← Back
Two stories - detached, small or mid-size
75-19 187 STREET
QUEENS · BIN 4155044
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
2,048 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,100 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPLEN CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/19/2021$875K—— → —$427/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBERT ARONOV ARCHITECT606/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor603/21/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALBERT ARONOV772506/13/2023
TRIANGLE INSPECTION & TES7495203/27/2023
Building Lifecycle
All (64)Filed (6)Permit Issued (4)Signed Off (2)Violation (4)Inspection (8)Objection (10)Special Inspection (30)
11/06/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH JOB #Q00609224
Q00674485-I1
10/06/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/20/2023
Special inspection requirement — Lighting in dwelling units
Albert Aronov
06/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Aronov
06/20/2023
Special inspection requirement — Insulation placement and R values
Albert Aronov
06/20/2023
Special inspection requirement — Metering
Albert Aronov
06/20/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Albert Aronov
06/20/2023
Special inspection requirement — Mechanical Systems
Albert Aronov
06/20/2023
Special inspection requirement — Footing and Foundation
Albert Aronov
06/20/2023
Special inspection requirement — Air barrier - visual inspection
Albert Aronov
06/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Albert Aronov
06/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Albert Aronov
06/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Albert Aronov
06/20/2023
Special inspection requirement — Concrete - Cast-In-Place
Albert Aronov
06/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Albert Aronov
06/20/2023
Special inspection requirement — Structural Steel - Details
Albert Aronov
06/20/2023
Special inspection requirement — Structural Wood Frame
Albert Aronov
06/20/2023
Special inspection requirement — Final
Albert Aronov
06/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Albert Aronov
06/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Albert Aronov
06/20/2023
Special inspection requirement — Shutoff dampers
Albert Aronov
06/20/2023
Special inspection requirement — Fenestration areas
Albert Aronov
06/20/2023
Special inspection requirement — Maintenance information
Albert Aronov
06/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Albert Aronov
06/13/2023
Filed — Alteration CO
RENOVATION AND ENLARGEMENT OF EXISTING ONE FAMILY DWELLING
Q00609224-P3
06/11/2023
Special inspection requirement — Final
Albert Aronov
06/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Albert Aronov
06/11/2023
Special inspection requirement — Structural Steel - Details
Albert Aronov
06/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Albert Aronov
06/11/2023
Special inspection requirement — Mechanical Systems
Albert Aronov
06/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Aronov
06/11/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Albert Aronov
06/11/2023
Special inspection requirement — Concrete - Cast-In-Place
Albert Aronov
03/27/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH JOB #Q00609224
Q00674485-P1
03/20/2023
Permit issued — Plumbing
Q00674485-I1-PL
03/17/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/08/2023
Signed off — Alteration
Q00637771-I1
09/07/2022
Violation issued (ECB, closed)
Unknown
09/07/2022
Violation issued (ECB, closed)
Construction
07/27/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/27/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/31/2022
Objection resolved — Addressed
05/30/2022
Objection raised — Scope
05/26/2022
Filed — Alteration CO
RENOVATION AND ENLARGEMENT OF EXISTING ONE FAMILY DWELLING
Q00609224-P1
05/19/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Violation issued (ECB, closed)
Construction
02/12/2022
Permit issued — Plumbing
Q00674485-I1-PL
02/04/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH JOB #Q00609224
Q00674485-I1
01/13/2022
Permit issued — Construction Fence
Q00637771-I1-FN
01/06/2022
Permit issued — Structural
Q00609224-I1-GC-CX
12/19/2021
Objection raised — Zoning
12/19/2021
Objection resolved — Addressed
11/26/2021
