749 WESTWOOD AVENUE
💬 Discuss this project
1970Year Built
2Stories
A1Building Class
R3-1Zoning
1,582 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,500 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Floor 26p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
Site & exterior15p · 1 filing · 20 docs
Filed — no permit issued12p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MP REALTY HOLDING CORP.1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC505/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MP REALTY HOLDING CORPGeneral Contractor403/21/2026
O'DONNELL, MICHAELElectrical103/21/2026
RUCHEFSKY, LEONARDElectrical103/21/2026
WEINMAN RESTORATION LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677104/13/2023
Building Lifecycle
All (39)Filed (5)Permit Issued (2)Signed Off (1)Objection (1)Special Inspection (30)
04/07/2026
Signed off — Alteration CO
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH ALTCO FOR PROPOSED HORIZONTAL FLOORS EXTENSION TO EXISTING BUILDING. RELOCATION AND ADDITION OF GAS & PLUMBING FIXTURES.
S00859396-S2
05/17/2023
Permit issued — Construction Fence
S00859396-S2-FN
05/16/2023
Permit issued — Structural
S00859396-I1-GC-CX
05/04/2023
Filed — Alteration CO
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH ALTCO FOR PROPOSED HORIZONTAL FLOORS EXTENSION TO EXISTING BUILDING. RELOCATION AND ADDITION OF GAS & PLUMBING FIXTURES.
S00859396-S3
04/28/2023
Filed — Alteration CO
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH ALTCO FOR PROPOSED HORIZONTAL FLOORS EXTENSION TO EXISTING BUILDING. RELOCATION AND ADDITION OF GAS & PLUMBING FIXTURES.
S00859396-S2
04/28/2023
Filed — Alteration CO
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH ALTCO FOR PROPOSED HORIZONTAL FLOORS EXTENSION TO EXISTING BUILDING. RELOCATION AND ADDITION OF GAS & PLUMBING FIXTURES.
S00859396-S1
04/25/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/13/2023
Filed — Alteration CO
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH ALTCO FOR PROPOSED HORIZONTAL FLOORS EXTENSION TO EXISTING BUILDING. RELOCATION AND ADDITION OF GAS & PLUMBING FIXTURES.
S00859396-I1
04/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Metering
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM MONTAGUE
04/13/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
04/06/2023
Objection raised — Scope
03/27/2023
Filed — Alteration CO
ALT CO APPLICATION PROPOSED HORIZONTAL FLOORS EXTENSION TO EXISTING BUILDING. PARTIAL INTERNAL REPARTITIONING AT EXISTING FLOORS. BLDG INCREASE NOT EXCEED 110% THEREFORe ENTIRE BLDG WILL COMPLY WITH 68 BLDG CODE REQUIREMENTS.
S00818048-I1
03/23/2023
Special inspection requirement — Duct leakage testing, insulation and design
03/23/2023
Special inspection requirement — Air barrier - visual inspection
01/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMP REALTY HOLDING CORP05/17/2023
DOB NOWStructuralPermit IssuedMP REALTY HOLDING CORP05/16/2023
BISOTISSUEDJAMES J STOUT ARCHITECT & ASSOC08/21/2017
BISPLISSUEDFRANK LIQUORI PLMBG. & HTG. INC05/15/2002
BISOTISSUEDN/A08/06/2001
2 projects · most recent 05/04/2023
Wood
FiledStatusContractorScope
05/04/2023Signed-offMP REALTY HOLDING CORPWood
03/27/2023——Wood
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
04/25/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
04/13/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
04/13/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
04/13/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
04/13/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
04/13/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
04/13/2023Structural Stability – Alterations of existing buildingsWILLIAM MONTAGUEspecial
04/13/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
04/13/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
04/13/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
04/13/2023Structural Wood FrameWILLIAM MONTAGUEprogress
04/13/2023FinalWILLIAM MONTAGUEprogress
04/13/2023Footing and FoundationWILLIAM MONTAGUEprogress
04/13/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
04/13/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
04/13/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
04/13/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
04/13/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
04/13/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
04/13/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
04/13/2023MeteringWILLIAM MONTAGUEenergy_progress
04/13/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
04/13/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
04/13/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
04/13/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
Latest 25 of 54.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00859396-S3Request digital key ↗
08/23/2026S00859396-I1Request digital key ↗
08/23/2026S00859396-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/18/2017540133746Open ↗
▸BISWORK PERMIT APPLICATION1
08/18/2017540133746Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00818048-I1Open ↗
08/13/2026S00859396-S3Open ↗
08/13/2026S00859396-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S00859396-I1Open ↗
09/02/2026S00859396-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026S00859396-I1Open ↗
09/02/2026S00859396-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/18/2017540133746Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/18/2017540133746Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/18/2017540133746Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
08/18/2017540133746Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/15/2026S00818048-I1Open ↗
08/13/2026S00859396-I1Open ↗
08/13/2026S00859396-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/18/2017540133746Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/18/2017540133746Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/18/2017540133746Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/18/2017540133746Open ↗
▸Inspections & Test Reports5
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S00818048-I1Open ↗
08/13/2026S00859396-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/18/2017540133746Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/18/2017540133746Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/18/2017540133746Open ↗
▸Other Documents7
▸DOB NOWPlot Diagram2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00859396-I1Open ↗
08/13/2026S00818048-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00859396-I1Open ↗