ECB03/17/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: UPON TESTING SEVERAL GYM LIGHTS WERE NOT IN OPERATING. INCLUDING EMERGENCY LIGHTS ON 1ST FL WOULD NOT ILLUMINATE WHEN TESTED. BOX #10, 11, AND 12. ANothing owed — awaiting certificate of correction
ECB03/17/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: SMOKE DOORS NOT SELF-CLOSING UPON TESTING GYM DOOR BY EXIT 8, THESE FIREPROOF DOORS NOT SELF-CLOSING PROPERLY AND BROKEN HARDWARE.REMEDY: REPAIR ANDNothing owed — awaiting certificate of correction
ECB03/17/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: SPALLINGPLASTER AND PAINT COMING FROM CEILING DUE TO WATER DAMAGE ON 1ST FLOORBY EXIT 10 ABOVE EXTERIOR STREET LEVEL DOORS. REMEDY: REPAIR AND/OR RENothing owed — awaiting certificate of correction
ECB03/17/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: NO FIRE STOPPING PER BC 712.3; 27-345 ON THE BUILDINGS ELECTRICAL SWITCH GEAR ROOM THROUGH THE CMU OVER THE DOOR ENTRANCE TO THE ROOM. REMEDY: PROVINothing owed — awaiting certificate of correction
ECB03/17/2026EXIT DOOR NOT SELF-CLOSING. NOTED: EXTERIOR DOORS NOT PROPERLY DUE TO BAD HARDWARE, DOORS, JAMMING TO DOOR BACK AND/OR RACKED FROM DROPPING HINGES ON EXIT DOOR #2, EXIT #6, STAIR H, AND EXIT 8 ALL ON GROUND FLONothing owed — awaiting certificate of correction
ECB04/16/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. PARAPET WALL CRACKS AND PARTS MISSING SECTION LEAN 6' TO ROOF AND CHIMNEY MISSING MORTAR IN MANY AREA'S. REMEDY: REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB04/16/2025REISSUE #35678698H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ROOF LEVEL EXIT 11 BULKHEAD, WATER LEAKS PLASTER FALLING OFF WALL. REMEDY: REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB03/18/2024REISSUE#35622153K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT ROOF LEVEL BULKHEAD AT EXIT#11 WATER IS COMING FROM OUTSIDE OF BULKHEAD WALL AND PAINT FALLING OFF.REM:REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB02/16/2023FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TIME OFINSPECTION OBSERVED ROOF LEVEL BULKHEAD AT EXIT#11 WATER IS COMING FROM OUTSIDE OF BULKHEAD WALL AND RUSTED DOOR FRAME AND PAINT ON WALL WATNothing owed — awaiting certificate of correction
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 70,000 sf lot · 0.71 FAR built · Flood zone X