← Back
Two stories - detached, small or mid-size
75-08 185 STREET
QUEENS · BIN 4154907
💬 Discuss this project
2025Year Built
2.5Stories
A1Building Class
R2AZoning
2,939 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,017 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 20 docs
Floor 2Under Construction14p · 2 filings · 20 docs
Floor 1Under Construction14p · 2 filings · 20 docs
CellarUnder Construction14p · 2 filings · 20 docs
1 job · most recent 02/28/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/28/2025Permit IssuedSB RENOVATION & MODELINGAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman ASPT 61D14 4 tons · Ahu ×4
GSXC18 0481B 4 tons · Condensing Unit ×4
Heating
A.O. Smith HNT-55 Electric Heater ×2
Rheem RHBH-L99I 99,000 BTU · Boiler ×2
2 jobs · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
11/05/2025Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
2 jobs · most recent 04/15/2025
Wood
FiledStatusContractorScope
04/15/2025Permit IssuedCUSTOMBUILT HOMES INC2 scope_items
02/28/2025Permit IssuedSB RENOVATION & MODELINGWood
1 job · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedSUNRUN INSTALLATION SVC28 panels, 12.6 kw, 294 roof_area_sqft
1 job · most recent 03/30/2024
Fence
FiledStatusContractorScope
03/30/2024Permit IssuedR&R CONTRACTING MGMT CORPFence
1 job · most recent 02/28/2025
Earthwork
FiledStatusContractorScope
02/28/2025Permit IssuedSB RENOVATION & MODELINGEarthwork
Building Lifecycle
All (90)Filed (11)Permit Issued (11)Signed Off (1)Violation (10)Inspection (5)Objection (24)Special Inspection (28)
09/14/2026
Permit issued — Plumbing
Q00939347-S1-PL
08/10/2026
Permit issued — Mechanical Systems
Q00939355-I1-GC-CX
08/07/2026
Permit issued — Solar
Q01440078-I1-SL
08/04/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01440078-I1
08/04/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/03/2026
Special inspection requirement — Final
Walid Abdulla
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/30/2026
Permit issued — Construction Fence
Q00939351-I1-FN
05/19/2026
Filed — Alteration
Q00939347-S1
05/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
12/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/12/2025
Permit issued — Plumbing
Q00939347-I1-PL
08/06/2025
Permit issued — General Construction
Q00939355-I1-GC-CX
07/03/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — Sprinkler Systems
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — Metering
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
07/03/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
06/10/2025
Filed — Alteration
Q00939347-P1
06/09/2025
Violation issued (ECB, closed)
Unknown
06/09/2025
Violation issued (ECB, closed)
Construction
06/09/2025
Violation issued (ECB, closed)
Construction
06/09/2025
Violation issued (ECB, closed)
Construction
06/09/2025
Violation issued (ECB, closed)
Unknown
04/15/2025
Filed — Alteration
Installing temporary shoring on a property line to support dirt during excavation and foundation work of the new building.
Q01156425-P1
04/15/2025
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — Metering
04/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
04/15/2025
Special inspection requirement — Sprinkler Systems
04/15/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
02/28/2025
Filed — New Building
PROPOSED TWO STORY + CELLAR (1) FAMILY HOUSE AS PER DRAWING HEREWITH FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q00939355-P4
12/24/2024
Permit issued — Support of Excavation
Q01156425-I1-SE
12/18/2024
Objection resolved — Addressed
12/17/2024
Objection raised — Other
12/16/2024
Filed — Alteration
Installing temporary shoring on a property line to support dirt during excavation and foundation work of the new building.
