75-19 184 STREET
QUEENS · Fresh Meadows-Utopia · BIN 4154939
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
2,220 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: RACKMAN REALTY CORP · 4,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
BulkheadUnder Construction1p · 1 filing · 14 docs
Floor 2Under Construction12p · 2 filings · 20 docs
Floor 1Under Construction12p · 2 filings · 20 docs
CellarUnder Construction12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY DYNAMIC CONSTRUCTION C103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2021$885K—— → —$399/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS605/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.403/21/2026
GERALD J CALIENDO R A P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DYNAMIC CONSTRUCTION CGeneral Contractor1307/08/2026
FOUR POINTS P & H CORPPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519505/12/2026
IP CONCRETE TESTING AND I6252205/12/2026
Building Lifecycle
All (89)Filed (6)Permit Issued (9)Signed Off (1)Violation (1)Inspection (6)Objection (36)Special Inspection (30)
09/02/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Resolved
06/01/2026
Objection raised — Admin
06/01/2026
Objection raised — Cost
06/01/2026
Objection raised — Zoning
05/24/2026
Objection resolved — Addressed
05/19/2026
Objection raised — Scope
05/12/2026
Filed — Alteration
HEREWITH FILING ALTERATION FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR. FILED IN CONJUNCTION WITH ALTERATION CO NUMBER Q00543913-I1
Q00544040-P1
05/11/2026
Filed — Alteration CO
HEREWITH FILE ALTERATION TYPE ONE IN ORDER TO A VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING. TO ERECT INTERIOR PARTITIONS, TO DO MECHANICAL WORK, PLUMBING AND STRUCTURAL WORK-TYPES TO BE FILED UNDER DOB NOW BUILD AND TO OBTAIN A NEW CO
Q00543913-P3
05/11/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
05/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
05/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
05/11/2026
Special inspection requirement — Air barrier continuity plan testing
Younes Abouyaala
05/11/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/11/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
05/11/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/11/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/11/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
05/11/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
05/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
05/11/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/11/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
05/11/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
05/11/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/16/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/16/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
03/13/2026
Permit issued — Plumbing
Q00544040-I1-PL
02/17/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Scope
01/16/2026
Filed — Alteration CO
HEREWITH FILE ALTERATION TYPE ONE IN ORDER TO A VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING. TO ERECT INTERIOR PARTITIONS, TO DO MECHANICAL WORK, PLUMBING AND STRUCTURAL WORK-TYPES TO BE FILED UNDER DOB NOW BUILD AND TO OBTAIN A NEW CO
Q00543913-P2
06/18/2025
Signed off — Alteration
HEREWITH FILE TEMPORARY CONSTRUCTION PLYWOOD FENCE
Q00462238-I1
06/18/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/18/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/18/2025
Special inspection requirement — Air barrier continuity plan testing
Younes Abouyaala
07/25/2023
Permit issued — Construction Fence
Q00462238-I1-FN
05/25/2023
Permit issued — Mechanical Systems
Q00543913-I1-GC-CX
11/29/2022
Violation issued (ECB, closed)
Construction
11/21/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2022
Permit issued — Construction Fence
Q00462238-I1-FN
07/14/2022
Permit issued — Plumbing
Q00544040-I1-PL
05/20/2022
Permit issued — General Construction
Q00543913-I1-GC-CX
09/10/2021
Permit issued — Mechanical Systems
Q00543913-I1-GC-CX
07/27/2021
Permit issued — Construction Fence
Q00462238-I1-FN
07/12/2021
Objection raised — Fire_Protection
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP03/13/2026
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C07/25/2023
DOB NOWMechanical SystemsPermit IssuedNY DYNAMIC CONSTRUCTION C05/25/2023
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C07/21/2022
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP07/14/2022
DOB NOWGeneral ConstructionPermit IssuedNY DYNAMIC CONSTRUCTION C05/20/2022
DOB NOWMechanical SystemsPermit IssuedNY DYNAMIC CONSTRUCTION C09/10/2021
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C07/27/2021
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C06/23/2021
1 project · most recent 05/11/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2026Permit IssuedNY DYNAMIC CONSTRUCTION CHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 3 BTU ×12
Heating
Mitsubishi Electric M4H36W06060615-B 3 BTU ×12
Ventilation
Mitsubishi Electric M4H36W06060615-B 3 BTU ×9
1 project · most recent 05/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 11/11/2022
General Wiring
FiledStatusContractorScope
11/11/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/21/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
05/11/2026Air barrier — testing Younes Abouyaalaenergy_progress
05/11/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
05/11/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
05/11/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
05/11/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
05/11/2026Air barrier continuity plan testingYounes Abouyaalaenergy_progress
05/11/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
05/11/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/11/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
05/11/2026Mechanical SystemsYounes Abouyaalaspecial
05/11/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/11/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/11/2026FinalNAVEEN KUMARprogress
05/11/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/11/2026Fenestration air leakageYounes Abouyaalaenergy_progress
05/11/2026Exterior lighting powerYounes Abouyaalaenergy_progress
05/11/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
05/11/2026Maintenance informationYounes Abouyaalaenergy_progress
05/11/2026Lighting controlsYounes Abouyaalaenergy_progress
05/11/2026Fenestration areasYounes Abouyaalaenergy_progress
05/11/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/11/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
05/11/2026Permanent certificateYounes Abouyaalaenergy_progress
03/16/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/16/2026Maintenance informationYounes Abouyaalaenergy_progress
Latest 25 of 54.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/27/2026Q00544040-I1Request digital key ↗
08/16/2026Q00543913-I1Request digital key ↗
08/16/2026Q00543913-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026Q00462238-I1Request digital key ↗
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
03/08/2021440664586Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/08/2021440664586Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026Q00543913-P3Open ↗
08/13/2026Q00543913-P2Open ↗
08/13/2026Q00543913-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00543913-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWProgress Inspector Seal & Signature40
09/19/2026Q00543913-P2Open ↗
09/19/2026Q00543913-P2Open ↗
09/19/2026Q00543913-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/19/2026Q00543913-P2Open ↗
09/19/2026Q00543913-P2Open ↗
09/19/2026Q00543913-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00462238-I1Open ↗
08/27/2026Q00544040-P1Open ↗
08/27/2026Q00544040-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/08/2021440664586Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/15/2026Q00543913-P3Open ↗
08/13/2026Q00543913-P2Open ↗
08/13/2026Q00543913-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00544040-I1Open ↗
08/16/2026Q00543913-P2Open ↗
08/16/2026Q00543913-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00543913-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/08/2021440664586Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/15/2026Q00543913-P3Open ↗
08/13/2026Q00543913-I1Open ↗
08/13/2026Q00543913-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026Q00543913-P3Open ↗
08/13/2026Q00543913-I1Open ↗
08/13/2026Q00543913-P2Open ↗
▸DOB NOWPlot Diagram3
08/15/2026Q00543913-P3Open ↗
08/13/2026Q00543913-I1Open ↗
08/13/2026Q00543913-P2Open ↗
▸DOB NOWSURVEY: INITIAL3
08/15/2026Q00543913-P3Open ↗
08/13/2026Q00543913-P2Open ↗
08/13/2026Q00543913-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/08/2021440664586Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00543913-I1Open ↗