392-I1
06/19/2026
Filed — Alteration
Facade Inspection
M01408030-I1
06/12/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01411075-I1
06/03/2026
Permit issued — Suspended Scaffold
M01400392-I1-SC
06/02/2026
Objection raised — Other
06/02/2026
Objection resolved — Addressed
06/02/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
05/21/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01400392-I1
03/30/2026
Signed off — Alteration
Installation of ADA ramp on main roof level, no change to use occupancy or egress.
M01203319-I1
02/03/2026
Permit issued — General Construction
M01203319-I1-GC
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, open)
B
10/22/2025
Violation issued (HPD, open)
B
09/30/2025
Violation issued (HPD, open)
C
09/09/2025
Violation issued (ECB, closed)
Unknown
09/09/2025
Violation issued (ECB, closed)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
05/01/2025
Permit issued — General Construction
M01203319-I1-GC
04/16/2025
Filed — Alteration
Installation of ADA ramp on main roof level, no change to use occupancy or egress.
M01203319-I1
04/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL GADALETA
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL GADALETA
04/15/2025
Special inspection requirement — Air barrier - visual inspection
MICHAEL GADALETA
03/31/2025
Special inspection requirement — Final
MICHAEL GADALETA
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL GADALETA
12/23/2024
Signed off — Alteration
FILING FOR PLUMBING WORK FOR ADDITIONAL CLASSROOMS AT THE MANAHTTAN GODDARD SCHOOL AS PER PLANS FILED HEREWITH
M00190515-I1
12/18/2024
Signed off — Alteration
sprinkler work for gym conversion renovation at the Goddard school.
M00195918-I1
12/18/2024
Signed off — Alteration
SPRINKLER MODIFICATION WORK FOR THE GODDARD SCHOOL GYM CONVERSION AS PER PLANSFILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00190535-I1
12/18/2024
Signed off — Alteration
filing for plumbing work for the Goddard school gym renovation
M00195926-I1
08/12/2024
Signed off — Alteration
M00931258-I1
05/30/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Violation issued (ECB, closed)
Construction
12/08/2023
Violation issued (ECB, closed)
Unknown
12/08/2023
Violation issued (ECB, closed)
Unknown
09/11/2023
Filed — Alteration
M00931258-I1
05/26/2023
Violation issued (HPD, closed)
B
05/26/2023
Violation issued (HPD, closed)
C
05/26/2023
Violation issued (HPD, closed)
B
05/26/2023
Violation issued (HPD, closed)
B
05/26/2023
Violation issued (HPD, closed)
A
05/12/2023
Violation issued (HPD, closed)
A
05/12/2023
Violation issued (HPD, open)
A
03/22/2023
Cycle 9 facade report signed — SAFE
02/09/2023
Violation issued (HPD, open)
C
02/09/2023
Violation issued (HPD, closed)
B
02/08/2023
Violation issued (ECB, closed)
Construction
02/08/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Signed off — Alteration
M00559520-I1
01/20/2023
Cycle 9 facade report submitted
01/17/2023
Cycle 9 facade inspection completed
12/22/2022
Violation issued (ECB, closed)
Local Law
12/03/2022
Permit issued — Sprinklers
M00195918-I1-EW-SP
11/02/2022
Permit issued — Sidewalk Shed
M00624677-I1-SH
06/30/2022
Objection resolved — Addressed
06/30/2022
Objection resolved — Addressed
06/27/2022
Objection raised — Structural
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC06/03/2026
DOB NOWGeneral ConstructionSigned-offBINDELA CONSTRUCTION LLC02/03/2026
DOB NOWGeneral ConstructionSigned-offBINDELA CONSTRUCTION LLC05/01/2025
DOB NOWSprinklersSigned-offFIREQUEST CORP12/03/2022
DOB NOWSidewalk ShedPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT11/02/2022
DOB NOWSupported ScaffoldPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT12/03/2021
DOB NOWSidewalk ShedPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT11/24/2021
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/09/2021
DOB NOWMechanical SystemsSigned-offAMERICAN VENTILATION SERV04/07/2021
DOB NOWSprinklersSigned-offFIREQUEST CORP09/05/2019
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE09/05/2019
DOB NOWMechanical SystemsPermit IssuedRIDGE CONSTRUCTION CORP08/01/2019
DOB NOWMechanical SystemsPermit IssuedRIDGE CONSTRUCTION CORP08/01/2019
DOB NOWSprinklersSigned-offFIREQUEST CORP07/26/2019
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE07/25/2019
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP07/24/2019
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP07/24/2019
BISOTISSUEDTALISEN CONSTRUCTION CORP04/28/2022
