DOB05/16/2009TECHNICAL REPORT OF RESPONSIBILITY (TR-1) ON FILE IS NOT FILLED IN AS REQUIRED PRIOR TO PERMIT ISSUANCE AND START OF WORK UNDER CONTROLLED INSPECTION FOR UNDERPINNING AND STRUCTURAL STABILITY AND TENANT SAFETY UNDERPINNING HAS BEEN COMPLETED AT EXTERIOR WALLS IN LOWERED CELLAR REMEDY: SUBMIT REPORT OF ALL WORK UNDER CONTROLLED (SPECIAL) INSPECTIO
DOB04/16/2008WORK CONTRARY TO APPROVED PLANS 310082317 ALT UNDERPINNING PROCESSES CONTRARY IN THAT NO CONCRETE USED AS UNDERPINNING 6 INCH NON LOAD BEAR ING BLOCK CM USED NO DRYPACK AT EXISTING FOOTING TO CMU REAR AREA DROP DOWN TO PROPOSED ELEVATION 7' 4" CONTRARY TO PLAN PLAN MISSING PIT AT WEST AT WINDOW REMEDY: STOP ALL WORK AMEND PLAN PROVIDE PE REPORT
DOB11/01/2007STOP ALL WORK/BACKFILL TO EXISTING GRADE,OBTAIN A PERMIT IF FEASIBLE/P ROVIDE ENGINEER REPORT,CALL FOR INSPECTION BEFORE RESUMING WORK
Two family brick · 1.3 FAR built · Flood zone X500