← Back
Two family converted from one family
75-04 88 AVENUE
QUEENS · BIN 4182928
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-1Zoning
3,002 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Cellar3p · 1 filing · 11 docs
2 jobs · most recent 07/06/2021
General Wiring
FiledStatusContractorScope
07/06/2021CompleteAYYUB ELECTRIC CORPGeneral Wiring
05/20/2021CompleteRICHARD NEU—
Building Lifecycle
All (67)Filed (5)Permit Issued (6)Signed Off (4)Violation (17)Inspection (6)Objection (16)Special Inspection (13)
07/27/2022
Signed off — Alteration
EXTERIOR RENOVATION ON OSP FOR FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00762881-I1
07/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/19/2022
Filed — Alteration
EXTERIOR RENOVATION ON OSP FOR FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00762881-P1
07/19/2022
Special inspection requirement — Masonry
DONGSHENG LU
07/19/2022
Special inspection requirement — Masonry
DONGSHENG LU
06/29/2022
Permit issued — General Construction
Q00762881-I1-GC
06/23/2022
Filed — Alteration
EXTERIOR RENOVATION ON OSP FOR FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00762881-I1
12/13/2021
Signed off — Alteration
FILED HEREWITH PLUMBING & SPRINKLER WORK TYPES IN CONJUNCTION WITH DOB ALT-1 APPLICATION # 440653712.
Q00453370-I1
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2021
Permit issued — Sprinklers
Q00453370-I1-EW-SP
11/09/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT APPLICATION TO BE FILED. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00429480-I1
11/02/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00512698-I1
08/31/2021
Violation issued (ECB, closed)
Unknown
08/31/2021
Violation issued (ECB, closed)
Construction
08/31/2021
Violation issued (ECB, closed)
Unknown
08/31/2021
Violation issued (ECB, closed)
Unknown
08/31/2021
Violation issued (ECB, closed)
Unknown
08/31/2021
Violation issued (ECB, closed)
Construction
08/02/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/02/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/02/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/20/2021
Violation issued (ECB, closed)
Construction
07/15/2021
Permit issued — Plumbing
Q00453370-I1-PL
06/20/2021
Violation issued (ECB, closed)
Construction
05/11/2021
Permit issued — Sidewalk Shed
Q00512698-I1-SH
05/09/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00512698-I1
05/09/2021
Special inspection requirement — Final
RAFI HAMID
04/30/2021
Violation issued (ECB, closed)
Construction
04/22/2021
Violation issued (ECB, closed)
Unknown
04/16/2021
Violation issued (ECB, closed)
Construction
01/21/2021
Objection raised — Structural
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Structural
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Admin
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Structural
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Admin
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Mechanical
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Structural
01/21/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Inspections
01/21/2021
Objection resolved — Addressed
01/15/2021
Filed — Alteration
FILED HEREWITH PLUMBING & SPRINKLER WORK TYPES IN CONJUNCTION WITH DOB ALT-1 APPLICATION # 440653712.
Q00453370-I1
01/13/2021
Permit issued — Construction Fence
Q00429480-I1-FN
01/13/2021
Special inspection requirement — Sprinkler Systems
CHRISTIAN LOZADA
01/13/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/13/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
Latest 60 of 67 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGSLAND PROPERTIES1007/08/2026
HOLLIS NYC CONSTRUCTION803/22/2026
NYC HOLDING GROUP803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/05/2022$1.4M—NYC HOLDING GROUP LLC → Private party$480/sf building
10/23/2020$540K—— → —$180/sf building
06/06/2019$118K—Private party → TWO PROPERTIES ESTATES LLC$39/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU ENGINEERING SERVICE PC207/19/2022
SYED ENGINEERING, P.C.105/09/2021
CL ENGINEERING P.C.201/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY403/21/2026
METRO DESIGN CONSULTANTS INC403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOLLIS NYC CONSTRUCTIONGeneral Contractor407/08/2026
FUTURE RESTORATION INCGeneral Contractor203/21/2026
GO PRO FIRE PROTECTION CGeneral Contractor103/21/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
H&Z BUILDING CONSULTING IGeneral Contractor107/08/2026
LOVETRO SCOTTGeneral Contractor103/21/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LU ENGINEERING SERVICE PC6575207/19/2022
CL ENGINEERING P.C.6781101/15/2021
IP CONCRETE TESTING AND I6252101/15/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offH&Z BUILDING CONSULTING I06/29/2022
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C11/23/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN07/15/2021
DOB NOWSidewalk ShedSigned-offHOLLIS NYC CONSTRUCTION05/11/2021
DOB NOWConstruction FenceSigned-offHOLLIS NYC CONSTRUCTION01/13/2021
DOB NOWConstruction FenceSigned-offFUTURE RESTORATION INC11/25/2020
BIS—ISSUEDHOLLIS NYC CONSTRUCTION03/12/2021
BIS—ISSUEDHOLLIS NYC CONSTRUCTION03/12/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/02/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/02/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/02/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/19/2022MasonryDONGSHENG LUspecial
07/19/2022MasonryDONGSHENG LUspecial
05/09/2021FinalRAFI HAMIDprogress
01/13/2021Sprinkler SystemsCHRISTIAN LOZADAspecial
01/13/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/13/2021HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/13/2021HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/13/2021HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/13/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
