← Back
BROOKLYN
747 BEDFORD AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3427462
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE1201/28/2025
FL&M ENGINEERING DESIGN &INSPECTION303/07/2024
AT-DESIGN412/20/2023
PHILIBERT ENGINEERING, PC110/27/2023
SOUTH BAY ENGINEERING PLLC102/24/2022
DJLU ARCHITECT105/20/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUSTONE CONTRACTING LLCGeneral Contractor407/08/2026
GWT ENTERPRISES INCGeneral Contractor204/09/2026
YATZIV CORPGeneral Contractor207/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161001/28/2025
S&S CONCRETE & SOIL TESTI1008106/06/2023
Building Lifecycle
All (50)Filed (22)Permit Issued (17)Signed Off (10)Violation (1)
06/16/2025
Violation issued (HPD, closed)
A
02/24/2025
Signed off — Alteration
FILING A MECHANICAL SYSTEM IN CONJUNCTION WITH NB # 321773602
B00269010-I1
02/19/2025
Signed off — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-I1
02/18/2025
Signed off — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-S1
02/10/2025
Signed off — Alteration
Application herewith filed for Structure work in conjunction with job number 321773602
B00259230-I1
02/06/2025
Signed off — Alteration
FOUNDATION WORK IN CONJUNCTION WITH NB 321773602, INCLUDING SINGLE FOOTING ELEMENT FOR 421A
B00741995-I1
02/03/2025
Signed off — Alteration
Engineer enclosure system filing in conjunction with NB to comply with requirements of 3309.17.
B00940659-I1
01/29/2025
Permit issued — Protection and Mechanical Methods
B00940659-I1-PMM
01/28/2025
Filed — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-P4
01/15/2025
Filed — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-P3
01/13/2025
Signed off — Alteration
B00350034-I1
01/09/2025
Permit issued — Mechanical Systems
B00269010-I1-MS
01/02/2025
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00678297-I1
12/31/2024
Filed — Alteration
FILING A MECHANICAL SYSTEM IN CONJUNCTION WITH NB # 321773602
B00269010-P3
12/17/2024
Filed — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-P2
12/11/2024
Signed off — Alteration
B01013457-I1
12/11/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00886827-I1
11/22/2024
Permit issued — Curb Cut
B00350034-I1-CC
04/11/2024
Permit issued — Sprinklers
B00267978-S1-EW-SP
03/07/2024
Filed — Alteration
B01013457-I1
03/07/2024
Permit issued — Supported Scaffold
B01013457-I1-SF
03/04/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00886827-P1
02/01/2024
Permit issued — Construction Fence
B00678297-I1-FN
01/16/2024
Permit issued — Plumbing
B00267978-I1-PL
01/09/2024
Permit issued — Sidewalk Shed
B00886827-I1-SH
12/20/2023
Filed — Alteration
Application herewith filed for Structure work in conjunction with job number 321773602
B00259230-P1
12/19/2023
Filed — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-S1
12/14/2023
Filed — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-P1
11/09/2023
Filed — Alteration
FILING A MECHANICAL SYSTEM IN CONJUNCTION WITH NB # 321773602
B00269010-P2
10/27/2023
Filed — Alteration
Engineer enclosure system filing in conjunction with NB to comply with requirements of 3309.17.
B00940659-I1
10/18/2023
Filed — Alteration
FILING A MECHANICAL SYSTEM IN CONJUNCTION WITH NB # 321773602
B00269010-P1
10/16/2023
Filed — Alteration
B00271614-P1
07/25/2023
Permit issued — Construction Fence
B00678297-I1-FN
07/07/2023
Permit issued — Standpipe
B00271614-I1-EW-SD
06/28/2023
Permit issued — Structural
B00259230-I1-ST
06/09/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00886827-I1
06/09/2023
Permit issued — Sidewalk Shed
B00886827-I1-SH
06/06/2023
Filed — Alteration
FOUNDATION WORK IN CONJUNCTION WITH NB 321773602, INCLUDING SINGLE FOOTING ELEMENT FOR 421A
B00741995-P1
05/23/2023
Permit issued — Construction Fence
B00678297-I1-FN
05/19/2023
Permit issued — Foundation
B00741995-I1-FO
06/08/2022
Permit issued — Foundation
B00741995-I1-FO
05/26/2022
Filed — Alteration
FOUNDATION WORK IN CONJUNCTION WITH NB 321773602, INCLUDING SINGLE FOOTING ELEMENT FOR 421A
B00741995-I1
04/15/2022
Permit issued — Construction Fence
B00678297-I1-FN
03/01/2022
Permit issued — Construction Fence
B00678297-I1-FN
02/24/2022
Filed — Alteration
PROPOSED CONSTRUCTION FENCE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00678297-I1
06/08/2020
Filed — Alteration
Application herewith filed for Structure work in conjunction with job number 321773602
B00259230-I1
05/20/2020
Filed — Alteration
B00350034-I1
03/02/2020
Filed — Alteration
FILING A MECHANICAL SYSTEM IN CONJUNCTION WITH NB # 321773602
B00269010-I1
02/27/2020
Filed — Alteration
filing a plumbing system in conjunction with NB #321773602
B00267978-I1
12/09/2019
Filed — Alteration
B00271614-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offBLUSTONE CONTRACTING LLC01/29/2025
DOB NOWMechanical SystemsSigned-offBLUSTONE CONTRACTING LLC01/09/2025
DOB NOWCurb CutSigned-offBLUSTONE CONTRACTING LLC11/22/2024
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC04/11/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC03/07/2024
