← Back
BuildNYC
Office with commercial, 1-6 stories
75-01 BROADWAY
QUEENS · Elmhurst · BIN 4036730
💬 Discuss this project
1969Year Built
3Stories
O5Building Class
R6Zoning
42,000 sfGross Floor Area
3Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only 2 old, status unconfirmed ▸
Office with commercial, 1-6 stories · Owner of record: Broadway Roosevelt Plaza · 18,055 sf lot · 2.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof3-k School, 3K Center9p · 3 filings · 17 docs
Floor 33K Center8p · 3 filings · 20 docs
Floor 23-k School, 3K Center56p · 5 filings · 15 docs
Floor 1Gmart NY, 3-k SchoolUnder Construction16p · 5 filings · 20 docs
CellarGmart NY, 3-k School15p · 3 filings · 20 docs
Site & exteriorGmart NY1p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Maxim Properties4107/08/2026
Broadway Roosevelt Plaza1103/22/2026
G Mart303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates107/08/2025
Zheng & Associates502/19/2024
Allen Shinfeld, P.E112/08/2023
Flushing111/14/2023
Shenoy Engineering611/19/2020
WSP308/20/2020
Rosenthal406/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tri-North Contracting203/21/2026
Milrose Consultants903/21/2026
City Expediting803/21/2026
Youn Design203/21/2026
Moses Katz Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C and E BuildersGeneral Contractor407/08/2026
Miles Glass & Metal Signspecialty_contractor303/21/2026
Litehouse BuildersGeneral Contractor303/21/2026
Varsity Plumbing and HeatingPlumbing207/08/2026
Zaq ConstructionGeneral Contractor203/21/2026
Countywide BuildersGeneral Contractor107/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
HP ServicesPlumbing107/08/2026
P.H. WorksPlumbing107/08/2026
R.A.M.S. Mechanicalspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168107/08/2025
Zheng & Associates7330502/19/2024
Universal Testing and Ins400711/19/2020
John Schimenti519406/04/2020
Building Lifecycle
All (115)Filed (21)Permit Issued (12)Signed Off (11)Violation (33)Inspection (4)Objection (4)Special Inspection (30)
04/23/2026
Permit issued — General Construction
Q01249282-I1-GC-CX
02/24/2026
Objection resolved — Addressed
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
08/05/2025
Special inspection requirement — Air barrier - visual inspection
SOORJBALLY HARILALL
07/29/2025
Objection raised — Admin
07/08/2025
Filed — Alteration CO
DEMOLITION OF 1 STORY PORTION OF EXISTING 3 STORY BUILDING AND UPDATE TO CERTIFICATE OF OCCUPANCY IN CONJUNCTION WITH SI APPLICATION # 421843223 AND NB APPLICATION # 421133311
Q01249282-I1
06/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
06/30/2025
Special inspection requirement — Final
SOORJBALLY HARILALL
01/08/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2024
Violation issued (ECB, closed)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2024
Signed off — Alteration
PLUMBING WORK FOR EXISTING SUPERMARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00881068-I1
02/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
02/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
02/23/2024
Special inspection requirement — Maintenance information
Jinfar Liu
02/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
02/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
02/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
02/22/2024
Signed off — Alteration
ADD NEW FISH TABLES, REFRIGERATORS, COOLER AND FREEZER FOR EXISTING SUPER MARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00881176-I1
02/21/2024
Special inspection requirement — Mechanical Systems
Jinfar Liu
02/21/2024
Special inspection requirement — Final
Jinfar Liu
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
02/19/2024
Filed — Alteration
PLUMBING WORK FOR EXISTING SUPERMARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00881068-P2
02/19/2024
Filed — Alteration
ADD NEW FISH TABLES, REFRIGERATORS, COOLER AND FREEZER FOR EXISTING SUPER MARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00881176-P1
02/19/2024
Special inspection requirement — Final
Jinfar Liu
02/19/2024
Special inspection requirement — Mechanical Systems
Jinfar Liu
02/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
02/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
02/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
02/07/2024
Special inspection requirement — Maintenance information
Jinfar Liu
02/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
02/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
02/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
01/30/2024
Signed off — Alteration
Q00954901-I1
01/29/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/10/2024
Signed off — Alteration
Q00957639-I1
01/08/2024
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
12/14/2023
Permit issued — Sign
Q00957639-I1-SG
12/08/2023
Filed — Alteration
Q00957639-I1
12/08/2023
Permit issued — General Construction
Q00954901-I1-GC
11/14/2023
Filed — Alteration
Q00954901-I1
07/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2023
Filed — Alteration
PLUMBING WORK FOR EXISTING SUPERMARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00881068-P1