01/13/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/13/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
01/13/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
11/17/2020FinalCHRISTIAN LOZADAprogress
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
08/27/2026Q00512698-I1Request digital key ↗
08/26/2026Q00762881-P1Request digital key ↗
08/26/2026Q00762881-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026Q00453370-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00429480-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026Q00453370-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION9
03/25/2022440653712Open ↗
01/06/2022440661963Open ↗
08/04/2021440653712Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION3
06/18/2021440653712Open ↗
06/18/2021440653712Open ↗
03/12/2021440653712Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/23/2021440653712Open ↗
12/24/2020440653712Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/26/2021440653712Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
03/01/2022440661963Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/12/2021440653712Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/12/2021440653712Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/14/2021440661963Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
02/23/2021440653712Open ↗
▸BISVERIFY TAX LOT1
12/13/2021440653712Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/13/2021440653712Open ↗
▸BISZONING DIAGRAM1
02/23/2021440653712Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q00453370-I1Open ↗
08/29/2026Q00453370-I1Open ↗
08/29/2026Q00453370-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00453370-I1Open ↗
08/26/2026Q00762881-I1Open ↗
08/26/2026Q00762881-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00512698-I1Open ↗
08/29/2026Q00429480-I1Open ↗
08/29/2026Q00453370-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/11/2021440661963Open ↗
12/10/2020440653712Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/11/2021440661963Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/13/2021440653712Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/13/2021440653712Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/13/2021440653712Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/13/2021440653712Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
02/11/2021440661963Open ↗
12/10/2020440653712Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/12/2021440653712Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q00453370-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/12/2021440653712Open ↗
03/01/2021440653712Open ↗
12/10/2020440653712Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
12/13/2021440653712Open ↗
12/13/2021440653712Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
12/13/2021440653712Open ↗
12/13/2021440653712Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/13/2021440653712Open ↗
▸BISINTERIOR LIGHTING POWER1
12/13/2021440653712Open ↗
▸BISFENESTRATION AREAS1
12/13/2021440653712Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
12/13/2021440653712Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2021440653712Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/13/2021440653712Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00453370-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY11
10/26/2021440653712Open ↗
06/15/2021440653712Open ↗
06/15/2021440653712Open ↗
Showing 3 of 11 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
12/13/2021440653712Open ↗
▸BISBPP - Inspection Appointment Form1
03/01/2022440661963Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/13/2021440653712Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/13/2021440653712Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/13/2021440653712Open ↗
▸BISMASONRY1
12/13/2021440653712Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/13/2021440653712Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/13/2021440653712Open ↗
▸BISSOIL REPORT1
12/10/2020440653712Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/10/2020440653712Open ↗
▸Approvals, Objections & Sign-offs12
▸BISSCHEDULE A - OCCUPANCY / USE5
03/28/2022440653712Open ↗
05/05/2021440653712Open ↗
02/16/2021440653712Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/31/2022440653712Open ↗
03/01/2022440661963Open ↗
03/12/2021440653712Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
03/01/2022440661963Open ↗
03/01/2022440661963Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
12/24/2020440653712Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
03/01/2022440661963Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/13/2021440653712Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION10
03/29/2022440653712Open ↗
01/11/2022440661963Open ↗
10/26/2021440653712Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/11/2021440661963Open ↗
12/10/2020440653712Open ↗
▸BISBOROUGH INTAKE FORM1
06/18/2021440653712Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION3
03/01/2022440661963Open ↗
03/01/2022440661963Open ↗
01/11/2022440661963Open ↗
▸BISPLOT DIAGRAM2
12/13/2021440653712Open ↗
12/24/2020440653712Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
12/13/2021440653712Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/10/2020440653712Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/22/2021440661963Open ↗
▸BISMAINTENANCE INFORMATION1
12/13/2021440653712Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/13/2021440653712Open ↗
▸BISPERMANENT CERTIFICATE1
12/13/2021440653712Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
12/13/2021440653712Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/13/2021440653712Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
12/13/2021440653712Open ↗