Q01156425-I1
12/03/2024
Permit issued — Construction Fence
Q00939351-I1-FN
10/29/2024
Violation issued (ECB, closed)
Unknown
10/29/2024
Violation issued (ECB, closed)
Construction
10/29/2024
Violation issued (ECB, closed)
Site Safety
10/29/2024
Objection resolved — Addressed
10/22/2024
Permit issued — General Construction
Q00939355-I1-GC-CX
10/10/2024
Objection resolved — Addressed
Latest 60 of 90 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOMES INC CUSTOMBUILT303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2022$949K—— → —— not available
07/27/2022$830K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/04/2026
ARCHITECTURAL CONCEPT1005/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOMBUILT HOMES INCGeneral Contractor907/08/2026
DRM CONSTRUCTION CORPGeneral Contractor303/21/2026
SB RENOVATION & MODELINGGeneral Contractor108/11/2026
SUNRUN INSTALLATION SVCGeneral Contractor108/26/2026
KISHAN PLUMBING INCPlumbing107/08/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
RAYMOND'S PLBG & HTG LLCPlumbing109/15/2026
R&R CONTRACTING MGMT CORPGeneral Contractor107/31/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/04/2026
ARCHITECTURAL CONCEPT3642606/10/2025
TRIANGLE INSPECTION & TES7495109/10/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRAYMOND'S PLBG & HTG LLC09/14/2026
DOB NOWMechanical SystemsPermit IssuedSB RENOVATION & MODELING08/10/2026
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/07/2026
DOB NOWConstruction FencePermit IssuedR&R CONTRACTING MGMT CORP07/30/2026
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC09/12/2025
DOB NOWGeneral ConstructionPermit IssuedCUSTOMBUILT HOMES INC08/06/2025
DOB NOWSupport of ExcavationPermit IssuedCUSTOMBUILT HOMES INC12/24/2024
DOB NOWConstruction FencePermit IssuedCUSTOMBUILT HOMES INC12/03/2024
DOB NOWGeneral ConstructionPermit IssuedCUSTOMBUILT HOMES INC10/22/2024
DOB NOWFull DemolitionSigned-offCUSTOMBUILT HOMES INC07/08/2024
DOB NOWConstruction FencePermit IssuedDRM CONSTRUCTION CORP04/15/2024
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/05/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/04/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/04/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/03/2026FinalWalid Abdullaprogress
08/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/03/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
07/03/2025Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
07/03/2025Sprinkler SystemsMUZAFFAR JAMALspecial
07/03/2025Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
07/03/2025MeteringMUZAFFAR JAMALenergy_progress
07/03/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
07/03/2025HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
07/03/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/03/2025Maintenance informationMUZAFFAR JAMALenergy_progress
07/03/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/15/2025Subgrade InspectionsMUZAFFAR JAMALspecial
04/15/2025Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
04/15/2025Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
04/15/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
04/15/2025Metering—energy_progress
04/15/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
04/15/2025HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
04/15/2025Maintenance informationMUZAFFAR JAMALenergy_progress
04/15/2025Sprinkler Systems—special
Latest 25 of 28.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026Q00937039-I1Request digital key ↗
08/23/2026Q00939351-I1Request digital key ↗
08/21/2026Q00939349-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/31/2024440819107Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/31/2024440819107Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00939355-P4Open ↗
08/13/2026Q00939355-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/23/2026Q00937039-I1Open ↗
08/23/2026Q00939351-I1Open ↗
08/20/2026Q00939355-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00939347-I1Open ↗
09/01/2026Q00939347-I1Open ↗
08/26/2026Q01440078-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00939347-I1Open ↗
09/01/2026Q00939347-I1Open ↗
08/26/2026Q01440078-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/31/2024440819107Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/31/2024440819107Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00939355-I1Open ↗
08/13/2026Q00939355-P4Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00937039-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00937039-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00937039-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00937039-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00939355-I1Open ↗
08/13/2026Q00939355-P4Open ↗
▸BISSTREET TREE CHECKLIST1
12/31/2024440819107Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00939355-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026Q00937039-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00937039-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00939355-I1Open ↗
08/13/2026Q01156425-I1Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/31/2024440819107Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/31/2024440819107Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/31/2024440819107Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00937039-I1Open ↗
08/20/2026Q00939355-P4Open ↗
08/20/2026Q00939355-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
12/31/2024440819107Open ↗
12/31/2024440819107Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/13/2026Q00939355-I1Open ↗
08/13/2026Q00939355-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00939355-P4Open ↗
08/13/2026Q00939355-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00939355-I1Open ↗
08/13/2026Q01156425-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00939355-P4Open ↗
08/13/2026Q00939355-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/31/2024440819107Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00937039-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00937039-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00937039-I1Open ↗