← Back
Primarily 2 family with 1 store or office
75-10 METROPOLITAN AVENUE
QUEENS · BIN 4091418
💬 Discuss this project
1910Year Built
2Stories
S2Building Class
R5Zoning
2,480 sfGross Floor Area
3Units
1 Open Violation ▸
Primarily 2 family with 1 store or office · Owner of record: 7510 METROPOLITAN AVE LLC · 2,000 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 11 docs
Floor 23p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/27/2023$1.1M—75-10 METRO CORP. → 7510 METROPOLITAN AVE LLC$444/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRUPO DESIGN804/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CARLOS RAMIREZ803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCISCO SOSA, INCGeneral Contractor107/08/2026
V&G MECHANICAL CORPGeneral Contractor104/09/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GIOVANNI ZAPATA R.A.3882804/10/2024
Building Lifecycle
All (31)Filed (8)Permit Issued (4)Signed Off (2)Violation (3)Inspection (6)Objection (2)Special Inspection (6)
03/12/2026
Permit issued — Mechanical Systems
Q00879048-I1-MS
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2024
Signed off — Alteration
PROP. TO INSTALL NEW HAND SINK AT 1ST FLR & 2 PIECE BATH CELLAR, REPLACE PLUMBING FIXTURES ON (1) DWELLING UNIT AT 2ND FLOOR, EXIST. (2) H.W.H. AND BOILER (1) TO REMAIN, AS PER PLANS.
Q00877041-I1
04/10/2024
Filed — Alteration
PROP. TO INSTALL NEW HAND SINK AT 1ST FLR & 2 PIECE BATH CELLAR, REPLACE PLUMBING FIXTURES ON (1) DWELLING UNIT AT 2ND FLOOR, EXIST. (2) H.W.H. AND BOILER (1) TO REMAIN, AS PER PLANS.
Q00877041-P4
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
03/05/2024
Filed — Alteration
PROP. TO INSTALL NEW HAND SINK AT 1ST FLR & 2 PIECE BATH CELLAR, REPLACE PLUMBING FIXTURES ON (1) DWELLING UNIT AT 2ND FLOOR, EXIST. (2) H.W.H. AND BOILER (1) TO REMAIN, AS PER PLANS.
Q00877041-P3
02/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
02/12/2024
Permit issued — Plumbing
Q00877041-I1-PL
11/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2023
Filed — Alteration
INSTALL NEW HVAC 5 TN MINI SPLIT UNIT FOR A FIRST FLOOR COMMERCIAL SPACE AND (2) HVAC MINI SPLIT UNITS FOR EXIST (2) APARTMENTS AT SECOND FLOOR.
Q00879048-I1
11/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXIST RETAIL STORE UG6 FOR PHARMACY AT 1ST FLR & CELL AS ACCESSORY USE OF 1ST FLR, RENOVATION TWO DWELL UNITS AT 2 FLR, NO CHANGE IN USE, OCCUPANCY, CONST CLASS OR EGRESS.
Q00877015-I1
10/13/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/09/2023
Filed — Alteration
PROP. TO INSTALL NEW HAND SINK AT 1ST FLR & 2 PIECE BATH CELLAR, REPLACE PLUMBING FIXTURES ON (1) DWELLING UNIT AT 2ND FLOOR, EXIST. (2) H.W.H. AND BOILER (1) TO REMAIN, AS PER PLANS.
Q00877041-P2
10/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
09/20/2023
Filed — Alteration
INTERIOR RENOVATION OF EXIST RETAIL STORE UG6 FOR PHARMACY AT 1ST FLR & CELL AS ACCESSORY USE OF 1ST FLR, RENOVATION TWO DWELL UNITS AT 2 FLR, NO CHANGE IN USE, OCCUPANCY, CONST CLASS OR EGRESS.
Q00877015-P1
09/20/2023
Filed — Alteration
PROP. TO INSTALL NEW HAND SINK AT 1ST FLR & 2 PIECE BATH CELLAR, REPLACE PLUMBING FIXTURES ON (1) DWELLING UNIT AT 2ND FLOOR, EXIST. (2) H.W.H. AND BOILER (1) TO REMAIN, AS PER PLANS.
Q00877041-P1
09/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
09/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
09/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/01/2023
Permit issued — Plumbing
Q00877041-I1-PL
06/13/2023
Permit issued — General Construction
Q00877015-I1-GC
06/05/2023
Objection resolved — Addressed
05/31/2023
Objection raised — Scope
05/23/2023
Filed — Alteration
PROP. TO INSTALL NEW HAND SINK AT 1ST FLR & 2 PIECE BATH CELLAR, REPLACE PLUMBING FIXTURES ON (1) DWELLING UNIT AT 2ND FLOOR, EXIST. (2) H.W.H. AND BOILER (1) TO REMAIN, AS PER PLANS.
Q00877041-I1
05/22/2023
Filed — Alteration
INTERIOR RENOVATION OF EXIST RETAIL STORE UG6 FOR PHARMACY AT 1ST FLR & CELL AS ACCESSORY USE OF 1ST FLR, RENOVATION TWO DWELL UNITS AT 2 FLR, NO CHANGE IN USE, OCCUPANCY, CONST CLASS OR EGRESS.
Q00877015-I1
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedV&G MECHANICAL CORP03/12/2026
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC02/12/2024
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/01/2023
DOB NOWGeneral ConstructionSigned-offFRANCISCO SOSA, INC06/13/2023
1 project · most recent 11/03/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/03/2023Permit IssuedV&G MECHANICAL CORPAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-5C42NA3 45,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 05/23/2023
General Wiring
FiledStatusContractorScope
05/23/2023CompleteVALENTIS ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/10/2024Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
02/27/2024Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
10/09/2023Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
10/02/2023Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
09/18/2023Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
09/18/2023Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00877015-I1Request digital key ↗
08/24/2026Q00877015-P1Request digital key ↗
08/24/2026Q00877041-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00877015-I1Open ↗
08/24/2026Q00877041-P1Open ↗
08/24/2026Q00877041-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q00877015-I1Open ↗
08/28/2026Q00877041-P1Open ↗
08/28/2026Q00877041-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00877015-I1Open ↗
08/24/2026Q00877041-P1Open ↗
08/24/2026Q00877041-I1Open ↗
Showing 3 of 8 on file for this type