07/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
07/15/2023
Special inspection requirement — Maintenance information
Jinfar Liu
07/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
07/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
07/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2023
Permit issued — Plumbing
Q00881068-I1-PL
06/20/2023
Permit issued — Mechanical Systems
Q00881176-I1-GC-CX
06/01/2023
Filed — Alteration
PLUMBING WORK FOR EXISTING SUPERMARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00881068-I1
06/01/2023
Filed — Alteration
ADD NEW FISH TABLES, REFRIGERATORS, COOLER AND FREEZER FOR EXISTING SUPER MARKET. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00881176-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/23/2021
Signed off — Alteration
Q00345772-I1
02/23/2021
Signed off — Alteration
Replace Mechanical Units on Roof, Minor Mechanical work on 3rd Floor, and Replace Air Handling Units on First Floor
Q00340246-I1
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCountywide Builders04/23/2026
DOB NOWSignSigned-offNeptune Signs & Awnings12/14/2023
DOB NOWGeneral ConstructionSigned-offMiles Glass & Metal Sign12/08/2023
DOB NOWPlumbingSigned-offHP Services06/23/2023
DOB NOWMechanical SystemsSigned-offZaq Construction06/20/2023
DOB NOWStructuralSigned-offLitehouse Builders08/31/2020
DOB NOWBoiler EquipmentSigned-offVarsity Plumbing and Heating07/27/2020
DOB NOWMechanical SystemsSigned-offR.A.M.S. Mechanical07/17/2020
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating07/16/2020
DOB NOWMechanical SystemsSigned-offC and E Builders06/16/2020
DOB NOWMechanical SystemsSigned-offC and E Builders06/16/2020
DOB NOWPlumbingSigned-offP.H. Works06/01/2020
BISOTISSUEDLitehouse Builders07/02/2020
BIS—ISSUEDC and E Builders06/30/2020
BISOTISSUEDC and E Builders06/26/2020
BISOTISSUEDC and E Builders05/21/2020
BISOTISSUEDLitehouse Builders03/13/2020
BISEQISSUEDNav Tech Construction04/29/2005
BIS—ISSUEDAmlang09/01/1998
BISPLISSUEDBradford Mechanical Contracting07/08/1998
BIS—ISSUEDAmerican Language Communication04/27/1998
BIS—ISSUEDY.H.S. Construction02/27/1998
BISPLISSUEDBradford Mechanical Contracting01/15/1998
BISFPISSUEDReliable Fire Protection01/02/1998
BISOTISSUEDNortheast Interiors10/06/1997
BISPLISSUEDBradford Mechanical Contracting09/16/1997
BISMHISSUEDY.H.S. Construction09/16/1997
BISOTISSUEDY.H.S. Construction09/15/1997
BISMHISSUEDProfessional Environmental Systems08/08/1997
BISPLISSUEDMagor PLG Heating05/21/1997
BISOTISSUEDHeng Yip Enterprises04/14/1997
BISPLISSUEDMagor Plumbing and Heating03/19/1997
BISEQISSUEDHeng Yip Enterprises02/06/1997
BISOTISSUEDHeng Yip Enterprises01/29/1997
BISOTISSUEDHeng Yip Enterprises01/29/1997
5 projects · most recent 11/22/2023
General Wiring
FiledStatusContractorScope
11/22/2023CompleteJong Hyun Kim—
07/10/2023CompleteR & T ElectricalGeneral Wiring
01/24/2022CompleteLND ElectricGeneral Wiring
03/09/2020CompleteJ & T General Corp DbaGeneral Wiring
03/05/2020CompleteJ & T General Corp Dba—
1 project · most recent 07/08/2025
FiledStatusContractorScope
07/08/2025Permit IssuedCountywide Builders2 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2024Pass-Final Sign Permit InspectionPassView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
08/05/2025Air barrier - visual inspectionSOORJBALLY HARILALLenergy_progress
08/05/2025Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
06/30/2025Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
06/30/2025FinalSOORJBALLY HARILALLprogress
02/23/2024Maintenance informationJinfar Liuenergy_progress
02/23/2024HVAC-R and service water heating equipmentJinfar Liuenergy_progress
02/23/2024HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
02/23/2024Energy Code Compliance InspectionsJinfar Liuprogress
02/23/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
02/23/2024HVAC-R and service water heating system controlsJinfar Liuenergy_progress
02/21/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
02/21/2024Mechanical SystemsJinfar Liuspecial
02/21/2024FinalJinfar Liuprogress
02/19/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
02/19/2024Mechanical SystemsJinfar Liuspecial
02/19/2024FinalJinfar Liuprogress
02/07/2024Maintenance informationJinfar Liuenergy_progress
02/07/2024Energy Code Compliance InspectionsJinfar Liuprogress
02/07/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
02/07/2024HVAC-R and service water heating system controlsJinfar Liuenergy_progress
02/07/2024HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
02/07/2024HVAC-R and service water heating equipmentJinfar Liuenergy_progress
07/15/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
07/15/2023Energy Code Compliance InspectionsJinfar Liuprogress
07/15/2023HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gmart NYRetailCellar, Floor 1
Project Q00954901 Alteration · LOC Issued · 11/14/2023
Project Q00881068 Alteration · LOC Issued · 06/01/2023
Project Q00881176 Alteration · LOC Issued · 06/01/2023
3K CenterEducationFloors 2, 3, Roof