DOB NOWConstruction FenceSigned-offBLUSTONE CONTRACTING LLC02/01/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/16/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWConstruction FenceSigned-offBLUSTONE CONTRACTING LLC07/25/2023
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC07/07/2023
DOB NOWStructuralSigned-offBLUSTONE CONTRACTING LLC06/28/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES06/09/2023
DOB NOWConstruction FenceSigned-offBLUSTONE CONTRACTING LLC05/23/2023
DOB NOWFoundationSigned-offBLUSTONE CONTRACTING LLC05/19/2023
DOB NOWFoundationSigned-offYATZIV CORP06/08/2022
DOB NOWConstruction FenceSigned-offYATZIV CORP04/15/2022
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP03/01/2022
7 projects · most recent 05/01/2025
General Wiring
FiledStatusContractorScope
05/01/2025CompleteEP ELECTRIC NY LLCGeneral Wiring
04/06/2025CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
03/20/2025CancelledNET POWER ELECTRIC CORPGeneral Wiring
07/02/2024CompleteCAPUTEK ELEC'L SERVICES,—
09/14/2023CompleteS&R ELECTRICAL & MECHANIC32 meters, 32 new_meters
07/24/2023CompleteS&R ELECTRICAL & MECHANIC—
06/14/2023CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/12/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/08/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/01/2024Pass-Final SD Permit WithdrawalPassView ↗
01/31/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
02/04/2025Sprinkler SystemsFAHAD FATEHspecial
02/04/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/04/2025Post-installed AnchorsFAHAD FATEHspecial
01/27/2025Sprinkler SystemsFAHAD FATEHspecial
01/27/2025Post-installed AnchorsFAHAD FATEHspecial
01/27/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/08/2025Post-installed AnchorsFAHAD FATEHspecial
01/08/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/08/2025Sprinkler SystemsFAHAD FATEHspecial
01/06/2025HVAC and service water heating system controls FAHAD FATEHenergy_progress
01/06/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
01/06/2025Shutoff dampersFAHAD FATEHenergy_progress
01/06/2025Maintenance informationFAHAD FATEHenergy_progress
01/06/2025HVAC insulation and sealing FAHAD FATEHenergy_progress
01/06/2025HVAC and service water heating equipment FAHAD FATEHenergy_progress
01/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/06/2025Mechanical SystemsFAHAD FATEHspecial
01/06/2025FinalFAHAD FATEHprogress
12/18/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/18/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/18/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
12/18/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/18/2024Maintenance informationFAHAD FATEHenergy_progress
12/18/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/18/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 66.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch10
08/31/2026B00678297-I1Request digital key ↗
08/29/2026B00741995-I1Request digital key ↗
08/29/2026B00741995-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00269010-I1Request digital key ↗
09/02/2026B00269010-P3Request digital key ↗
08/15/2026B00269010-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026B00267978-P2Request digital key ↗
08/23/2026B00267978-I1Request digital key ↗
08/15/2026B00267978-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/26/2026B00271614-I1Request digital key ↗
08/26/2026B00271614-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026B00271614-I1Request digital key ↗
08/26/2026B00271614-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026B00259230-P1Request digital key ↗
08/14/2026B00259230-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00350034-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/26/2026322123206Open ↗
01/26/2026322123206Open ↗
01/26/2026322123206Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/22/2026322123206Open ↗
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/31/2026B00678297-I1Open ↗
08/29/2026B00741995-I1Open ↗
08/27/2026B00886827-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/17/2026B00269010-P3Open ↗
09/01/2026B00269010-I1Open ↗
09/01/2026B00741995-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/17/2026B00269010-P3Open ↗
09/01/2026B00269010-I1Open ↗
09/01/2026B00269010-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos9
▸DOB NOWOER: Notice to Proceed5
08/13/2026B00267978-I1Open ↗
08/13/2026B00259230-I1Open ↗
08/13/2026B00269010-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B00269010-I1Open ↗
08/13/2026B00741995-I1Open ↗
08/13/2026B00267978-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00267978-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00269010-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/29/2026B00741995-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/26/2026322123206Open ↗
01/26/2026322123206Open ↗
01/22/2026322123206Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
01/22/2026322123206Open ↗
▸BISBOROUGH INTAKE FORM1
01/22/2026322123206Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
01/26/2026322123206Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/22/2026322123206Open ↗