← Back
BuildNYC
Elevator apt, semi-fireproof without stores
75-06 WOODSIDE AVENUE
QUEENS · Elmhurst · BIN 4037687
💬 Discuss this project
1962Year Built
7Stories
D1Building Class
R6BZoning
52,553 sfGross Floor Area
75Units
LL97 CoveredRent Stabilized71 Active Violations 8 likely answered 3 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Damar Apartments · 10,870 sf lot · 4.83 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWerber Management4p · 2 filings · 7 docs
Site & exteriorWerber Management6p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Damar Apts1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scope Engineering Consultants105/17/2022
Enthink Engineers102/15/2022
Scherer Design Group108/04/2020
Arcnet Architects103/28/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anzalone Architecture203/21/2026
CCM Services Group103/21/2026
KNS Building Restoration203/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KNS Building RestorationGeneral Contractor507/08/2026
MNK Enterprises NYScaffold507/08/2026
Bechtel Infrastructure AnGeneral Contractor203/21/2026
Crosslink Wirelessspecialty_contractor203/21/2026
Squan Construction ServicesGeneral Contractor103/21/2026
Jacobs Telecommunspecialty_contractor107/08/2026
Charter CommunicationGeneral Contractor103/21/2026
Odyssia Global CommunicationsGeneral Contractor103/21/2026
Preferred BuildersGeneral Contractor106/24/2010
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Scope Engineering Consulting7894105/17/2022
Scherer Design Group7921108/04/2020
Papay Engineering & Construction4506103/28/2018
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/13/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
07/21/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
07/21/2026
§ 27-2005, 2007 ADM code remove device preventing door from being self-closing consisting of kickdown door stopper installed on 1ST from north at…
HPD violation · open
07/21/2026
§ 27-2005, 27-2007, 27-2041.1 hmc, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or…
HPD violation · closed
240 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedKNS Building Restoration02/14/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY02/14/2024
DOB NOWGeneral ConstructionSigned-offKNS Building Rest02/07/2024
DOB NOWGeneral ConstructionSigned-offKNS Building Rest09/11/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/13/2023
DOB NOWGeneral ConstructionSigned-offKNS Building Rest09/20/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/15/2022
DOB NOWAntennaSigned-offArmentum Digital Infrastr09/09/2020
DOB NOWAntennaSigned-offSteadfast Development07/26/2018
BISOTISSUEDSquan Construction Services04/04/2017
BISOTISSUEDBechtel Infrastructure An04/06/2016
BISOTISSUEDBechtel Infrastructure An03/11/2016
BISOTISSUEDPreferred Builders06/24/2010
BISOTISSUEDOdyssia Global Commercial02/01/2006
BISOTISSUEDCharter Communication01/16/2004
BISFBISSUEDV.H.E. Heating07/07/1992
2 projects · most recent 02/15/2022
FiledStatusContractorScope
02/15/2022CompleteRichard Neu—
10/29/2019Permit IssuedStar Electrical Contractors—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/28/2022Structural Stability – Alterations of existing buildingsPaul Henryspecial
11/02/2021MasonryPaul Henryspecial
11/02/2021FinalPaul Henryprogress
68 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account