BISMHISSUEDTALISEN CONSTRUCTION CORP04/28/2022
BISPLISSUEDWILLIAM C. GERAKARIS P&H09/28/2021
BISMHISSUEDTALISEN CONSTRUCTION CORP07/28/2021
BISOTISSUEDTALISEN CONSTRUCTION CORP07/28/2021
BISMHISSUEDTALISEN CONSTRUCTION CORP03/13/2020
BISOTISSUEDTALISEN CONSTRUCTION CORP03/13/2020
BISMHISSUEDTALISEN CONSTRUCTION CORP04/24/2019
BISOTISSUEDTALISEN CONSTRUCTION CORP04/24/2019
BISMHISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISOTISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISSPISSUEDPHOENIX PLMBG & MECH CORP05/14/2018
BISOTISSUEDEXCALIBUR GROUP LLC04/12/2018
BISOTISSUEDEXCALIBUR GROUP LLC04/12/2018
BISMHISSUEDEXCALIBUR GROUP LLC04/12/2018
BISPLISSUEDZAV PLUMBING AND HTNG LLC04/06/2018
BIS—ISSUEDSERVICE SIGN ERECTORS CO10/18/2017
BISMHISSUEDEXCALIBUR GROUP LLC09/11/2017
BIS—ISSUEDSCHIMENTI CONSTRUCTION CO06/26/2017
BISPLISSUEDTRISTATE PLBG SVCS CORP04/28/2017
BISOTISSUEDEXCALIBUR GROUP LLC04/19/2017
BISOTISSUEDEXCALIBUR GROUP LLC04/19/2017
BISOTISSUEDEXCALIBUR GROUP LLC04/19/2017
+ 27 more permits on file
4 projects · most recent 08/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026——Air Conditioning Systems
Cooling
Daikin RKV30AVJU9, DAIKIN POLARA 31,400 BTU · Condensing Unit ×2
03/01/2021Signed-offAMERICAN VENTILATION SERVAir Conditioning Systems
Cooling
Daikin REYQ120TATJU 120,000 BTU · Vrf Outdoor ×3
REYQ144TATJU 144,000 BTU · Vrf Outdoor ×1
REYQ168TATJU 168,000 BTU · Vrf Outdoor ×1
York TCJD60S43S4AA 60,000 BTU · Condensing Unit ×4
Fujitsu AOU36RLX 36,000 BTU · Condensing Unit ×1
Trane TTA240J300AA 240,000 BTU · Condensing Unit ×1
10/07/2019Permit IssuedRIDGE CONSTRUCTION CORPAir Conditioning Systems
Cooling
Daikin rel120tatju 10 tons · Condensing Unit ×5
10/07/2019Permit IssuedRIDGE CONSTRUCTION CORPAir Conditioning Systems
Cooling
Daikin REL120TATJU 10 tons · Condensing Unit ×2
12 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteMETHOD ELECTRIC LLCGeneral Wiring
10/21/2025CancelledMETHOD ELECTRIC LLCGeneral Wiring
06/24/2025Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
11/02/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
01/05/2023CompleteCASTLE ELECTRIC GROUP LLCGeneral Wiring
11/03/2021Permit IssuedTOP SHELF ELECTRIC CORP—
09/22/2021CompleteLIMONGELLI ELECTRIC CORPGeneral Wiring
08/21/2019Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
06/03/2019CompleteKVA ELECTRIC, INCGeneral Wiring
08/27/2018Permit IssuedPAGS ELECTRICAL CONTNG LLGeneral Wiring
08/27/2018CompletePAGS ELECTRICAL CONTNG LL—
01/11/2018CancelledHEXAGON CONST & ELECL GRP1 meters, 1 new_meters
2 projects · most recent 06/24/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/24/2022Permit IssuedCENTRAL CONSTRUCTION MANASidewalk Shed
11/03/2021Permit IssuedCENTRAL CONSTRUCTION MANAScaffold
3 projects · most recent 06/19/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/19/2026———
06/12/2026——Suspended Scaffold (SC)
05/21/2026Signed-offSKYTRAC ACCESS GROUP LLCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/18/2026Tenant Protection Plan Compliance—special
08/11/2026Final—progress
08/11/2026Mechanical Systems—special
06/02/2026Post-installed anchors in masonryMichael Lombardospecial
04/15/2025Fenestration and door U-factor and product ratingsMICHAEL GADALETAenergy_progress
04/15/2025Energy Code Compliance InspectionsMICHAEL GADALETAprogress
04/15/2025Air barrier - visual inspectionMICHAEL GADALETAenergy_progress
03/31/2025FinalMICHAEL GADALETAprogress
03/31/2025Tenant Protection Plan ComplianceMICHAEL GADALETAspecial
12/01/2021Post-installed AnchorsMIKHAIL ZEYGMANspecial
02/11/2021Mechanical SystemsWailoon Wongspecial
02/11/2021FinalWailoon Wongprogress
02/08/2021Maintenance informationWailoon Wongenergy_progress
02/08/2021HVAC-R and service water heating system controlsWailoon Wongenergy_progress
02/08/2021HVAC-R and service water heating equipmentWailoon Wongenergy_progress
10/08/2019HVAC insulation and sealingJOSEPH MARTINESenergy_progress
10/08/2019Smoke Control Systems TestingJOSEPH MARTINESspecial
10/08/2019FinalJOSEPH MARTINESprogress
10/08/2019Energy Code Compliance InspectionsJOSEPH MARTINESprogress
10/08/2019Shutoff dampersJOSEPH MARTINESenergy_progress
10/08/2019Duct leakage testingJOSEPH MARTINESenergy_progress
10/08/2019Mechanical SystemsJOSEPH MARTINESspecial
10/08/2019Electrical motorsJOSEPH MARTINESenergy_progress
10/08/2019HVAC and service water heating system controlsJOSEPH MARTINESenergy_progress
10/08/2019Permanent certificateJOSEPH MARTINESenergy_progress
Latest 25 of 53.