Filed — Alteration
Q00637771-I1
10/15/2021
Objection raised — Scope
10/15/2021
Objection resolved — Addressed
10/15/2021
Objection raised — Energy
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC03/20/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC02/12/2022
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC01/13/2022
DOB NOWStructuralPermit IssuedSPLEN CONSTRUCTION INC01/06/2022
1 project · most recent 06/13/2023
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/13/2023Permit IssuedSPLEN CONSTRUCTION INCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZA06NA 20,000 BTU · Fan Coil Indoor ×4
Heating
Navien Weil McLain - ultra 299 240,000 BTU · Boiler ×1
NCB-240E 240,000 BTU · Boiler ×1
1 project · most recent 06/06/2023
General Wiring
FiledStatusContractorScope
06/06/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/13/2023
Steel Concrete Wood
FiledStatusContractorScope
06/13/2023Permit IssuedSPLEN CONSTRUCTION INCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/17/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
06/20/2023Lighting in dwelling unitsAlbert Aronovenergy_progress
06/20/2023MeteringAlbert Aronovenergy_progress
06/20/2023HVAC-R and service water piping design and insulationAlbert Aronovenergy_progress
06/20/2023HVAC-R and service water heating system controlsAlbert Aronovenergy_progress
06/20/2023Maintenance informationAlbert Aronovenergy_progress
06/20/2023HVAC-R and service water heating equipmentAlbert Aronovenergy_progress
06/20/2023Fenestration areasAlbert Aronovenergy_progress
06/20/2023Shutoff dampersAlbert Aronovenergy_progress
06/20/2023Insulation placement and R valuesAlbert Aronovenergy_progress
06/20/2023Air barrier - visual inspectionAlbert Aronovenergy_progress
06/20/2023Fenestration and door U-factor and product ratingsAlbert Aronovenergy_progress
06/20/2023Fire-Resistance Rated ConstructionAlbert Aronovprogress
06/20/2023Footing and FoundationAlbert Aronovprogress
06/20/2023FinalAlbert Aronovprogress
06/20/2023Structural Wood FrameAlbert Aronovprogress
06/20/2023Energy Code Compliance InspectionsAlbert Aronovprogress
06/20/2023Mechanical SystemsAlbert Aronovspecial
06/20/2023Structural Steel - DetailsAlbert Aronovspecial
06/20/2023Fire-Resistant Penetrations and JointsAlbert Aronovspecial
06/20/2023Concrete - Cast-In-PlaceAlbert Aronovspecial
06/20/2023Excavations - Sheeting, Shoring, and BracingAlbert Aronovspecial
06/20/2023Structural Stability – Alterations of existing buildingsAlbert Aronovspecial
06/11/2023MeteringAlbert Aronovenergy_progress
06/11/2023Concrete - Cast-In-PlaceAlbert Aronovspecial
06/11/2023Excavations - Sheeting, Shoring, and BracingAlbert Aronovspecial
Latest 25 of 69.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00637771-I1Request digital key ↗
08/26/2026Q00674485-P1Request digital key ↗
08/26/2026Q00674485-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00609224-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature15
08/28/2026Q00609224-P1Open ↗
08/28/2026Q00609224-P1Open ↗
08/28/2026Q00609224-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00674485-P1Open ↗
08/26/2026Q00674485-I1Open ↗
08/26/2026Q00609224-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026Q00609224-P1Open ↗
08/26/2026Q00674485-P1Open ↗
08/26/2026Q00674485-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00609224-P1Open ↗
08/13/2026Q00609224-I1Open ↗
08/13/2026Q00609224-P3Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00609224-P3Open ↗
08/13/2026Q00609224-P1Open ↗
08/13/2026Q00609224-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00609224-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00674485-I1Open ↗
08/26/2026Q00674485-P1Open ↗
08/26/2026Q00609224-P3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00609224-I1Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram3
08/13/2026Q00609224-P3Open ↗
08/13/2026Q00609224-P1Open ↗
08/13/2026Q00609224-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00609224-P3Open ↗
08/13/2026Q00609224-I1Open ↗
08/13/2026Q00609224-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00609224-I1Open ↗
08/13/2026Q00609224-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00609224-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00609224-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00609224-I1Open ↗