Project Q00345772 Alteration · LOC Issued · 05/06/2020
3-k SchoolEducationCellar, Floors 1, 2
Project Q00327903 Alteration · LOC Issued · 03/13/2020
Project Q00268411 Alteration · LOC Issued · 03/12/2020
Project Q00327860 Alteration · LOC Issued · 03/12/2020
Project Q00331232 Alteration · LOC Issued · 03/12/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 255 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch9
08/24/2026Q00881176-P1Request digital key ↗
08/24/2026Q00881176-I1Request digital key ↗
08/23/2026Q00954901-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/28/2026Q00340246-I1Request digital key ↗
08/28/2026Q00345772-I1Request digital key ↗
08/28/2026Q00268411-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026Q00299081-I1Request digital key ↗
08/28/2026Q00327860-I1Request digital key ↗
08/15/2026Q00327860-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/28/2026Q00327903-I1Request digital key ↗
08/15/2026Q00327903-P2Request digital key ↗
08/15/2026Q00327903-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/27/2026Q00331232-I1Request digital key ↗
08/15/2026Q00331232-P1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION12
04/11/2022421329841Open ↗
07/14/2021421329841Open ↗
07/07/2021421329841Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION5
08/24/2020421757263Open ↗
06/30/2020421329841Open ↗
06/26/2020440584761Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/08/2020421329841Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
10/09/2020421329841Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/02/2020421329841Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/21/2025421843223Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01249282-I1Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature43
10/19/2026Q00340246-I1Open ↗
10/19/2026Q00340246-I1Open ↗
10/19/2026Q00340246-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/28/2026Q00299081-I1Open ↗
08/28/2026Q00345772-I1Open ↗
08/28/2026Q00268411-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
10/19/2026Q00340246-I1Open ↗
10/08/2026Q00881176-P1Open ↗
10/04/2026Q00881068-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/15/2020421763611Open ↗
05/15/2020421763611Open ↗
03/18/2020421757263Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/12/2020421763611Open ↗
03/03/2020421757263Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/12/2020421763611Open ↗
03/03/2020421757263Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/10/2020440584761Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
01/11/2021421329841Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/19/2026Q01249282-P1Open ↗
08/13/2026Q01249282-I1Open ↗
▸BISSTREET TREE CHECKLIST1
01/28/2020421329841Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026Q00299081-I1Open ↗
08/28/2026Q00345772-I1Open ↗
08/24/2026Q00881176-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/27/2026Q00331232-I1Open ↗
08/13/2026Q00268411-I1Open ↗
08/13/2026Q00327860-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/15/2020421763611Open ↗
03/16/2020421329841Open ↗
02/10/2020440584761Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/01/2020421757263Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
03/03/2022421763611Open ↗
07/14/2021421329841Open ↗
10/09/2020421329841Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/15/2020421763611Open ↗
05/15/2020421763611Open ↗
03/18/2020421757263Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/03/2022421763611Open ↗
11/02/2020421329841Open ↗
10/09/2020421329841Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
08/13/2026Q00331232-I1Open ↗
08/13/2026Q00340246-I1Open ↗
08/13/2026Q00268411-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY16
03/03/2022421763611Open ↗
07/14/2021421329841Open ↗
10/09/2020421329841Open ↗
Showing 3 of 16 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION11
11/02/2020421329841Open ↗
06/30/2020421329841Open ↗
06/26/2020440584761Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/07/2022421763611Open ↗
01/08/2021421329841Open ↗
10/29/2020421329841Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/14/2021421329841Open ↗
07/07/2021421329841Open ↗
03/17/2020421329841Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
11/02/2020421329841Open ↗
09/10/2020440584761Open ↗
09/01/2020421757263Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/03/2022421763611Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
09/29/2020421329841Open ↗
09/09/2020440584761Open ↗
09/04/2020421329841Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET4
05/15/2020421763611Open ↗
05/12/2020421763611Open ↗
03/03/2020421757263Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/10/2020440584761Open ↗
▸Other Documents7
▸BISPLOT DIAGRAM2
07/21/2025421843223Open ↗
01/28/2020421329841Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01249282-I1Open ↗
08/19/2026Q01249282-P1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/21/2025421843223Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/12/2020421757263Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01249282-I1Open ↗