← Back
Miscellaneous two family
748 49 STREET
BROOKLYN · Sunset Park (Central) · BIN 3013102
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
1,648 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,003 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof16p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 6 docs
Floor 417p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Basement16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFE-SHIELD ENTERPRISES INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK103/10/2026
HSU & ASSOCIATES504/09/2025
FOCAL POINT ARCHITECTS & ASS.105/24/2024
NA307/20/2023
ASHRAF CORP101/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILD TEAM1803/21/2026
DANICO SERVICES203/21/2026
A&A BUILDING CONSULTANTS INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
5D ARCHITECT AND ENGINEERGeneral Contractor707/08/2026
JABBIE INDUSTRIES INCORP*General Contractor704/09/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing207/08/2026
CASE PLUMBING LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HSU & ASSOCIATES8025604/09/2025
NKM ENGINEERING PLLC6244105/24/2024
Building Lifecycle
All (78)Filed (11)Permit Issued (10)Signed Off (3)Violation (1)Inspection (8)Objection (19)Special Inspection (26)
08/14/2026
Objection raised — Other
08/06/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/06/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Zoning
03/25/2026
Objection raised — Scope
03/25/2026
Objection raised — Fire_Protection
03/25/2026
Objection raised — Structural
03/25/2026
Objection raised — Structural
03/25/2026
Objection raised — Structural
03/25/2026
Objection raised — Energy
03/25/2026
Objection raised — Structural
03/25/2026
Objection raised — Admin
03/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
File to propose vertical and Horizontal Enlargement for an existing 2 Story Building. Obtain 4 Family CofO.
B01318970-I1
02/18/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/18/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/10/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/21/2025
Permit issued — General Construction
B00686466-I1-GC-CX
07/21/2025
Signed off — Alteration
B01056828-I1
07/18/2025
Signed off — Alteration
TEMP CONSTRUCTION FENCE
B08005494-I1
04/21/2025
Special inspection requirement — Structural Cold-Formed Steel
Chih Hsu
04/21/2025
Special inspection requirement — Final
Chih Hsu
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
04/21/2025
Special inspection requirement — Structural Steel - Details
Chih Hsu
04/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chih Hsu
04/16/2025
Permit issued — Plumbing
B08052204-I1-PL
04/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Filed — Alteration CO
B00686466-P4
04/08/2025
Special inspection requirement — Structural Steel - Details
Chih Hsu
04/08/2025
Special inspection requirement — Final
Chih Hsu
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
04/08/2025
Special inspection requirement — Structural Cold-Formed Steel
Chih Hsu
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chih Hsu
04/03/2025
Filed — Alteration CO
B00686466-P3
04/02/2025
Permit issued — Sprinklers
B01056828-I1-EW-SP
01/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chih Hsu
01/27/2025
Special inspection requirement — Final
Chih Hsu
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
01/27/2025
Special inspection requirement — Structural Cold-Formed Steel
Chih Hsu
01/27/2025
Special inspection requirement — Structural Steel - Details
Chih Hsu
05/24/2024
Filed — Alteration
B01056828-I1
08/31/2023
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00820584-I1
07/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
07/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Chih Hsu
07/20/2023
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITHALT-1 JOB B00686466, FOR A 4-FAMILIES RESIDENTIAL BUILDING. NO CHANGE INEGRESS, OR USE.
B08052204-P1
07/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Chih Hsu
07/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
04/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/06/2023
Permit issued — Sidewalk Shed
B00820584-I1-SH
01/30/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00820584-I1
01/17/2023
Permit issued — General Construction
B00686466-S1-GC-CX
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*10/21/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/16/2025
DOB NOWSprinklersSigned-offS & L PLUMBING INC04/02/2025
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN02/06/2023
DOB NOWGeneral ConstructionSigned-off5D ARCHITECT AND ENGINEER01/17/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/06/2023
DOB NOWGeneral ConstructionPermit Issued5D ARCHITECT AND ENGINEER12/30/2022
DOB NOWConstruction FenceSigned-off5D ARCHITECT AND ENGINEER12/30/2022
DOB NOWStructuralPermit IssuedJABBIE INDUSTRIES INCORP*10/11/2022
DOB NOWConstruction FenceSigned-offJABBIE INDUSTRIES INCORP*09/23/2022
1 project · most recent 07/20/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/20/2023Signed-offCATMAN PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 02/10/2025
General Wiring
FiledStatusContractorScope
02/10/2025CompleteW 8 ELECTRIC CORPGeneral Wiring
1 project · most recent 03/10/2026
Steel
FiledStatusContractorScope
03/10/2026——Steel
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/18/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/18/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/10/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/21/2025Structural Cold-Formed SteelChih Hsuspecial
04/21/2025FinalChih Hsuprogress
04/21/2025Fire-Resistant Penetrations and JointsChih Hsuspecial
04/21/2025Structural Steel - DetailsChih Hsuspecial
04/21/2025Structural Stability – Alterations of existing buildingsChih Hsuspecial
04/08/2025Structural Steel - DetailsChih Hsuspecial
04/08/2025FinalChih Hsuprogress
04/08/2025Fire-Resistant Penetrations and JointsChih Hsuspecial
04/08/2025Structural Cold-Formed SteelChih Hsuspecial
04/08/2025Structural Stability – Alterations of existing buildingsChih Hsuspecial
01/27/2025Structural Stability – Alterations of existing buildingsChih Hsuspecial
01/27/2025FinalChih Hsuprogress
01/27/2025Fire-Resistant Penetrations and JointsChih Hsuspecial
01/27/2025Structural Cold-Formed SteelChih Hsuspecial
01/27/2025Structural Steel - DetailsChih Hsuspecial
07/21/2023Fire-Resistant Penetrations and JointsChih Hsuspecial
07/21/2023Energy Code Compliance InspectionsChih Hsuprogress
07/14/2023Energy Code Compliance InspectionsChih Hsuprogress
07/14/2023Fire-Resistant Penetrations and JointsChih Hsuspecial
08/16/2022Footing and FoundationChih Hsuprogress
08/16/2022Structural Cold-Formed SteelChih Hsuspecial
08/16/2022Structural Stability – Alterations of existing buildingsChih Hsuspecial
08/16/2022Structural Steel - DetailsChih Hsuspecial
08/16/2022FinalChih Hsuprogress
08/16/2022FinalChih Hsuprogress
Latest 25 of 26.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B00686466-S1Request digital key ↗
08/28/2026B00686466-P2Request digital key ↗
08/28/2026B00686466-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026B01318970-I1Open ↗
08/13/2026B01318970-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026B00686466-P4Open ↗
09/01/2026B00686466-P4Open ↗
09/01/2026B00686466-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00686466-P2Open ↗
08/28/2026B00686466-I1Open ↗
08/28/2026B00686466-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/25/2026B00686466-S1Open ↗
09/25/2026B00686466-S1Open ↗
09/01/2026B00686466-P4Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/28/2026B00686466-S1Open ↗
08/28/2026B00686466-P2Open ↗
08/28/2026B00686466-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00686466-S1Open ↗
08/13/2026B00686466-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026B00686466-P2Open ↗
08/28/2026B00686466-I1Open ↗
08/28/2026B00686466-P4Open ↗
Showing 3 of 8 on file for this type
▸Other Documents8
▸DOB NOWProperty Ownership Certification5
08/28/2026B00686466-P2Open ↗
08/28/2026B00686466-I1Open ↗
08/28/2026B00686466-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00686466-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00686466-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01318970-I1Open ↗