▾Documents — 772 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch11
09/03/2026M00559520-I1Request digital key ↗
09/03/2026M00624677-I1Request digital key ↗
09/03/2026M00624677-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00190491-I1Request digital key ↗
09/05/2026M00195898-I1Request digital key ↗
08/15/2026M00466494-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00195926-I1Request digital key ↗
09/05/2026M00190515-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00190535-I1Request digital key ↗
09/05/2026M00195918-I1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION85
12/10/2021123849112Open ↗
09/27/2021141005356Open ↗
10/10/2019123008627Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION61
09/28/2021123849112Open ↗
05/30/2019123008627Open ↗
04/23/2019123849112Open ↗
Showing 3 of 61 on file for this type
▸BISPLACE OF ASSEMBLY5
11/25/2019123330608Open ↗
10/09/2018123330608Open ↗
Showing 2 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWState DEC Permit1
09/05/2026M00190515-I1Open ↗
▸Seals & Professional Certifications195
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION74
11/25/2019123330608Open ↗
05/24/2019123684343Open ↗
05/24/2019123684343Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026M00466494-I1Open ↗
09/02/2026M00466494-I1Open ↗
08/29/2026M01203319-I1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
05/24/2019123684343Open ↗
Showing 1 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00195926-I1Open ↗
09/05/2026M00190515-I1Open ↗
09/05/2026M00190491-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
09/27/2021141005356Open ↗
05/24/2019123684343Open ↗
Showing 2 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M00466494-I1Open ↗
08/29/2026M01203319-I1Open ↗
08/28/2026M00190491-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/27/2021141005356Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/27/2021141005356Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment34
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
02/22/2019123849112Open ↗
02/19/2019123140537Open ↗
Showing 2 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/13/2018123140537Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/13/2018123140537Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
11/12/2024123008627Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan8
09/05/2026M00190515-I1Open ↗
09/05/2026M00195898-I1Open ↗
08/13/2026M00195918-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes6
05/24/2019123684343Open ↗
Showing 1 of 6 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
05/31/2019123684343Open ↗
10/18/2018140417984Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos38
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
05/24/2019123684343Open ↗
04/23/2019123849112Open ↗
Showing 2 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00195926-I1Open ↗
09/05/2026M00190515-I1Open ↗
09/05/2026M00190491-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
04/04/2019123849112Open ↗
02/22/2019123849112Open ↗
02/22/2019123849112Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/22/2018123140537Open ↗
09/19/2018122216351Open ↗
07/13/2018122216351Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/13/2021123849112Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
05/17/2022123849112Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/17/2022123849112Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00559520-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/10/2021123849112Open ↗
Showing 1 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/25/2019123330608Open ↗
08/06/2018123008627Open ↗
▸BISMECHANICAL SYSTEMS1
05/17/2022123849112Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/17/2022123849112Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/09/2018123008627Open ↗
▸Approvals, Objections & Sign-offs98
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
05/18/2022123849112Open ↗
12/08/2020123008627Open ↗
09/15/2020123008627Open ↗
Showing 3 of 45 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE29
10/10/2019123008627Open ↗
10/10/2019123008627Open ↗
10/10/2019123008627Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/08/2019123849112Open ↗
05/30/2019123008627Open ↗
03/14/2019123849112Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
05/17/2022123849112Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT41
05/17/2022123849112Open ↗
09/27/2021141005356Open ↗
05/24/2019123684343Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/17/2022123849112Open ↗
▸Filing & Intake Forms114
▸BISBOROUGH INTAKE FORM55
03/25/2020123008627Open ↗
03/13/2020123008627Open ↗
12/04/2019123008627Open ↗
Showing 3 of 55 on file for this type
▸BISEFILING COVER SHEET28
05/24/2019123684343Open ↗
02/22/2019123849112Open ↗
02/22/2019123849112Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION28
12/13/2021123849112Open ↗
10/10/2019123008627Open ↗
09/05/2019123330608Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/27/2021141005356Open ↗
Showing 1 of 3 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/16/2026M01411075-I1Open ↗
08/15/2026M01400392-I1Open ↗
▸DOB NOWCalculations2
08/16/2026M01411075-I1Open ↗
08/15/2026M01400392-I1Open ↗
▸BISDHCR DOCUMENT1
09/27/2021141005356Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTCO - Supporting Documents1
12/10/2024123008627Open ↗
▸DOB NOWIRA Certification1
08/16/2026M01408030-I1Open ↗